UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.

Slides:



Advertisements
Similar presentations
Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Advertisements

WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
MEBT Design Considerations The beam energy in the MEBT is sufficiently low for the space charge forces to have a considerable impact on the beam dynamics.
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.
UKNF OsC RAL – 31 st January 2011 UKNF achievements & plans J. Pozimski.
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
HYBRIS: R. Keller Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
UKNF OsC RAL – 30 st January 2012 UKNF - Status, high lights, plans J. Pozimski.
Steve Geer OsC RAL 21 June, Muon Accelerator Program MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S.  
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
F Project X Overview Dave McGinnis October 12, 2007.
NUFACT August 2014 E. Wildner, CERN 13/03/14Nufact14, Glasgow, E. Wildner 2 Accumulator Ring for the ESS Neutrino Super Beam.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Alexander Aleksandrov Oak Ridge National Laboratory
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
A Path Toward Standardized Low-Energy Emittance Measurements Doug Moehs January 17, 2007.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
MICE CMPB Alain Blondel 1 Highlights on MICE.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Developments of the FETS Ion Source Scott Lawrie.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
February 28, 2011NF Report - Zisman1 Neutrino Factory Design Overview and IDS-NF Status Michael S. Zisman* Center for Beam Physics Accelerator & Fusion.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
UK Neutrino Factory Conceptual Design
Conclusions and thanks
NICA injection complex status
Towards a Common Proton Driver for a Neutrino Factory
Accelerator R&D for Future Neutrino Projects
A. Martynov on behalf of accelerator division.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the Front End Test Stand April 2007.
Accelerator R&D for Future Neutrino Projects
ILC/CLIC e+ generation working group
Summary for the Sources working group
Progress towards Pulsed Multi-MW CERN Proton Drivers
commissioning and measurements
Physics Design on Injector I
A High Intensity Neutrino Oscillation Facility in Europe
(Beam) Commissioning Plan
Current State of the Lattice Studies for the XFEL Injector
Presentation transcript:

UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski

UKNF OsC RAL – 21 & 22 June 2010 Achievements 1 39 Publications, invited talks, PhD's, etc. 2 UKNF plenary meetings 2 IDS plenary meetings 1 EUROnu pleanary meeting and 1 costing workshop dozens of work package meetings and workshops …..and the outcome ? …..quite significant ! UKNF plays a significant role in IDS-NF and EUROnu CERN has revieved his NF activities and …

UKNF OsC RAL – 21 & 22 June 2010 Achievements 2 Proton driver work will within UKNF will focus on the ISIS upgrad path towards a NF driver at Harwell campus. Front end work successfully showed path to mitigate RF issue. While experimental work is ongoing at costing of baseline FE can be started. Good progress on Linac component design, FE-Linac matching and particle tracking. Good progress on Chromaticity corrected lattice and insertions as well as on injection and extraction. Still lattice design not frozen. Focus on decay ring instrumentation with good progress on beam energy monitor. Low energy DR design stalling (manpower) Preparations for E2E finished and first test runs (beam loading, FE – Linac) finished. Ion source work progress well towards design specifications, routine operation at 60 kV, 60 mA, ~0.35  LEBT set up and successfully commissioned. Simulations and experimental results are in very good agreement. RFQ design in all aspects quite advanced. Cooling and mechanical design as well as tuner and low level RF in testing phase. Chopper part manufacture test progress well and within timescale & MEBT and component design advanced. Diagnostics development is good with exception of difficulties on the laser wire. Increased collaboration with RHUL

UKNF OsC RAL – 21 & 22 June 2010 Achievements 3 [Significant progress on solid and fluidized power target] Experimental shock studies in good agreement with simulations Life time of solid targets expected to be sufficiently long [Fluidized power test rig had first promising results] Preliminary wheel design developed Energy deposition simulations and proton beam dump investigations under way. RF butons manufactured and surface composition and roughness monitored before and after surface treatments. Theoretical investigations and simulations of breakdown mechanisms show first promising results but are not conclusive. Investigations on sputtered CS cavities started in collaboration with CERN. Experimental progress is slow due to availability of RF test stand.

UKNF OsC RAL – 21 & 22 June 2010 Milestones 1

UKNF OsC RAL – 21 & 22 June 2010 Milestones 2