© Chevron 2013 D EEP S TAR ® A Global Deepwater R&D Consortium Task Report Update: DeepStar Study AUV Interface Standards for Deepwater Fields Reporting.

Slides:



Advertisements
Similar presentations
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Advertisements

Roger Warren President, PGA of America. Executive Summary PGA PerformanceTrak produced significant growth in industry rounds played reporting Metrics.
The Engine Behind Petroleum eBusiness.
Don Wells Hess Corporation
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
Project field communication services llc Remote Site Industrial Communications Systems - Delivered. Capabilities Overview Project.
Human Resources Committee Presentation Kigali, Rwanda 28 th May
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
PRESENTED BY: WARREN PONCSAK, EXECUTIVE DIRECTOR ROZ KELSEY, PRINCIPAL PROJECT CONSULTANT.
How can projects be controlled?
Gulf of Mexico Challenges with Contractor Verification - Skills and Knowledge.
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting January 11, 2008.
UMT and Microsoft Presenting Tips and Tricks Basics What’s new in Microsoft Project 2010 Brian Feder, MBA, PMP Senior Vice President UMT Consulting Group.
API Subcommittee 17 Industry Standards for Subsea Equipment
Electronic Permitting Initiative Update Alan Doniger, Energistics CTO 2 nd Annual Standards Summit & Reception 6 November 2007 Houston, Texas.
DeepStar D EEP S TAR ® A Global Deepwater R&D Consortium AUV Interface Standards for Deepwater Fields CTR11304 John Jacobson Lockheed Martin Corporation.
The LOGIIC Consortium Zachary Tudor, CISSP, CISM, CCP Program Director SRI International.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
1 Overview Charlie Williams – Shell API Summer Standardization Conference 28 June
May Agenda  PeopleSoft History at Emory  Program Governance  Why Upgrade Now?  Program Guiding Principles  High-Level Roadmap  What Does This.
Subsea Industry Standardization Landscape
QAD's Customer Engagement Dan Blake Consultancy Development Director, QAD QAD Explore 2012.
WBCSD/WRI Side Event ; 12 June, 2003—Bonn, Germany Industry Partnerships - From Generic Standards to Sector Specific Tools The Aluminium Sector Story Jerry.
Create a New Company Division In One Quarter How to.
© 2013 Chevron D EEP S TAR ® Global Deepwater Technology Development Phase XII CTR Project Proposal Time-line, Guidance and Instruction for completing.
Liaison activities with other organisations (GHG/07/46) EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Roles and Responsibilities
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
1 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 3 The Incorporation of the Utilities Input into the Design.
1 18 March 2010AGNA meeting EASAC update Yves Morier.
Information Technology Branch Corporate Services Department IT Planning Integration Project Presented January, 2004.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
Life cycle services for automation products
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Industry Response - Deepwater Horizon
Atlantic Innovation Fund Round VIII February 5, 2008.
Section 4.9 Review Report Request for MAC Approval December 1, 2015.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Program Assessment Technical Assistance Meetings December 2009.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
API 17TR8: High-pressure High-temperature (HPHT) Design Guidelines
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
1 Texas Data Transport & MarkeTrak Systems (TDTMS) Update to RMS February 2, 2016 Jim Lee (AEP) – Chair Monica Jones (NRG) – Vice Chair.
DEVELOPMENT OF A WHITE PAPER ON CORRECTIONAL SERVICES Ministry of Correctional Services.
Sectoral Operational Programme “INCREASE OF ECONOMIC COMPETITIVENESS” October 2005 MINISTRY OF ECONOMY AND TRADE.
African Centre for Statistics United Nations Economic Commission for Africa Implementation of the Conclusions and Recommendations of the CSC and AGNA Biruk.
19th January 2012 Don Wells (Hess)
PlusAlpha Risk Management Solutions, LLC Barrier and Project Interface Management The Keys.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
Principal Investigator ESTCP Selection Meeting
Rapid Launch Workshop ©CC BY-SA.
Principal Investigator ESTCP Selection Meeting
Identify the Risk of Not Doing BA
The IAASB’s Future Strategy
API 17Q – Subsea Equipment Qualification
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Well Identification Industry Meeting
Senior Engineer, Intelligent Operations
AM Business Model Wargame Working Team Documentation
AM Business Model Wargame Working Team Documentation
Building Efficiency Accelerator:
Task Group Status January 2013
Presentation transcript:

© Chevron 2013 D EEP S TAR ® A Global Deepwater R&D Consortium Task Report Update: DeepStar Study AUV Interface Standards for Deepwater Fields Reporting out: Art Schroeder; Project Manager; DeepStar John Jacobson; PI; Lockheed Martin Corporation January 15, 2014 API Subcommittee 17 Meeting

© Chevron 2013 Agenda 1.Who is Funding this Work: DeepStar Organization 2.Project Motivation and Objective 3.Vision of Success 4.Path to Develop Recommended Practice for AUV Interfaces 5.Highlights from Draft RP 6.Key Results and Next Steps 2

