1 WP7 (Network) status &plans Paris 6 th of March 2002 Pascale PRIMET INRIA/ RESO - ENS Lyon

Slides:



Advertisements
Similar presentations
1 Grid networking in EU DataGRID TERENA conference Limerick - 5 th of June 2002 Pascale PRIMET Manager of the workpackage Network of the DataGRID project.
Advertisements

WP2: Data Management Gavin McCance University of Glasgow November 5, 2001.
GridPP Meeting, Cambridge, 14 Feb 2002 Paul Mealor, UCL Networking Paul Mealor.
MB - NG MB-NG Technical Meeting 03 May 02 R. Hughes-Jones Manchester 1 Task2 Traffic Generation and Measurement Definitions Pass-1.
Nicolas Simar – DANTE : Premium IP and LBE transparency on GEANT QoS on GÉANT Premium IP and Less than Best Effort.
IPv6 TF-NGN 8 Berlin, 2 nd July Agenda Review GTPv6 status D9.6 GEANT deliverable Presentations from participants –JOIN, RENATER, POZNAN 6NET –Outputs,
EU 2nd Year Review – Feb – WP2/WP7 demonstration – n° 1 WP7 Report Status on Release 2.0 and plans CNRS/UREC.
Andrew McNab - EDG Access Control - 14 Jan 2003 EU DataGrid security with GSI and Globus Andrew McNab University of Manchester
A conceptual model of grid resources and services Authors: Sergio Andreozzi Massimo Sgaravatto Cristina Vistoli Presenter: Sergio Andreozzi INFN-CNAF Bologna.
EU-GRID Work Program Massimo Sgaravatto – INFN Padova Cristina Vistoli – INFN Cnaf as INFN members of the EU-GRID technical team.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Cracow Grid Workshop, November 5-6, 2001 Towards the CrossGrid Architecture Marian Bubak, Marek Garbacz, Maciej Malawski, and Katarzyna Zając.
GridPP meeting Feb 03 R. Hughes-Jones Manchester WP7 Networking Richard Hughes-Jones.
The CrossGrid project Juha Alatalo Timo Koivusalo.
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
Workload Management Massimo Sgaravatto INFN Padova.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
LBE TF-NGN Budapest October Agenda GÉANT D9.9 deliverable summary Test reports for LBE on GÉANT (Nicolas) Tests for LBE at the edge Limerick.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Tiziana FerrariNetwork metrics usage for optimization of the Grid1 DataGrid Project Work Package 7 Written by Tiziana Ferrari Presented by Richard Hughes-Jones.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
GRID IIII D UK Particle Physics GridPP Collaboration meeting - R.P.Middleton (RAL/PPD) 23-25th May Grid Monitoring Services Robin Middleton RAL/PPD24-May-01.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
Your university or experiment logo here Caitriana Nicholson University of Glasgow Dynamic Data Replication in LCG 2008.
INFN-GRID Testbed Monitoring System Roberto Barbera Paolo Lo Re Giuseppe Sava Gennaro Tortone.
Heavy and lightweight dynamic network services: challenges and experiments for designing intelligent solutions in evolvable next generation networks Laurent.
Virtual Data Grid Architecture Ewa Deelman, Ian Foster, Carl Kesselman, Miron Livny.
Author - Title- Date - n° 1 Partner Logo EU DataGrid, Work Package 5 The Storage Element.
D0RACE: Testbed Session Lee Lueking D0 Remote Analysis Workshop February 12, 2002.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
Franck Bonnassieux- WP7- n° 1 WP7 Budapest Collaboration with Dante Monitoring & R-GMA GridFTP Logging Network Cost Function MapCenter & TopoGRID Future.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
Network design Topic 6 Testing and documentation.
WP 10 ATF meeting April 8, 2002 Data Management and security requirements of biomedical applications Johan Montagnat - WP10.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Vassiliki Pouli
A demonstrator for IST 2001 G. Romier UREC Lyon. What is IST2001? the IST projects Exhibition is dedicated to displaying the results of projects within.
WP7 Middleware Status and Plans Paul Mealor. Contents GridFTP monitoring Network monitoring information in RGMA UK network monitoring.
Data Transfer Service Challenge Infrastructure Ian Bird GDB 12 th January 2005.
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK
Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
Networking and the Grid Ahmed Abdelrahim NeSC NeSC PPARC e-Science Summer School 10 th May 2005.
CERN 1 DataGrid Architecture Group Bob Jones CERN.
Bob Jones – Project Architecture - 1 March n° 1 Project Architecture, Middleware and Delivery Schedule Bob Jones Technical Coordinator, WP12, CERN.
BDTS and Its Evaluation on IGTMD link C. Chen, S. Soudan, M. Pasin, B. Chen, D. Divakaran, P. Primet CC-IN2P3, LIP ENS-Lyon
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
Networking Issues of Grid Infrastructures Proposition for a new structure and submission at GGF11 Pascale Vicat-Blanc Primet CongDuc Pham INRIA RESO Ecole.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
Bob Jones EGEE Technical Director
StoRM: a SRM solution for disk based storage systems
EO Applications Parallel Session
Sergio Fantinel, INFN LNL/PD
Networking for grid Network capacity Network throughput
WP7 objectives, achievements and plans
Network Requirements Javier Orellana
WP2/WP7 Demonstration WP7 High Throughput Data transfers WP2/WP7 Replica Selection based on Network Cost Functions WP2 Replica Location Service.
Report on GLUE activities 5th EU-DataGRID Conference
The EU DataGrid Project Tutorial
Wide Area Workload Management Work Package DATAGRID project
Presentation transcript:

1 WP7 (Network) status &plans Paris 6 th of March 2002 Pascale PRIMET INRIA/ RESO - ENS Lyon

Pascale PRIMET/ INRIA2 WP7 specificity In testbed0 and testbed1 the networking functionality was here (<= IP technology) WP7 is in charge of a shared resource called “Network Element” –Quantifiable => network monitoring –Efficient => advanced transport protocols –Flexible => differentiated network services –Secure => firewalls/ encrypted channels?

Pascale PRIMET/ INRIA3 Logical view of the Grid Network Ressource = CE (computing element) ou Ressource = SE (storage element)

Pascale PRIMET/ INRIA4 « Physical » view of the Network Public Network No security No predictable performances No control on the traffic R = CE ou R = SE The flat INTERNET

Pascale PRIMET/ INRIA5 WP7 aims => WP7 is helping Network Service Provider in designing specific E2E network services by mapping the application/middleware requirements to network services (QoS, Multicast, security…) <=WP7 is helping A/Mw in getting E2E performance : measurement, problems (TCP tuning, hardware limitations….)

Pascale PRIMET/ INRIA6 What is a “ Network Element”? SiteA SiteBSiteD SiteC Network Element associated to the SiteA

Pascale PRIMET/ INRIA7 How to characterize a “NE”? a NE is belonging to some Site A NE is a “shared resource” that permit communication over a WAN interconnexion a NE is a set of oriented IP links a NE is characterized at IP level by: A loss rate mean/max/average… A loss pattern A delay mean/max/average… A delay pattern A nominal rate (or TCP throughput) mean/max/average… An aggreed QoS….(SLA) WP7 is discussing this concept, trying to clarify and model it for the ATF

Pascale PRIMET/ INRIA8 WP7 specific plan for 2002 T7.1 : Collaboration with Dante/NRENs/SEQUIN –Pilot services test (QoS, multicast) –Dedicated machines in GEANT PoPs T7.2 : QoS and advanced services - Requirements studies and test (WP10) - Reliable Multicast - High performance transport protocol (TCP/nonTCP) T7.3 : Network Monitoring Architecture –Refine the model with WP2/WP3 –Prepare a plan to analyse monitoring data T7.4 : Security => pls see Dave Kelsey talk on Friday morning

