Integrity Management Inspection Process Don Moore, OPS Central Region.

Slides:



Advertisements
Similar presentations
Ways to Improve the Hazard Management Process
Advertisements

MONITORING OF SUBGRANTEES
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Module 13 Oversight Assessment of Auditor Authentication Bodies
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
Don Wells Hess Corporation
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
Implementing SMS in Civil Aviation: the Canadian Perspective.
Overview of Key Rule Features
Overview Lesson 10,11 - Software Quality Assurance
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Frequently Asked Questions (FAQ) prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9.
Security Assessments FITSP-M Module 5. Security control assessments are not about checklists, simple pass-fail results, or generating paperwork to pass.
Conducting the IT Audit
Federal Aviation Administration The United States Government’s USOAP Experience By: Michele Cappelle, National USOAP Coordinator Date: December 15, 2007.
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Staff Structure Support HCCA Special Interest Group New Regulations: A Strategy for Implementation Sharon Schmid Vice President, Compliance and.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Security Assessments FITSP-A Module 5
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Software Quality Assurance Activities
NIST Special Publication Revision 1
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Appendix E – Checklist for Review of Performance Audits Presented by: Ashton Coleman Department of Defense Office of the Inspector General August 16, 2012.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
Proposed Regulations for Foreign Supplier Verification Programs (FSVPs)
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Office of Pipeline Safety Qualifications of Individuals: Protocol Review Integrity Management Workshop July 23-24, 2002.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
An Industry Response to the Expected Control Room Management Rule Western Regional Gas Conference Daron Moore – El Paso Pipeline Group August 25, 2009.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
SOFTWARE PROJECT MANAGEMENT
Analysis & Presentation of Integrity Management Audit Results Western Regional Gas Conference August 21, 2007 Gary R. White.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
1 Tempus Tempus Workshop Sarajevo 7 June 2006 « Good practice in Preparing an Application » Anne Collette European Training Foundation Tempus Department.
Lessons Learned from Integrity Management Inspections Byron Coy – OPS Eastern Region Derick Turner – OPS Southern Region May 17, 2005.
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
Development of IM Inspection Process Workshop on the Integrity Management Rule for Large Liquid Pipelines Bruce Hansen August 7, 2001.
Update: AUL Guidance Revisions Summary of Comments June 23, 2011 Peggy Shaw Workgroup Chair.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Enforcement of Integrity Management Rule Workshop on the Integrity Management Rule for Large Liquid Pipelines Chris Hoidal, Director OPS Western Region.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Enforcement 101 Rachael Ferrin Associate Process Analyst.
Sample Fit-Gap Kick-off
Implementing SMS in Civil Aviation: the Canadian Perspective
Update on the Latest Developments in Government Auditing Standards
Industry Guidance on Part 21 Evaluation and Reporting
CIS12-3 IT Project Management
Update on the Developments in Government Auditing Standards
System Safety Regulation
System Safety Regulation
USOAP Continuous Monitoring Approach (CMA) Workshop
Presentation transcript:

Integrity Management Inspection Process Don Moore, OPS Central Region

Office of Pipeline Safety What Approach Did OPS Take? Communicate with Industry/Stakeholders Develop Detailed Inspection Protocols Training of Inspectors Consistently Apply Inspection Process Development of Enforcement Approach

Office of Pipeline Safety Implementing IM Website – Rule and Federal Register Notices – FAQs (linked to sections of the rule) – Inspection Protocols – Fact Sheets and Other References – Public Meeting Presentation Material – Online Notification Submittal and Status – Opportunity to Submit Comments to OPS

Office of Pipeline Safety Frequently Asked Questions Clarify rule requirements – Carefully Reviewed to Ensure Consistency with Intent of Rule Provide information on inspection program Communicate OPS Expectations Opportunity for Public Input Can be sorted to identify recent updates

Office of Pipeline Safety Public Workshops August Houston – Rule Requirements – NPMS and the Identification of HCAs – API-1160 – Segment Identification Expectations July 2002 – Houston – Segment Identification Inspection Results – Comprehensive Protocol Review – FAQs – Enforcement Approach

Office of Pipeline Safety Inspection Protocol Development Experience from Risk Management and SII Programs Insights from Part 195 Inspection Experience, Conducting System Type Inspections, and Accident Investigations Information Obtained from “Completeness Check” Portion of Segment Identification Inspections

Office of Pipeline Safety Inspection Protocol Development, continued Input from IM Inspector Working Meetings Guidance from Subject Matter Experts Protocol Effectiveness Reviews at Periodic Lessons Learned Meetings

Office of Pipeline Safety Protocol Content Organized by Program Elements in 452 (f), Protocols contain questions to: – Evaluate IM Process and Methods – Review Process Implementation – Evaluate Operator Understanding of Integrity Issues and Actions Taken to Protect HCAs Guidance for each question identifies: – Prescriptive requirements – Characteristics of an effective program

Office of Pipeline Safety Inspector Training Classroom Training: Specific courses on the following specialized subjects: – Rule Requirements – Inspection Protocols – Management Systems and Risk Analysis – Pipeline Materials and Defects – Welding Technology – In-Line Inspection – Corrosion Control – SCADA and Leak Detection Mentoring program for new inspectors

