Application form – Section F: Analysis of Environmental Impact – key requirements Adina Relicovschi, EIA Coordinator- JASPERS.

Slides:



Advertisements
Similar presentations
State aid and Structural Funds Carlos Tenreiro DG Competition Brussels 9 April 2003 DG Competition.
Advertisements

Cohesion funds projects in the light of EU Environmental policy & acquis Michal NEKVASIL European Commission, DG Environment Cohesion Policy and Environmental.
1 Flat-rates for indirect costs Ex-ante assessment by DG Employment, Social affairs and Equal Opportunities and DG Regional Policy Myrto Zorbala- DG Regional.
SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes.
The Cohesion Fund: Programming and link to the Structural Funds Annual Meeting of ISPA Partners 2003: From ISPA to Cohesion Fund and Structural Funds Angela.
Health impact assessment explained
Rule-Making Book II EU Administrative Procedures – The ReNEUAL Draft Model Rules 2014 Brussels, May th Herwig C.H. Hofmann University of Luxembourg.
1 Strategic Environmental Assessment and SFs Operational Programmes: An assessment Jonathan Parker DG ENV ENVIRONMENT EUROPEAN COMMISSION Aarhus Workshop.
Interaction between EIA and Articles 6.3 and 6.4 of Habitats Directive Yvonne Scannell Law School, Trinity College, Dublin Arthur Cox, Solicitors, Dublin.
The LIFE Integrated Projects
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Secretariat to the Espoo Convention and its Protocol on SEA
Integrated Projects Spetember 2013 Maja Mikosinska DG Environment European Commission.
The SEA Directive – Implications, Obligations, Strengths and Weaknesses Workshop SEA in Practice Malta, 11 November 2011 Louis Meuleman Unit Cohesion Policy.
Acquis communautaire in Chapter 27 – Environment
3 September UNDERSTANDING THE SEA 20 th May 2013 Presented by: K. Florence.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
UNECE and OSCE joint event, Almaty, May 2012
Implementation of the Horizontal Priority “Sustainable Development” of the National Strategic Reference Framework, by Implementing Activities/sub-activities.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
European Commission Biodiversity and Nature Conservation in the EU today – Business & Biodiversity Alexandra Vakrou, EC, DG Environment IEF European Roundtable.
TEN-T Experts Briefing, March Annual Call Award Criteria.
Regional Policy Major Projects in Cohesion Policy Major Projects Team, Unit G.1 Smart and Sustainable Growth Competence Centre, DG Regional and Urban Policy.
Managing the Natura 2000 network: state of play, challenges and opportunities.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
Regional Policy Veronica Gaffey Evaluation Unit DG Regional Policy International Monitoring Conference Budapest 11 th November 2011 Budapest 26 th September2013.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Environmental Impact Assessment of public and private projects EIA Directive 85/337/EEC as amended by 97/11/EC and 2003/35/EC Recent developments Laura.
European Commission, DG Environment, Nature Unit
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
SEA in the Czech Republic Prague, 24 September 2008.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
Planned activities for 2016 on better implementation and better regulation in the field of environment policy Make It Work Conference 10/11 Dec 2015 DG.
EU Waste legislation PEIP National Workshop – Montenegro Budva, May 2008 Dagmar Kaljarikova European Commission, DG Environment Unit E.3 – Enlargement.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
Commission Guidance on inland waterway development in the context of the EU Birds and Habitats Directives Kerstin Sundseth, Ecosystems LTD.
Commission proposal for a new LIFE Regulation ( ) Presentation to Directors Meeting DK 22 May 2012.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
Environmental Impact Assesment and Strategic Environmental Assesment – tools for biodiversity conservation Emilian Burdusel – Clubul ecologic UNESCO Pro.
Setting conservation objectives for Natura 2000 François Kremer DG ENV.B.3 Expert Group Natura 2000 Management Meeting of 23 November 2011
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
EN Regional Policy EUROPEAN COMMISSION Information and Publicity Structural Funds Information Team Brussels, 30 June 2005 Barbara Piotrowska, DG REGIO.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
1 Legal Frameworks for Public and Stakeholder Engagement by Carl Bruch Asia Regional Workshop on Stakeholder Engagement in International Waters Management.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Regional Policy Requirements and application of ARTICLE 55 Lisbon, 19 April 2013 Michaela Brizova DG REGIO.F1: Operational Efficiency.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Public Participation in Biofuels Voluntary
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Guidance on Natura 2000 and Forests – Scoping Document
Marc Thauront Brussels 30 June 2008.
A new financial instrument
DG Environment, Nature Protection Unit (D3)
Relationship between World Bank and Romanian EA requirements
EC GUIDANCE ON IWT AND NATURA 2000 CHAPTER 3
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
Technical guidance in relation to the non-energy extractive industry
When and how to best consider the provision of the Habitats directive
Overview of Article 6 procedures under the Habitats Directive
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
Analysis of the notification of compensatory measures
Biodiversity, Natura 2000 & Green Infrastructure in the Regional Policy Mathieu Fichter European Commission, DG Regio Team leader "sustainable.
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Presentation transcript:

Application form – Section F: Analysis of Environmental Impact – key requirements Adina Relicovschi, EIA Coordinator- JASPERS

2 Legal Framework Regulation 1083/2006:  Article 9 (5) (principles of assistance): “Operations financed by the Funds shall comply with the provisions of the Treaty and of acts adopted under it”  Article 17 (sustainable development): “The objectives of the Funds shall be pursued in the framework of the sustainable development and the Community promotion of the goal of protecting and improving the environment as set out in Article 6 of the Treaty.”  Article 41 (major projects – decision of the Commission): “The Commission shall appraise the major project, …, in the light of … its consistency with other Community policies.”

3 Legal Framework  Projects co-financed with Structural Funds shall comply with the environmental acquis and policy.  The Managing Authority is responsible for ensuring that projects comply with the applicable Community and national rules for the whole of their implementation period (Article 60(a))  This applies for all projects, without distinction of their value (major or non-major projects)  The Commission checks major projects in the light of the information provided in the application form and its attachments

4 EIA and Project Preparation Key steps:  Pre-feasibility Study;  Feasibility Study;  EIA – starting moment  EIA completion – when all mitigation measures are defined (all details provided) and development consent issue  General design;  Detailed design;  Procurement;  Implementation.

5 EC project appraisal - EIA Documents required by the commission to ensure compliance with environmental acquis – EIA Directive and Natura 2000:  Application form – Section F which it is recommended to be a self-standing document providing coherent information;  Supporting documents:  For the implementation of EIA Directive when an EIA has been undertaken;  For the implementation of Habitat Directive (managing Natura 2000 – Art. 6(3) and 6(4)).

6 EC project appraisal - EIA Supporting documents when an EIA has been undertaken:  Non-technical summary of EIA report;  Information required by art. 9(1) of EIA Directive (content of the decision and any conditions attached thereto, main reason and considerations on which the decision is based, including information about public participation, mitigation measures);  Outline of the public consultation process.

7 EC project appraisal – Natura 2000 Supporting documents: Habitat Directive:  Annex I of the application form – declaration fill in by the competent authority stating that the project is not likely to have significant negative effects on sites included or intended to be included in Natura 2000 network, if applicable;  Summary of the conclusions of the appropriate assessment carried out according to Art. 6(3) of Habitat Directive, if applicable;  Compensatory measures were deemed necessary (art. 6(4)) – procedural aspects, if applicable.

8 “Routing slip” of the application form in the Commission DG EMPLOYMENT DG REGIO DG AGRI DG ENV Water Unit Cohesion Policy and EIA Unit … Nature UnitWaste UnitIPPC Unit …

9 Application form – Section F: Analysis of environmental impact  F1. How does the project contribute to the environmental policy objectives?  F2. Consultation of environmental authorities  F3. Environmental Impact Assessment  F4. Assessments of effects on Natura 2000 sites  F5. Additional environmental integration measures  F6. Cost of measures taken for correcting negative environmental impacts  F7. Consistency with sectoral/regional plans, in case of projects in the areas of water, wastewater and solid waste.

10 F1: How does the project……  Give a separate and distinct answer to each point from a) to c).  Be concise and creative.  Seek the answers in the project description but do not repeat paragraphs from the text already inserted in different previous section. Reformulate them to answer strictly to the questions.  For question a): use the related SOP (each SOP contains references to the sustainable development objectives and how they are reflected within the programme) and/or related EU Directives for implementing the corresponding environmental policy.

