In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.

Slides:



Advertisements
Similar presentations
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Delivering SCIENCE AND TECHNOLOGY Through the National Science and Technology Consortium.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003 URS Corporation January 22, 2003.
1 NODOS/Sites Reservoir: A Local Perspective Glenn Colusa Irrigation District July 2009.
1 Water Planning & Stewardship Committee Item #6b Summary Subject: Review of Long-Term Delta Actions & Water Supply Planning Implications Purpose:To open.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Uncertainty and the Management of the Cedar River Presented by Bruce Bachen, Rand Little, and George Schneider Water Management Section Seattle Public.
What’s next in California's flood future? Finding answers: California Water Management Investment Strategy FEMA Region IX - CHARG Stakeholder Meeting July.
2 1)Familiarize State agency staff with Water Plan Update 2013 information, tools and resources 2)Identify opportunities for State agencies to derive.
North-of-the-Delta Offstream Storage Investigation Planning and Timeline “Planning is bringing the future into the present so you can do something about.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Use of Regional Agricultural Economic Models for Policy Analysis Stephen Hatchett CH2MHILL.
Strengths 1.Describes clearly the intrinsic value of the Delta and its economy and documents the many public-good services provided by the Delta 2.Provides.
Hood River County Monthly Meeting Presentation Toni E Turner, M.S., P.E., Project Manager and Technical Lead.
CALFED Finance Planning. Need for Finance Planning Status quo approach to rely so heavily on State bond funds unlikely in the future Existing funding.
Fresno County Water Crisis and Opportunities. The Delta And Our Water Supply In August 2007 the Federal Court ruled that the Delta Smelt was in danger.
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
Proposal for Improved CVP/SWP Integrated Operations.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Draft Recommendations of the San Joaquin Water Quality Management Group Plan for Achieving Salinity/Boron and DO Objectives Plan for Achieving Salinity/Boron.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
In-Delta Storage Program Engineering Investigations Control Structures Stakeholders Committee Meeting January 22, 2003 Jeremy Arrich.
In-Delta Fish Screen Facilities Delta Wetlands Proposed Facilities and Basis for Re-Engineered Facilities.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Overview.
Central Valley Project Cost Allocation Study -- Irrigation and Municipal & Industrial (M&I) Benefits Public Meeting August 9, 2013.
1 Comparing Futures for the Sacramento-San Joaquin Delta Engineers: Jay Lund, UC Davis* William Fleenor, UC Davis Economists: Ellen Hanak, PPIC* Richard.
1 Status of AC Input from Last Meeting. 2 Overview  Input received on Strategic Planning Elements (Mission, Vision, Guiding Principles) & the 7 Key Content.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Alabama Water Resources Association Geological Survey of Alabama
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
Project Status South Delta Improvements Program Project Status November 2003.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Slide 1 Drinking Water Subcommittee Greg Gartrell, Chair CALFED Bay-Delta Public Advisory Committee SWRCB Periodic Review Presentation January 2005.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
California Water Plan Old and New Steve Macaulay, Executive Director.
Chino Basin Watermaster Large-Scale Storage and Recovery Program Master Plan Scope of Work July 23, 2003.
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
In-Delta Storage Program Reservoir Operations Stakeholders Committee Meeting January 22, 2003 Pal Sandhu.
Contacts Advisory Committee on Water Information Anne Castle, ACWI Chair Asst. Secretary Water and Science U.S. Department of the Interior William H.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
In-Delta Storage Program Environmental Evaluations Stakeholders Committee Meeting January 22, 2003 Leslie Pierce.
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Water Infrastructure Improvements for the Nation (WIIN)
Water Resources Plan 2040 Update
In-Delta Storage Program
FISCAL YEAR Discussion on Mid-Year Budget Adjustment:
Brackish Water Desalination Project
In-Delta Storage Program
Agricultural Land & Avian Foraging Habitat Mitigation Fee
CBEWP Chino Basin Conjunctive Use Environmental
California Water Commission
In-Delta Storage Program Engineering Investigations Control Structures Stakeholders Committee Meeting January 22, 2003 Jeremy Arrich.
In-Delta Fish Screen Facilities
Chino Basin Watermaster
Presentation transcript:

In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed Work Plan for FY 2003 Proposed Next Steps (Staff Recommendation)Proposed Next Steps (Staff Recommendation) Questions for BDPAC Water Supply Subcommittee to ConsiderQuestions for BDPAC Water Supply Subcommittee to Consider OutlineOutline

In-Delta Storage

In-Delta Storage Delta Wetlands Bacon and Webb Tract (Storage) Holland and Bouldin (Habitat)

In-Delta Storage Benefits CVP/SWP Operational flexibility and reliability – Increased reliability of South of Delta exports – Additional system storage for short term operational challenges Improve flow releases and export timing to benefit Delta fisheries and improve water quality for fish in the Delta Storage space for EWA Storage and water marketing for sale, exchange, lease or transfer of water from one user to another Benefits CVP/SWP Operational flexibility and reliability – Increased reliability of South of Delta exports – Additional system storage for short term operational challenges Improve flow releases and export timing to benefit Delta fisheries and improve water quality for fish in the Delta Storage space for EWA Storage and water marketing for sale, exchange, lease or transfer of water from one user to another

Costs Range of Project cost estimates developed based on the following uncertainties: –Variations in engineering design reflecting risk and level of protection –Environmental mitigation –Cost variations based on site conditions and construction methods –Changes in hydrology due to climate change Costs Range of Project cost estimates developed based on the following uncertainties: –Variations in engineering design reflecting risk and level of protection –Environmental mitigation –Cost variations based on site conditions and construction methods –Changes in hydrology due to climate change In-Delta Storage

Costs (Cont.) In-Delta Storage Cost Range Capital Cost ($ million) Annual O&M* ($ million) Unit Cost ($/AF) Lower Range Upper Range 1, * Climate change may result in 10 to 15% increase in overall cost spread over 50 year life of the project and will be reflected as additional annual O&M cost.

Issues Engineering design and cost issues –Accepted risk and level of protection –Slough/river side slope stability –Borrow areas and construction methods – Fish screens and appurtenant structures – Unit costs Issues Engineering design and cost issues –Accepted risk and level of protection –Slough/river side slope stability –Borrow areas and construction methods – Fish screens and appurtenant structures – Unit costs In-Delta Storage

Issues (Cont.) Costs are dependent on Design Criteria Issues (Cont.) Costs are dependent on Design Criteria In-Delta Storage

Issues (Cont.) Operational flexibility and reliability –Impact of fisheries biological opinion Delta Smelt Criteria –Accurate estimate of water supply benefits considering WQMP, CVPIA and EWA Water Quality Evaluations –DOC and other constituents concentrations at urban intakes –Re-operations for WQMP Issues (Cont.) Operational flexibility and reliability –Impact of fisheries biological opinion Delta Smelt Criteria –Accurate estimate of water supply benefits considering WQMP, CVPIA and EWA Water Quality Evaluations –DOC and other constituents concentrations at urban intakes –Re-operations for WQMP In-Delta Storage

Issues (Cont.) Environmental mitigation – Agricultural land use issues – Environmental Mitigation requirements Issues (Cont.) Environmental mitigation – Agricultural land use issues – Environmental Mitigation requirements In-Delta Storage Economic Feasibility – Realization of benefits in monetary terms – Economic value of the project

Tasks for FY 2003 Objective is to provide necessary technical information to make a decision on initiating negotiations with Delta Wetlands by July 2003 Tasks for FY 2003 Objective is to provide necessary technical information to make a decision on initiating negotiations with Delta Wetlands by July 2003 In-Delta Storage

Tasks for FY 2003 Project Operations –Develop daily Base and In-Delta Storage CALSIM II Model including CVPIA and EWA –Discuss fisheries Final Operations Criteria to improve operational flexibility and create fisheries and ecosystem benefits –Refine year around reservoir operations considering water quality rules, fisheries benefits/constraints, and additional supply benefits –Simulate project operations under alternative operational priorities –Perform operations with other proposed storage and conveyance projects Tasks for FY 2003 Project Operations –Develop daily Base and In-Delta Storage CALSIM II Model including CVPIA and EWA –Discuss fisheries Final Operations Criteria to improve operational flexibility and create fisheries and ecosystem benefits –Refine year around reservoir operations considering water quality rules, fisheries benefits/constraints, and additional supply benefits –Simulate project operations under alternative operational priorities –Perform operations with other proposed storage and conveyance projects In-Delta Storage

Water Quality Evaluations –Develop integrated experimental and modeling methodology to predict organic carbon including biological productivity and ecological processes –Undertake additional modeling studies to evaluate project operations to comply with water quality requirements. In-Delta Storage Tasks for FY 2003 (Cont.)