Office of Pipeline Safety Inspection Process Pre-Inspection Information Gathering Inspection Duration 1 – 2 weeks, depending on: – Size and complexity of pipeline system(s) – HCA exposure – Number of assessments completed – Complexity of program processes and completeness of documentation Operator IM Program Presentation

Office of Pipeline Safety Inspection Process, continued Protocol Guided Inspection – Protocols support an investigative, analytical review – are not a checklist – Process and Documentation Operator understanding of process – Implementation and Records Operator understanding of significant integrity threats and how they are being managed Exit interview Documentation – Summary Report

Office of Pipeline Safety Inspection Participants Government – Interstate pipeline OPS (multi-Region teams for large operators) Interstate agents, if applicable – Intrastate pipeline OPS or State program

Office of Pipeline Safety Inspection Participants Operator – IM Program Manager – Individuals Involved in IM Program: Operations Maintenance Risk Assessment Assessment Results Evaluation Corrosion Control Leak Detection – Outside consultants, if used

Office of Pipeline Safety Documentation Reviewed During Inspection IM Program Description, latest revision Baseline Assessment Plan O&M Manual Procedures, Guidelines, and Technical Reports referenced by the IM Program description

Office of Pipeline Safety IM Program Records Reviewed During Inspection Assessment Results – Preliminary and Final ILI Vendor Reports – Operator evaluation of ILI Results including the Integration of other Data and Information – Hydrostatic Test Reports Results of ILI Tool Data Evaluation – Date of Discovery – Anomaly characterization and categorization

Office of Pipeline Safety IM Program Records Reviewed During Inspection, continued Repair Records – Date of repair – Location of Repair – Type of Repair Pressure Reduction Records – Immediate repair conditions – 60 and 180 day anomalies for which remediation can not be accomplished in required time

Office of Pipeline Safety Inspection Process Improvements – Inspector Lessons Learned Meetings Common industry problems, inspection experiences, and unique insights Effectiveness of Protocols Areas where additional guidance is needed –New or improved FAQs –Areas where technical expertise should be brought in

Office of Pipeline Safety Enforcement Objectives for IM Assure operators are developing and implementing IM Programs consistent with the rule: – Performing integrity assessments in accordance Assessment Plans – Addressing issues discovered through assessments – Developing and implement required IM program elements to provide improved protection for HCAs Foster improvements in IM Programs as they proceed from a “Framework” to a mature program

Office of Pipeline Safety OPS Enforcement Approach Enforcement Instruments the Same as for Standard Inspections – Notice of Amendment (NOA) – Warning Letter – Notice of Probable Violation (NOPV) Proposed Compliance Order Proposed Civil Penalty – Corrective Action Order Feedback also provided through Exit Interviews, Inspection Summary Reports, and Letters of Concern

Office of Pipeline Safety Enforcement for Prescriptive Requirements Rule has clearly required actions and time frames – Segment Identification – Baseline Assessment Plan and Framework Preparation – Baseline Assessment Methods & Schedules – Mitigation/Repair Time Frames – Re-assessment Intervals NOPV and Warning Letter used to address probable violations

Office of Pipeline Safety Enforcement for Process-based Requirements Process-based Requirements Involve Development of IM Programs – In-Line Inspection Results Review and Data Integration – Risk Analysis Variety of Acceptable Processes Rule allowed for a “framework” maturing into a fully developed program These characteristics dictated a different approach for enforcement

Office of Pipeline Safety Guiding Principles for Process- based Requirement Enforcement Foster Development of Mature and Effective IM Programs, Processes & Tools No Rigid “Standard” for IM Program Acceptance Structured Inspection Protocols Focus on Basic Requirements & Visible, Demonstrable Efforts to Comply Strive for Consensus among inspection teams

Office of Pipeline Safety Process-based Requirement Enforcement Extensive use of NOAs & Letters of Concern NOPVs restricted to: – where little or no evidence of process development was presented, – omission of rule requirements for program elements (e.g., required risk factors, ignoring available data), or – technical errors and unjustified assumptions resulting in: Inadequate understanding of risk conditions; or Potential for significant impact on the level of protection provided to HCAs.

Office of Pipeline Safety Enforcement Approach is Still Evolving Revised our approach to close NOAs based on experience from Segment Identification Inspections – Eliminated requirement for “order directing procedure amendments ” Continuing to reengineer our internal processes to process cases faster – Developing detailed guidance for IM enforcement decisions that will expedite actions recommended by the Region inspection teams

Office of Pipeline Safety Re-establish Enforcement Program’s long term goals and objectives – Logically structuring regulatory strategies to achieve goals – Defining and implementing actions to achieve strategies – Creating metrics to evaluate enforcement program effectiveness Enforcement Approach is Still Evolving, continued

Office of Pipeline Safety Summary – The Path We’ve Taken Extensive Industry/Stakeholder Communication Detailed Inspection Protocols Broad-based Inspector Training in New Areas Internal Efforts to Assure Consistency in the Inspection Process Evolving Enforcement Approach

Next Up – What we learned on our Journey