Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.

Slides:



Advertisements
Similar presentations
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
Advertisements

Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
The Autoalignment System of GEO 600 Hartmut Grote and the GEO 600 team Max-Planck Institute for Gravitational Physics Amaldi, Perth
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Dual Recycling for GEO 600 Andreas Freise, Hartmut Grote Institut für Atom- und Molekülphysik Universität Hannover Max-Planck-Institut für Gravitationsphysik.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
LIGO NSF review, 11/10/05 1 AdLIGO Optical configuration and control Nov 10, 2005 Alan Weinstein for AdLIGO Interferometer Sensing and Control (ISC) and.
LIGO NSF review, 11/10/05 1 AdLIGO Optical configuration and control Nov 10, 2005 Alan Weinstein for AdLIGO Interferometer Sensing and Control (ISC) and.
NSF : Nov. 10, LIGO End to End simulation overview  Time domain simulation written in C++  Like MATLAB with Interferometer toolbox  Major physics.
LIGO-G W Where Did the LSC Signals Come From? Fred Raab 27 June 02.
Use ofSiesta in VIRGO commissioning Lisa Barsotti University of Pisa – INFN Pisa For the Virgo collaboration Caltech, December 19th 2003.
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation.
Q09/2001 The GEO 600 Laser System LIGO-G Z V. Quetschke°, M. Kirchner°, I.Zawischa*, M. Brendel*, C. Fallnich*, S. Nagano +, B. Willke° +, K.
Koji Arai – LIGO Laboratory / Caltech LIGO-G v1.
Stefan Hild 1ILIAS WG1 meeting, Cascina, November 2006 Comparison of tuned and detuned Signal-Recycling Stefan Hild for the GEO-team.
Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
GEO‘s experience with Signal Recycling Harald Lück Perugia,
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
LIGO- G R Telecon on June, Mach-Zender interferometer to eliminate sidebands of sidebands for Advanced LIGO Osamu Miyakawa, Caltech.
Variable reflectivity signal-recycling mirror and control Stefan Goßler for the experimental team of The ANU Centre of Gravitational Physics.
LIGO- G R Sensing and control, SPIE conference, June Sensing and control of the Advanced LIGO optical configuration SPIE conference at.
Arm Length Stabilisation for Advanced Gravitational Wave Detectors Adam Mullavey, Bram Slagmolen, Daniel Shaddock, David McClelland Peter Fritschel, Matt.
Koji Arai – LIGO Laboratory / Caltech LIGO-G v2.
Conversion of the Glasgow 10m Prototype for Detuned Operation Bryan Barr Institute for Gravitational Research University of Glasgow LSC - AIC August 13.
Harald Lückfor the GEO600 Comissioning team 1ILIAS Meeting, Palma, Oct Title GEO 600 Commissioning Status Based on a talk of Stefan Hild for the.
LSC-March  LIGO End to End simulation  Lock acquisition design »How to increase the threshold velocity under realistic condition »Hanford 2k simulation.
RSE Experiment in Japan Feb. 20 th, 2004 Aspen Meeting LIGO-G Z K.Somiya, O.Miyakawa, P.Beyersdorf, and S.Kawamura.
LIGO- G R Aspen winter conference, January Toward the Advanced LIGO optical configuration investigated in 40meter prototype Aspen winter.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
Advanced LIGO Simulation, 6/1/06 Elba G E 1 ✦ LIGO I experience ✦ FP cavity : LIGO I vs AdvLIGO ✦ Simulation tools ✦ Time domain model Advanced.
ILIAS WG1 meeting Han/Ruthe Harald Lück ILIAS WG1 meeting, Sep. 2004, Hannover/Ruthe GEO Status (Update)
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
LSC Meeting at LHO LIGO-G E 1August. 21, 2002 SimLIGO : A New LIGO Simulation Package 1. e2e : overview 2. SimLIGO 3. software, documentations.
Institute for Cosmic Ray Research Univ. of Tokyo Development of an RSE Interferometer Using the Third Harmonic Demodulation LIGO-G Z Osamu Miyakawa,
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Optical Spring Experiments With The Glasgow 10m Prototype Interferometer Matt Edgar.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Joshua Smith July 2004 Identifying limiting noise sources of GEO600 ILIAS WG1 Meeting Joshua Smith for the GEO team.
Status of GEO600 Benno Willke for the GEO600 team ESF Exploratory Workshop Perugia, September 2005.
Internal Mode Qs of Monolithically Suspended Test Masses in GEO600 Joshua Smith, Harald Lück, Stefan Goßler, Gianpietro Cagnoli, David Crooks, Sheila Rowan,
FINESSE FINESSE Frequency Domain Interferometer Simulation Andreas Freise European Gravitational Observatory 17. March 2004.
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
GEO600 – The output mode cleaner Mirko Prijatelj for the GEO600-Team Institute for Gravitational Physics Albert-Einstein-Institute Hannover / Germany.
Interferometer configurations for Gravitational Wave Detectors
Detuned Twin-Signal-Recycling
GEO600 Control aspects where do the error signal come from?
A study of Arm Length Stabilization in KAGRA
Signal recycling R&D at LAL: Influence in Virgo
Homodyne readout of an interferometer with Signal Recycling
Installation of new MPR
Commissioning progress Stefan Hild Ilias WG1 meeting, Sep 2005
Measuring Gravitational Waves with GEO600
40m Laboratory Upgrade Progress Report
Effect of sideband of sideband on 40m and Advanced LIGO
Advanced LIGO optical configuration investigated in 40meter prototype
Optimal on-line time-domain calibration of the
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Homodyne detection: understanding the laser noise amplitude transfer function Jérôme Degallaix Ilias meeting – June 2007.
Presentation transcript:

Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut Abstract Dual Recycling has become a great challenge in terms of commissioning of GEO600. To achieve this, we need: Frequency domain simulations (Finesse): Transfer functions or error signals within a huge parameterspace Equilibrium state of the detector Time domain simulations (End to End Model): Interaction of optical, mechanical and electronical components of the experiment. Dynamic behaviour of the detector Length control system of GEO600 Errorpoint of the PRC feedback loop of dual recycled GEO600 for different tunings of the Michelson interferometer and two states of the SRC 1. The plan is first to catch and lock the mirrors of the largely detuned detector and then continuously to tune the detector down to ~ 100 Hz. 1 Hartmut Grote. Making it Work: Second Generation Interferometry in GEO600! PhD thesis, Max Planck Institute for Gravitational Physics, June 2003 Simplified dual recycling lock control scheme of GEO600. The modecleaners, partly actuators for the frequency feedback, are omitted for clarity. Locking sequence: 1. light frequency (power recycling cavity (PRC)) 2. differential Michelson armlength (MID) 3. signal recycling cavity (SRC) Institut für Atom- und Molekülphysik Finesse is an interferometer simulation program that builds a set of linear equations representing an optical setup and solves them in the frequency domain, i.e. the system is always assumed to be in an equilibrium state. It can be used to calculate for example a transfer function from a mirror motion to the in-phase demodulated signal of a photodetctor at the interferometer output. 1 For further information please view Frequency domain simulations with Finesse Transfer of the Schnupp sidebands to the photodiode for the MSR feedback in case of a tuned GEO600 detector. Plans......with Finesse: Investigate the errorsignals with a different transmittivity of MSR of 5% (instead of 1%): PRC control signal dependent on MSR position and Michelson differential tuning. technical feasibility of moving from a largely detuned to tuned state: How closely can MSR be moved to the tuned case position? gain and demodulation phase changes of SRC and MID Can there be any signal extracted from the detector for an automatic gain control for the relevant control signals?...with E2E Implementation of SRC feedback. Tests and improvements of largely detuned dual recycling lock acquisition with higher order modes. Seismic excitation of the mirror motion instead of discrete frequencies. Tests and improvements of the process of switching from detuned to tuned dual recycling. Tests of dual recycling in case of MSR transmittivity of 5%. Zerocrossings of the SRC errorpoint depending on the Schnupp modulation frequency. Time domain simulations with End to End Model The End to End Model (E2E) is a simulation program (developed by LIGO), that is able to describe a complete interferometer taking into account its optical, mechanical and electronical features 1. 1 For further information please view E2E calculates the output of subsystems in the time domain and was used to simulate the dynamic behaviour of a simplified GEO600 model. Contact: Measurement with the power recycled GEO600 detector and the according E2E simulation. Only the PRC is locked. A schematic overview of the simulated GEO600 experiment. power recycling feedback on Michelson differential feedback on E2E simulation example of a PRC and Michelson lock acquisition. SR tuning = 30 Deg. ESD IM The 'real' triple pendulum suspension of the end mirrors MCe and MCn. The virtual GEO600 setup created with the graphical user interface of E2E named ALFI. SR tuning = 0 Deg. MI errorpoint PR refl. Power BS power PR refl. power MID errorpoint PR refl. power Cavity power MCn motion Time [s] PR refl. power Cavity power MCn motion MCe motion MPR motion IM ESD Mfn MFe MCn MCe MPR BS EOM3 EOM5 Nd:YAG MPR tuning [Deg.] MI tuning [Deg.] MID errorpoint slope SRC errorpoint slope PRC errorpoint slope MSR tuning [kHz] MID demodulation phase SRC demodulation phase MSR tuning [kHz] Demodulation phase [Deg.] Gain [a.u.] Changes of the errorpoint slope and the demodulation phase of the feedback loops for MID, SRC and PRC moving the MSR position along the green line of the figure at lower left.