Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.

Slides:



Advertisements
Similar presentations
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
HFT Project Overview CD0 Review H.G. Ritter LBNL.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Engineering Division 1 SSD Mechanics E Anderssen, H Matis, J Thomas LBNL S Bouvier, G Gouilloux Subatech.
D. Beavis (BNL) HFT Workshop March 10-11, 2009 BNL HFT Beam Pipe and Safety.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
1 Jim Thomas - LBL The Mechanical Integration Challenge for New Tracking Detectors in STAR Jim Thomas 07/10/2006.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
STAR RHIC AGS users meeting, May 30, Star Inner Tracking upgrade F. Videbaek STAR collaboration for the HFT upgrade group.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Engineering Division 1 Mechanical and Integration HFT CD0 25-February 2008, BNL Eric Anderssen, LBNL.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
1 The STAR Pixel Upgrade H. Wieman Heavy Quark Workshop LBNL 1-Nov-2007.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Engineering Division 1 Phased Cone Proposal Eric Anderssen, LBNL.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
1 HFT Wieman 11/6/ Outline  Development Status uMIMOSTAR pixel detectors uMIMOSA5 Electronic Readout uLadder mechanics uBeam pipe  Interface.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Straw man layout for ATLAS ID for SLHC
Preliminary PXL support models with assembly fixtures.
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Update of MVD services and requests
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Face to Face Meeting – March 2012 Sarah Morgan
WP9 ITS Mechanics and Cooling
C.Clerc ILD session, ALCPG /03/2010
Beam Pipe and Service Support Structure Production Progress
Preliminary PXL support models with assembly fixtures
Presentation transcript:

Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL

Engineering Division Mechanics Integration and Design HFT Pixel Structures, Cooling, and Insertion Mechanics (Service Supports) Integration and Support of IST Structures and Services Global Supports Design, Integration with FGT and SSD (Support Cones) Interface Definition and Control Configuration Control and Documentation Eventually: Production Planning, Cost, and Schedule 2

Engineering Division Production Planning This is obviously too early to present any form of production plan Cost and Schedule estimations do rely on at least some assumptions A crude schedule of what is needed when exists LBNL has the capability to fabricate all of the proposed mechanical structures if required This is not to say we know who will build what or where they will be built Goal is to have a model of the distributed production and assembly planning by CD1 3

Engineering Division Configuration Control Nothing in place at present, but needs are small until layout is optimized fully Have sought to generate ‘layout drawings’ showing sections of STAR’s IFC and associated detectors (J. Scheblien sp?) –Goal is to have controlled envelope drawings of sections of HFT in each configuration (changes by run year) Intent on leveraging ‘e-room’ and ‘Windchill’ PDM software tools in support of this effort –Each allows for versioning, revision control and approval processes for normal and CAD documents with external access by collaborators Establish controlled Requirements Documents Have in place at least skeletons by CD1 4

Engineering Division Interfaces HFT has both Internal and External Interfaces Internal Interfaces are easier to control, and are well managed by the concurrent design team –Will add rigor to this with controlled drawings later—after geometry settles External Interfaces are not wholly in hand HFT will support the Beam Pipe—no solid design for this exists FGT needs to modify current support cone, as does HFT—close coordination is required SSD requires that concurrent modification of end cones by both HFT and FGT consider its support Other Detectors, e.g. FTPC or others as yet unnamed may impinge upon design envelopes Need to establish Configuration Control of Envelopes, thus Interfaces First 5

Engineering Division Global Integrating Structures FGT requires a new West Cone in ’09, but SSD wants to be in during the ’08 run if possible New West Cone (NWC) needs to be available by ’09, but East Cone can still be used NWC + old East Structure must be able to support SSD HFT requires a new East Cone, or at least a modified East Cone Following is a proposal which meets these conditions 6

Engineering Division Cut Apart Current Cones August 2009 Old East Cone and most of Beams to be reused to support New West Cone Old West cone refurbished into New East Cone in Berkeley Cut Carbon Elliptical Beams avoiding Al Insert 7 Send to BerkeleyKeep at Brookhaven

Engineering Division Modified East Cone and Install with New West Cylinder View as Temporary Fix—Should be ACAP (as cheap as possible) –Supports end of New West Cone/FGT –Replicates Old Beam Pipe Interfaces –Includes SSD if required –Only for summer ’09 to ‘10 Wholly Machined/Bonded Solution –Tooling to locate Buck Plate while bonding is required… Buck Plate aimed for Easy Swap of replacement Some Tooling Required… ~1.5m 8

Engineering Division Goal—Swap-in Replacement and Install pixels – summer 2010 Should Be Same Length New East Cone with Cylindrical Shell made from Old West Cone Swap in by matching Bolted Interface to New West Cone… Modification Will Take Up Length… Include SSD interface On Shell 9

Engineering Division ISC fits inside and is supported by the cone ISC supports IST on outside ISC ISC supports pixel and beam pipe inside Inner Support Cylinder (ISC) 10 SSD Supported on outside

Engineering Division HFT Pixel Mechanics Contracted ARES company for analysis on cooling, precision mount design and refinement of ladder stability. –Phone meetings weekly First results – –We will need Sub-Ambient Cooling –Simplified Precision Mount –Sector Stability seems adequate First stage report due in March –Results of Thermo-Structural Stability –Kinematic mount design Move toward construction of prototypes—later verification against models 11

Engineering Division Pixel support structure 2.5 cm radius 8 cm radius Inner layer Outer layer End view ALICE style carbon support beams (green) 12

Engineering Division Sector/ladder design thinned MAPS chips 2 cm by 2 cm, 50 µm thick multilayer aluminum kapton flex circuit cable for signal and power thin carbon composite substrate carbon composite support beam 13

Engineering Division Conceptual mechanical design 14

Engineering Division Pixel placement concept Detector assembly slides in on rails Parallelogram hinges support the two detector halves while sliding Cam and follower controls the opening of the hinges during insertion and extraction Detector support transfers to kinematic dock when positioned at the operating location pixel support hinges cam followers and linear cam slide rails sliding carriage kinematic dock 15

Engineering Division Cam guided insertion operation Open Closed 16

Engineering Division Hinge analysis 17

Engineering Division 18

Engineering Division 19

Engineering Division Two sector patch installation – summer 2010 Requires that all of delivery system, and kinematic mounts are available by then New Beam Pipe, ISC, and Modified East Cone Production Electronics and additional stave assemblies can lag 20