11 F1: How does the project…… For question a): e.g.  Climate change and clean energy – Climate action and renewable energy package “20 20 by 2020, Europe's climate change opportunity”**  Sustainable transport  Sustainable production and consumption  Public health threats  Conservation and management of natural resources – “Halting loss of biodiversity by 2010 and beyond” – Commission Communication and Action Plan ***  Social inclusion, demography and migration  Fighting global poverty

12 F1: How does the project……  For question b): use the EIA (or other studies prepared – feasibility study, general design, detailed design, specific environmental studies) to explain briefly if any environmental damage is likely to occur and what preventive actions and mitigation measures the project provides.  For question c): pay attention that the information is directly linked with E1.4.c) ii. “Are the charges proportional to the pollution generated by users?” and E 2.2: Main economic costs and benefits identified in the cost-benefit analysis (Internalisation of negative and positive environmental externalities).

13 F2: Consultation of environmental authorities Have the environmental authorities likely to be concerned by the project been consulted by reason of their specific responsibilities?  Give names and addresses and explain their responsibilities  Refer not only to the EIA competent authorities, but also to all other “statutory consultees” with responsibilities in environmental sector (if case)  Good to mention if outside the EIA, other authorities have made any comments or raised any issues

14 F3: Environmental Impact Assessment F.3.1. Development consent  The answer should be YES only if the development consent was issued, so be careful to the distinction between the development consent (the decision of the competent authority which entitles the developer to proceed with the project) and the EIA decision/approval  Coordination/correlation between F 3.1 and D 2.2  In the application form you have to refer to development consent:  Information should be provided on issuance date – or expected, name of the issuing authority  A project can be submitted even if the development consent is not issued yet, but only after the EIA decision/approval is issued

15 F3: Environmental Impact Assessment F.3.2 Application of EU EIA Directive  Project falls under Annex I, Annex II or neither of the two  When covered by Annex I or Annex II and EIA has been undertaken (based on a screening decision requiring an EIA to be performed), include the following documents:  a) the information referred to in Article 9 (1) of the Directive (check where is the information available looking to entire approval process from the EIA approval/decision to development consent);  E.g. “The information required by the Article 9(1) of the EIA Directive is comprised in the EIA approval/decision and ….. (planning decision, construction permit, etc). These documents where made available to the public (when, where, how, for how long, comments received or not, etc.). A copy of these documents is attached in Annex……

16 F3: Environmental Impact Assessment F.3.2 Application of EU EIA Directive  When covered by Annex I or Annex II and EIA has been undertaken (based on a screening decision requiring an EIA to be performed), include the following documents:  b) the non-technical summary of the Environmental Impact Study carried out for the project; Do not forget: EIA Report is not part of the Application and the NTS should speak for it. NTS should have the same outline as the EIA Report but should be concise and not very long. Since the NTS is developed especially for public, ask the consultants to pay attention to the following: use a non-technical language; if the use of, insert some explanations (in footnotes for instance) for terms not familiar to the large public which can not be avoided; anyway insert a list of acronyms.

17 F3: Environmental Impact Assessment F.3.2 Application of EU EIA Directive  When covered by Annex I or Annex II and EIA has been undertaken (based on a screening decision requiring an EIA to be performed), include the following documents:  c) information on consultations with environmental authorities, the public concerned and, if applicable, with other Member States.  Insert the following or similar text in order to refer to the timetable of the EIA procedure: “Consultation with environmental authorities and public was held during the EIA procedure, in different stages, as required by the EIA legislation. An overview of different actions taken to observe the legal requirements, including reference to the electronic copies of the corresponding proving document or events, is comprised in the table attached to the end of this section/annex.”

18 F3: Environmental Impact Assessment F.3.2 Application of EU EIA Directive  When covered by Annex I or Annex II and EIA has been undertaken (based on a screening decision requiring an EIA to be performed), include the following documents:  c) information on consultations with environmental authorities, the public concerned and, if applicable, with other Member States.  Be aware that consultations with other Member States are developed only for projects with potential transboundary impacts. In such a case, usually the Ministry of Environment and/or Ministry of Foreign Affair assume the full responsibility for all actions involved.  If is not the case, the Applicant might insert the text: ”The project was not assessed as likely to have transboundary impact.”