Engineering Investigations –Define and conduct field surveys, geotechnical and hydrological investigations in order to refine embankment and structure designs –Perform Risk Analysis and make recommendations for integration of the physical design with an accepted level of protection –Recommend optimum embankment design through detailed slope stability, seismic, seepage and settlement analyses –Conduct a detailed borrow investigation in the interior of the islands, to locate suitable borrow sites –Prepare hydraulic and structural design for fish screens, inlets, outlets, pumping units and appurtenant structures –Evaluate construction methods –Revise and finalize cost estimates. Engineering Investigations –Define and conduct field surveys, geotechnical and hydrological investigations in order to refine embankment and structure designs –Perform Risk Analysis and make recommendations for integration of the physical design with an accepted level of protection –Recommend optimum embankment design through detailed slope stability, seismic, seepage and settlement analyses –Conduct a detailed borrow investigation in the interior of the islands, to locate suitable borrow sites –Prepare hydraulic and structural design for fish screens, inlets, outlets, pumping units and appurtenant structures –Evaluate construction methods –Revise and finalize cost estimates. In-Delta Storage Tasks for FY 2003 (Cont.)

Environmental Evaluations –Perform resource surveys and studies to support the subsequent EIR/EIS Process –Discuss fisheries Final Operations Criteria to improve operational flexibility and create fisheries and ecosystem benefits –Provide liaison with the Fish Facilities Review Team and engineering design work to finalize fish screens designs –Evaluate water supply and water quality benefits for Delta fisheries, wildlife and ecosystem. Environmental Evaluations –Perform resource surveys and studies to support the subsequent EIR/EIS Process –Discuss fisheries Final Operations Criteria to improve operational flexibility and create fisheries and ecosystem benefits –Provide liaison with the Fish Facilities Review Team and engineering design work to finalize fish screens designs –Evaluate water supply and water quality benefits for Delta fisheries, wildlife and ecosystem. In-Delta Storage Tasks for FY 2003 (Cont.)

Economic Analysis –Perform benefits analysis by using latest available economic models and project yield –Conduct negotiations with potential beneficiaries to determine the quantity and cost of delivered water and develop cost sharing methodologies –Determine Economic Value of the Project by conducting Land and Project Appraisals –Integrate appraisal into economic analysis, review available financing options and recommend potential strategies for project financing –Re-evaluate benefit-cost analysis based on alternative operational priorities Tasks for FY 2003 (Cont.) In-Delta Storage

Proposed Next Steps (Staff Recommendation) Complete CALFED Science Panel Review Summarize public comments Stakeholders Presentation (Public Meeting) Finalize Work Plan FY 2003 If State or federal funding available, implement Work Plan. Proposed Next Steps (Staff Recommendation) Complete CALFED Science Panel Review Summarize public comments Stakeholders Presentation (Public Meeting) Finalize Work Plan FY 2003 If State or federal funding available, implement Work Plan. In-Delta Storage

Questions for BDPAC Water Supply Subcommittee to Consider Are the following adequate and responsive to stakeholders concerns? –Completed technical work, stakeholders outreach and independent review process –List of outstanding issues –Proposed Draft Work Plan FY 2003 If Funding Available, should CALFED Agencies implement the Draft Work Plan? Questions for BDPAC Water Supply Subcommittee to Consider Are the following adequate and responsive to stakeholders concerns? –Completed technical work, stakeholders outreach and independent review process –List of outstanding issues –Proposed Draft Work Plan FY 2003 If Funding Available, should CALFED Agencies implement the Draft Work Plan? In-Delta Storage