Pascale PRIMET/ INRIA9 WP7 Strategy Year1: –Network requirements studies –Network connectivity/capacity evaluation –Initial network monitoring architecture proto/test Year2: –Optimize the Monitoring Architecture (visualization, measurement scheduling, data analysis…) –Performance optimization –Security design –Experiments and developments with Net providers, with other network projects (Geant, Sequin? DataTag)

Pascale PRIMET/ INRIA10 WP7 strategy Year2 : study/test; Year3: provide –Network forecasting tools/API (perf opt) –Grid traffic monitoring tools (accounting) –High throughput services/API? (perf opti) –Reliable multicast service/API? (new service)

Pascale PRIMET/ INRIA11 Network Monitoring Architecture P_RTPLP_NWSMiddleware Data Collector Raw IPerfGridFTPSNMP…PingEr Mesurement Publication MapCenter RTPL Resource BrokerNetwork managers Data processor LDAP Forecaster Analysis/ processing P_RTPLP_NWSMiddleware Data Collector Raw IPerfGridFTPSNMP…PingEr Storage MapCenter RTPL Resource BrokerNetwork managers Data processor LDAP Forecaster

Pascale PRIMET/ INRIA12 Collaboration with GEANT E2E :Close participation to pilot services –Test of IP Premium service/WP10 In Backbone : –Use of dedicated machines in GEANT POPs Amsterdam, Geneva, London –Tests of high throughput transfers –Test of IP multicast for Reliable Multicast –Sharing WP7 monitoring and DANTE monitoring data

Pascale PRIMET/ INRIA13 WP7 and other collaborations WP7 and DataTAG –QoS service study and experiment –High Throughput study and experiment –Network monitoring and measurement

Pascale PRIMET/ INRIA14 WP7 and other WPs interactions WP1 – WP2 : monitoring/forecasting for scheduling/ optimization WP3 : NetMon/R-GMA test /MapCenter integration WP6 : provisionning/ firewall config/ LAN config/Netmon deployment… WP : VO links and traffic monitoring, QoS and perf requirement studies/test

Pascale PRIMET/ INRIA15 WP3/WP7/WP4 : Monitoring 14H30 – 16H : 5th of March /EDG Paris conference Netsaint presentation (INFN) Discussion : how GUI can be interfaced with MapCenter, R-GMA and WP4 sensors? Coordination of the Network Monitoring activity in EDG - WP3/WP7 interaction: - GRIDftp logs

Pascale PRIMET/ INRIA16 WP7/WP2/WP1: optimization Tuesday afternoon 16h-18h : Presentation of the Query Optimization API (WP2) Presentation of the replica optimisation based on an economical model Algorithm for network optimization (network cost function) (WP7) Discussion : coordination of this activity  WP7 will provide an API for a NetworkCost function  Defining a « site ID » - to map CE or SE IP address to some IP address/hostname representing the site.  Deadline : end of May

Pascale PRIMET/ INRIA17 Resource sharing A long term debate in the Internet community: QoS-IP 3 strategies: No garanties => Best Effort –Measure, monitor the perf and adapt –Communication/computing/storage Strict Guaranties => Reservation – throughput, CPU, disk Statistical Guaranties => Prioritisation –Connexions, jobs, users…. Which type of guaranty you really need, how the solutions scales, what is the cost What are the advantages and the drawback of the solutions…

Pascale PRIMET/ INRIA18 Resource sharing Which type of guaranties do you really need? Do the solution scales ? What is the cost ? What are the advantages and the drawback of each solutions? In the Internet, we are working since more then ten years on the subject…. We still have only Best Effort…and adaptive protocol/application like TCP…

Pascale PRIMET/ INRIA19

Pascale PRIMET/ INRIA20

Pascale PRIMET/ INRIA21 Monitoring Tools Monitoring of Round Trip Time and Packet Loss – edg-pinger (integrated in release 1.0) –RIPEncc one way loss and delay (specific links) Monitoring of throughput (release 1.1 or 1.2) –edg-iperf –edg-rtpl DataGRID status visualization –Mapcenter (collaboration with GLOBUS and WP3) –Other tools evaluation (Netsaint....)

