GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Gary.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review LAT Test Verification Process Presentation 4 of 12 GLAST Large Area Telescope Gamma-ray Large.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.
GLAST Large Area Telescope:
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Single-CAL Test and Calibration
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST LAT System Engineering
GLAST Large Area Telescope Instrument Science Operations Center
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Overview Goal Study GEM variables in SVAC ntuple
Mini Tower Preliminary Results
GLAST LAT System Engineering
Integration and Test Organization Chart
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
Introduction and Overview
Eduardo do Couto e Silva Feb 28, 2006
SVAC Configuration Verification
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo, Eric Grove and Pat

GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 2/5 Overview of Cosmic Ray Tests Goals for this meeting –Agree on final list of cosmic ray data taking –Hardware configuration –Register configuration –Test duration Assumptions for test sequence –Trigger and Data flow functionality has already been tested –Validated calibration constants are available prior to tests –including operational settings (e.g. thresholds, time delays) Overview of Tests –Number : 12 –to be distributed among Phase 1 and 2 according to schedule constraints –Duration : 96 hours –Does not include overhead for setting up and performing data taking –Data Analysis Results –The goal is to present results on Instrument Analysis Workshop 6 »First week of March SLAC

GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 3/5 Trigger Engine Configuration for all tests The trigger engine matrix has already been presented in the following meetings –Test Planning –Trigger –Calibration & Analysis Eric Grove is currently consolidating the information For this talk we assume the consolidated matrix will be used for all tests –unless explicitly stated

GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 4/5 LAT SVAC/E2E System Tests : Phase 1 and 2 SVAC Tests –Overhead for test time and schedule constraints to be included by IFCT (Larry) –Test ID to be agreed between system engineering and online (Pat/Ric) –In case of need to change test ID please inform SVAC List of Tests in Chronological Order LAT 701: Flight configuration on the GND - primary side of GASU 1 hour LAT 702: Flight configuration on the GND - redundant side of GASU 1 hour All 8XX tests use Flight configuration on the GND LAT 801: Unregulated Power Supply set to 27V 1 hour LAT 811: Unregulated Power Supply set to 29V 1 hour – Condition Scan CR Test in LAT-MD LAT 821: pulser 15 KHz and cosmic rays 1 hour – Nominal Rate CR Test in LAT-MD LAT 831: pulser 15 KHz and cosmic rays 1 hour –CAL muon gain – Nominal Rate CR Data Volume Test in LAT-MD LAT 841 : Unregulated Power Supply set to 27V and pulser 15 KHz and cosmic rays 1 hour LAT 851 : Unregulated Power Supply set to 29V and pulser 15 KHz and cosmic rays 1 hour – Nominal Rate Condition Scan CR Test in LAT-MD “Runs for the record” LAT 701: Flight configuration on the GND - primary side of GASU 48 hours LAT 702: Flight configuration on the GND - redundant side of GASU 8 hours LAT 711: Muon Calibration - primary side of GASU 16 hours –Flight configuration on the GND but CAL front-ends set to muon gain LAT 701: Flight configuration on the GND - primary side of GASU 16 hours –LAT oriented horizontally – baseline for NRL

GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 5/5 Test Consolidation Goal: eliminate test redundancy –If a test is redundant –do NOT add to the SVAC list –ensure the number of cosmic ray triggers is sufficient for SVAC data analysis The following tests were eliminated from SVAC/E2E tests –they appear elsewhere LAT 721: ACD calibrations using ACD only: 4 hours –ACD CPT (triggerOps) LAT 731: Data Transport Errors 1 hour –LAT 660 (Operation and Test Plan LAT-MD ) – –System Engineering will add 1 hour of muons for this test –Recommendation from Committee on E2E testing ( in LAT-MD ) - T&DF Data Transport Errors LAT 741 : GEM self-Integrity test (Data taken during Trigger Tests) 4 hours –LAT 211 (2.2.5 in Trigger Test Plan LAT-MD ) – GEM self-Integrity test –Recommendation from Committee on E2E testing ( in LAT-MD ) - T&DF False Triggers LAT 751 : GEM Trigger engines (Data taken during Trigger Tests) 3 hours –LAT 211 (2.2.8 in Trigger Test Plan LAT-MD ) – GEM Trigger Engine test –Trigger group will add 10 min of muons cycled through all engines LAT 761 : L1 Veto Efficiency (Data taken during Trigger Tests) 2 hours – LAT 211 (2.2.5 in Trigger Test Plan LAT-MD ) – VETO Efficiency test –Trigger group will ensure min of 2 hours of cosmic ray data taking