Electrical stations, switch rooms and server rooms

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

Pryda Floor & Rafter Truss Systems
ASM Modular Systems Innovations in Access Floor. Product Overview.
Knock Down Fittings Product Design.
Calcit Gospić Factory of calcite fillers Delivery and commissioning of medium and low voltage cabinets Elektro-Čelik d.o.o. Markovićeva 28 Križevci, Croatia.
Cap Sewing with HCS-1201 Voyager
By: Nick Copeland 05/02/2011 CorDEX Instruments Ltd IW Series Installation Guide – Can installing an IR Window really be this easy? IW Series - Intelligent.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Heavy Concrete Construction Formwork
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
Digital Counter Training Video’s & Instructions. Contents: Digital Counter Components Step 1: How to assemble the Digital Counter Step 2: How to attach.
GB Patent No Intnl Patent Pending - Peter deBoeck © Slick System of Plug-in Electrical Accessories The new concept in electrical wiring devices.
ArcelorMittal Technotron s.r.o. Expanded Metal – Fliers and Framings November 2008.
Specification section 3.3
How to Construct a Robot Part 7: Wiring and Controller Installation Copyright © Texas Education Agency, All rights reserved. 1.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
Electrical Power Systems
Installation. Indoor Unit Installation Typical Installation.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Helical Milling Unit 71.
IMMOBILE ACCESS FLOOR SYSTEM  The immobile access floor system is a product which is suitable for different official places. The material.
© 2004 Swagelok Company igc ™ II Modular Surface-mount Design Design.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
INTER-LAKES BASES PRODUCTS. MODEL B-75 MACHINE BASE B-75 Model with panels and doors.
NEW SLIDING DOOR OPERATOR SERIES A140 AIR
Department of Civil Engineering,
1 Suitable for copper, fiber optics or hybrid outside plant applications Cross Connection Cabinets.
Distributed in the Phils. by: Filipinas Multi-line Corporation ICT Division Tel. No
Wood Construction CTC-375.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Typical product developments and applications JF Daucourt Product Development & Quality Manager.
Rotation On a coordinate grid. For a Rotation, you need An angle or fraction of a turn –Eg 90° or a Quarter Turn –Eg 180° or a Half Turn A direction –Clockwise.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
Unifloor Installation at Metro Simulation and Control Room UNIFLOOR™ Raised Access Flooring Solutions.
Company Confidential CABLOFIL ® New Products 2007 / 2008.
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
1 C-side VFE-FE: PS cabling Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) Cable trays design: 1.PS-top cable tray 2.PS/SPD lateral cable.
ELEVATORS.
TAKE ‘N’ TRAIN ZONEX™ NON-METALLIC TERMINAL ENCLOSURE.
Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 1 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up Exchanging.
Page 1 Lift/sliding door system PremiDoor 88 Pirmasens, February 2013.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
POWERLINC A flexible, reconfigurable power distribution system designed specifically for control rooms. 1.
The Indexing or Dividing Head
RF Retrofit Kit installation guide
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
The total display solutions
Plan for the installation of the TAMU screen
Alpha – Project steps & common errors
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
MKTG 2016.
Module 6 Antenna Assembly and Look up Angles
SION Vacuum Circuit-Breaker For Standard Applications
171-SH SH Box with Pre-Installed 101⁄2" Pigtail Popular 4" square boxes and switch boxes Pre-installed 101⁄2" insulated grounding.
MKTG 2016.
Universal Parallel Gripper
Customer Presentation
IRC5C second generation Overview
Customer Presentation
Rotation On a coordinate grid.
Floor outlet boxes British Standard
Presentation transcript:

Electrical stations, switch rooms and server rooms Raised Access Floors Electrical stations, switch rooms and server rooms

Raised Floor Pedestals Head plate For screwing of panels and stringers For fixing of the pedestal bracing For fixing of the gasket For fixing of the gasket Fixing of standard stringer Hole for locking glue

Reinforcement profiles Overview CL 41 x 40 x 1 CM 84 x 40 x 1.7 CH 126 x 40 x 2 CS 41 x 40 x 1.7 Profile dimensions

C – Profiles Advantages: Easy installation Huge time saving with spring clip installation Standard range of pedestals Product is protected by utility patent

High Strength Reinforcement Profiles Fixing Variant 1: Install spring clip from below into the slot Turn of 90° clockwise Also with deinstallation!

High Strength Reinforcement Profiles Fixing Variant 2: Install hammer head screw from below into the slot Rotate screw 90° and tighten it

High Strength Reinforcement Profiles Panel support Fixing gasket: Support of the raised floor panels Fixing gasket with four noppes for supporting the corners of the panel

High Strength Reinforcement Profiles Parallel and cross connectors Connection of reinforcement profiles: Cross connector: - Connection on the reinforcement profile with drilling screws - Connection of the crossing reinforcement profile with drilling screws

High Strength Reinforcement Profiles Parallel and cross connectors Connection of reinforcement profiles: Parallel connector: - Connection on the reinforcement profile with drilling screws - Connection of the additional reinforcement profile with drilling screws

Reinforcement profiles

Switchgear Construction for Server / Control Rooms Installation frame Panel Reinforcement profile System solution: Placing of the pedestals (grid acc. to plan) Installation of the reinforcement profiles regardless the later position of the control resp. Server cabinets Mounting of a installation frame: Support structure for later installations Position of the frame anywhere possible Keeping of the floor grid by displacing the installation frame by the half of the switchgear width - No cut panels necessary with the positioning of the installation frame in the grid

Switchgear construction Later conversion Flexibility with change of use: Replacing of switchgear cabinet / server is easily possible Replacing of the installations in the panel grid: - Replacing of the installation frame in a different grid field - Closing of the previous opening with the panel which were taken out of the new opening - Replacing and cabling of the equipment

Switchgear construction Later conversion Flexibility with change of use: - Replacing of the installation frame in any desired position regardless the panel grid - Fixing of the installation frame with cross resp. longitudinal connectors - Closing of the previous opening with the panel which were taken out of the new opening - If necessary, cut panels have to be supported with additional reinforcement profiles - Replacing and cabling of the equipment

Switch Room Construction for server rooms / switch rooms Application area: With high loads In computer centres or switch rooms With high construction heights of the system floors With dynamic loads

Thank you for your attention!