Pascale PRIMET/ INRIA22 Forecasting tools WP7 is exploring and improving the NWS (Network Weather Service) in close collaboration with NWS designer (Rich Woski) Requires to work closely with : –WP1 : integrate network forecasts in cost function for scheduling of jobs –WP2 : for replication of files

Pascale PRIMET/ INRIA23 Quality of Service QOS in DataGRID has two Different goals : Guaranty high throughput for all bulk transfers. Work ongoing with DANTE Guaranty prioritization for specific application needs. Work ongoing with WP8, WP9 and WP10 to identify precisely such applications.

Pascale PRIMET/ INRIA24 TCP Throughput Optimization WP7 is working on different solutions : TCP mechanisms optimization –Tests of applicability of new mechanisms Use of QoS solutions –diminution of Packet Loss

Pascale PRIMET/ INRIA25 Information System Close Collaboration with WP3. WP7 is testing the R-GMA An LDAP backend is existing for edg- pinger and other tools.

Pascale PRIMET/ INRIA26 Contacts WP7 manager: Pascale Primet WP7 deputy : Peter Clarke ATF and Integration team : Franck Bonnassieux Collaboration with Dante: Tiziana, Richard Monitoring : Robin Tasker, Cees DeLaat Information System : Peter Clarke QoS : Tiziana Ferrari High Throughput : Richard Hughes Jones Forecasting : Robert Harakaly Security : Dave Kelsey

Pascale PRIMET/ INRIA27 We aggreed The emphasis of WP7 work is now on task T7.2. Propose evaluating Scavenger and assured BW service for TCP transfers with Dante to request access to the Dante infrastructure until July 2002 Franck will receive all bugs for the WP7 tools and send them on to the person responsible To re-start the monitoring for WP7 test sites. Richard and Tiziana offered to run the experimental TCP code

Pascale PRIMET/ INRIA28 Actions list Action Richard: put new Technical Annex on the web. Action Pascale, Peter: Define the CERN EU demonstration and call in experts as required. Action all: Please give any presentations/papers on WP7 to Pascale so that they may be recorded under DataGrid dissemination. Action Pascale& Peter: To submit a paper on monitoring deliverable D7.2 for Computer Communications special journal issue on Grid computing - deadline 1 Mar 02. Action Pascale: Draft an invited paper on WP7 work to be presented at Terena by end of April. Action Richard: Put in link to the ccwp7.in2p3.fr site on the public WP7 site Action Tiziana: check Cisco version and give the Queue monitor command

Pascale PRIMET/ INRIA29 Action list Action Rich discuss possible use of UDPmon with Sylvain Action iGrid2002 Action Tiziana: Ask for a suitable (eg 2-3 month) loan of Juniper 1GE interfaces Action Roberto Dante to check for space and free FPC in the M160 and provide a list of PoPs that we might be able to use. Action Richard Tiziana Pascale: Supply a proposal to Dante 10 days prior to the next Policy Committee, Action Tiziana : Supply Dante with more details of IP Premium users as input to the Sequin workshop. Action All : send update information on the maps to Frank Action Robin, Jules: develop the monitoring workplan for the next meeting including collaboration with WP3.

Pascale PRIMET/ INRIA30 Action List Action ALL: take the current.rpm as delivered and install it at the WP7 test sites. Action Robert : circulate a detailed proposal on a possible protocol for scheduling. Action Tiziana : circulate the WP1 paper Action Pascale: try to organise a cross WP meeting on monitoring / possible use of NetSaint in Paris. Action Franck : bring NetSaint to attention of ATF Action Tiziana : Create a list / outline of the report with sub- editors for the sections Action Rich/Tiziana : Make a roadmap of the 7.2 work – who does what.