19 F3: Environmental Impact Assessment F.3.2 Application of EU EIA Directive  When covered by Annex II of the Directive, has an Environmental Impact Assessment been carried out for this project?  No - explain the reasons and give the thresholds, criteria or case by case examination carried out to reach this conclusion  Criteria set out in Annex III of the EIA Directive  !!! Although an EIA may not be needed, the screening decision has to be duly justified in the light of the screening of potential impacts of the project on environment using the criteria listed in Annex III.  Thresholds: are to help in screening, not to replace it – screening determination still needed;

20 F3: Environmental Impact Assessment F.3.3 Application of EU SEA Directive  Does the project result from a plan or programme falling within the scope of the SEA Directive?  If no, provide an explanation. It is rather unlikely for a project asking financing from ERDF/CF to not result from the applicable SOP but if the case is so, an explanation should be given as required.  Yes: the projects result usually from SOP. An SEA was carried out for each SOP and the Environmental Report was published. The link to the electronic copy of the NTS of the Environmental Report has to be provided.  Transport projects: national plans on the development of transport infrastructure, urban transport development plans;

21 F4: Assessment of effects on Natura 2000 sites Is the project likely to have significant negative effects on sites included or intended to be included in the Natura 2000 network?  If Yes, provide:  Summary of the conclusions of the appropriate assessment carried out according to Article 6(3) of the Habitats Directive  If carried out, the appropriate assessment should be a separate document attached to, or a separate chapter included in, the EIA Report (see the below explanations)  The Applicant is required to identify the conclusions of this document and to insert them in a text box in the Application form.

22 F4: Assessment of effects on Natura 2000 sites Is the project likely to have significant negative effects on sites included or intended to be included in the Natura 2000 network?  If Yes, provide:  If compensatory measures were deemed necessary (article 6(4)), provide a copy of the notification sent to DG Environment  Ask the competent environmental authority to provide a copy of the Information notified to the Commission (see the explanations provided below) and/or the Commission approval if the site host priority species or habitats

23 F4: Assessment of effects on Natura 2000 sites Is the project likely to have significant negative effects on sites included in the Natura 2000 network?  If No: attach a completed Annex I declaration filled in by the relevant authority.  The Declaration should be based on the standard format provided in the Application form. The Declaration itself should cover the following issues for each Natura 2000 site:  Name, location (distance to the project boundaries should be clearly indicated on the map);  Site’s conservation objectives (for which the site was included in the Natura 2000 network);  Mention that the appropriate assessment screening was done;  Conclusions of the screening i.e. why the project is not likely to have significant negative effects on sites included or intended to be included in the Natura 2000 network, either individually or in combination with other projects.  The map attached to the Declaration should be stamped by the competent environmental protection authority.

24 F.5. Additional environmental integration measures Examples:  Environmental management systems (if such a system was provided by the Project Feasibility study or EIA Report),  Environmental audit: Integrated environmental permit for IPPC installations (the Application for issuing the permit would contain information about environmental audits, site reports),  Specific environmental monitoring measures (i.e. for landfills, for transport projects – noise and air pollution)  Mitigation measures to reduce negative effects (i.e. noise protecting walls – transport projects, indoor installations – to reduce noise or odour problems)  Measures for raising the environmental awareness of public or employees  Special landscape improvement measures

25 F.6. Cost of measures taken for correcting negative environmental impacts Estimate (% of total cost) and explain the proportion of cost of measures taken to reduce and/or compensate negative environmental impacts (link between F 5 and F 6)  If measures were explained before in the application, no need to go into details, but to make reference to them and quantify costs Examples:  Noise reduction walls for transport projects  Filters for reducing odour emissions (for WWTPs)  Protection & planting of trees

26 F.7. In case of projects in the areas of water, wastewater and solid waste Explain consistency with sectoral/integrated plans associated with the implementation of Community policy or legislation  Water: Accession Treaty deadlines and any relevant national plan & River basin management plans (depending on their readiness)  Wastewater: Accession Treaty & Implementation Programme prepared according to Article 17 of the Urban Wastewater Treatment Directive  Solid waste: Accession Treaty & any relevant deadlines established by Directives (i.e. Landfill Directive) & National, Regional & county waste management plans

27 Conclusions  The application form has to cover all potential issues of interest or concern  The EIA procedure has to be well done and well documented (both procedure and substance), with relevant documents attached  Specific attention to Natura 2000 assessment and declaration

28 Thank you