© Chevron 2013 DeepStar - 20 Years of Deepwater R&D Excellence DeepStar is an operator funded Research & Development collaboration between oil companies, vendors, regulators and academic/research institutes started in 1991  Vision –Premier global forum to define deepwater technology needs. –Execute development and adoption of deepwater technology projects.  Value – Leverage financial and technical resources to:  Deliver technology needs  Build deepwater technical competency  Strategy –Technology development aligned with business needs –Transfer and apply technology to deepwater assets –Gain acceptance of deepwater technologies by industry, standards organizations and regulators 3

© 2013 Chevron DeepStar Members Phase XI (January 2012 – December 2013) 2H Offshore Inc.Doris EngineeringKvaerner Field DevelopmentSaipem S.A Aker Subsea Inc.EDG, IncLighthouse R&D EnterprisesSBM Atlantia, Inc. Alan C. McClure AssociatesEmas-AMC Inc.Lockheed Martin, CorpSchlumberger Alcoa Inc.Exmar Offshore CompanyMagiQ TechnologiesScoperta, Inc. Altair Engineering IncFloatecMagma Global LimitedSeabox American Bureau of ShippingFluor Enterprises, Inc.Marintek USA, IncSeaTrepid International, LLC Amog Consulting inc.FMC TechnologiesMMI EngineeringSiemens Energy Baker Petrolite CorporationFrank's International, Inc.Moog, IncSilixa Battelle Memorial InstituteGE Oil & Gas (Vetco Gray Inc.)Multiphase Solutions Kenny, IncSonomatic, Inc. BechtelGenesisNalco Energy ServicesSouthwest Research Institute Blade Energy PartnersGL Noble DentonNational Oilwell VarcoStress Engineering BMT Reliability ConsultantsGranherne, IncNautilus International, LLCSubsea 7 Bornemann PumpsGVA ConsultantsOceaneering International, Inc.Texas A&M University CameronHalliburtonOil State Industries IncTrendsetter Engineering, Inc. Champion Technologies, Inc.Harris, CorpPipeline Research Council Int'l Inc.Universal Pegasus International CSI Technologies, LLCHytorc of Texas, Inc.Pulse Structural Monitoring, IncUniversity of Houston Daewoo ShipbuildingIntecSeaQinetiQ North AmericaWater Standard Management & Marine Engineering Co., Ltd InterMoor Inc.READ ASAWeatherford DNVKnowledge ReservoirSAAB North America, IncWood Group Kenny 4 Phase XI Contributors Phase XI Participants

© Chevron 2013 Project Motivation  The development of industry standards for AUV interfaces, similar to the API standards for ROVs, will: –Lead to compatible system designs by AUV vendors and field hardware manufacturers, and –Enable safer, more efficient and cost effective operations of subsea fields. 5 Future capabilities and benefits of AUVs will be substantially enhanced through the use of standardized interfaces with subsea facilities

© Chevron 2013 Project Objectives  Project Objective: –Identify subsea interfaces which should be standardized for AUVs –Develop recommendations and preliminary drafts of interface standards –Submit to API SC17 6

© Chevron 2013 Preliminary List of AUV Interfaces for Standardization 7 Standardization Must Consider Both Greenfield and Brownfield Applications Docking Power / Battery Charging Communications / Data Transfer Mechanical Intervention

© Chevron 2013 Vision of Success  API Adoption of DeepStar Task Report as Input to a Recommended Practice.  Follow Outline for API RP 17H: –Scope –Normative References, Terms and Abbreviations –AUV Interface Philosophy –Design Performance –Design Considerations –AUV Interfaces and Subsea Systems –Operational Considerations –Indicator Systems –Materials –Documentation –AUV Interfaces –Informative Annexes  Deliver Draft RP Document to API SC17 in MS Word Format 8

© Chevron 2013 Path to Develop Formal Recommendations to API SC17 9 Telephone Surveys Workshop Post- Workshop Assessment Apply Industry Expertise Draft RP 2 Month Comment Review Cycle Completed. Draft RP under Final Review with DeepStar Management 2 Month Comment Review Cycle Completed. Draft RP under Final Review with DeepStar Management Formal Submission to API Planned for 1Q2014

© Chevron 2013 Examples of Type 1 and Type 2 Docking Arrangements Using Docking Base and Docking Structure 10 Vertical Docking Configuration Horizontal Docking Configuration

© Chevron 2013 Context Depiction AUV Docking to Dedicated In-Field Fixture 11

© Chevron 2013 Context Depiction AUV Docking to Field-independent Cabled Node 12

© Chevron 2013 Context Depiction AUV Docking Integral within Subsea Facility 13

© Chevron 2013 Key Results and Next Steps  Summary of Results: –Draft RP, formatted as a “Stand Alone” document following format of API RP 17H –Key Sections include: Sect. 4.0: AUV Interface Philosophy and Functional Requirements Sect. 7.0: AUV Navigational Requirements for Interfaces and Subsea Systems Sect. 12.0: AUV Interfaces  Next Steps: –Deliver DeepStar report to API upon completion of DeepStar reveiws 14

© Chevron 2013 Contact: John Jacobson Lockheed Martin Corporation Contact: Art Schroeder DeepStar Project Manager Questions? Contact: Greg Kusinski DeepStar Director