API 17 – Subsea HPHT Discussion HPHT Design Materials Design Performance Test 1 Design Methodology has been in review and development for 5+ years and.

Slides:



Advertisements
Similar presentations
Challenges for Hydrostatic Pressure Testing of subsea systems
Advertisements

SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
API 17 – Subsea Boosting Discussion Recommended Practice for Integrity Management, Qualification Requirements, and Referenced Standards Purpose of discussion:
PETE 411 Well Drilling Lesson 17 Casing Design.
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
Comparison between American and European Pressure Vessel Rules
ASME Liaison Report to CRE May 18, 2011 Urey R. Miller, P.E.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
API - WI 2348 Methodology to provide Mechanical Assurance in DCB test
API 20K Flange Design Task Group API SC6 Task Group
Gas Transmission Pipelines
PURPOSE OF DFMEA (DESIGN FAILURE MODE EFFECTS ANALYSIS)
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Product Design and Qualification (Validation) Testing for HPHT Systems
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #19.
Gas Lift Production – Impact on Tubular Connections Presented by Gloria A. Valigura, Shell International E&P Patrick E. McDonald, Mohr Engineering, a div.
Introduction to Fitness-For-Service (FFS)
7A1 Friction & Galling Test
API 17TR11: Pressure Effects on Subsea Hardware During Pressure Testing in Deep Water (In Ballot) -Frans Kopp: Senior Principal Advisor Pipelines – Shell.
API Subcommittee 17 Industry Standards for Subsea Equipment
Pressure Vessels.
Progress Since January Meeting
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
API 6HP Process1 API 6HP Example Analysis Project API E&P Standards Conference Applications of Standards Research, 24 June 2008.
TG3 17TR8 Liaison Report HPHT Design Flow Chart
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
Safety and quality issues – studs and nuts Presentation API 6A Winter meeting Feb
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
API 18LCM (Life Cycle Management) Report back to SC17 August 27, 2015 Review Team: Dave Wilkinson, John Strut, Smarty John, David Saul, Peter Moles.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17TR8: High-pressure High-temperature (HPHT) Design Guidelines
1 Design Materials QC Validation HPHT Approach Why Needed? HPHT & Critical Applications – Defined by CFR for Surface Equipment as:  SITP at Wellhead of.
19th January 2012 Don Wells (Hess)
Product Development and DSM. Rational Analysis vs. Chapter F For a new section, outside the boundaries of the pre-qualified limits of DSM you begin with.
Current Industry Assessment
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
API 17TR11: Pressure Effects on Subsea Hardware During Flowline Pressure Testing in Deep Water (Publication September 2015) -Mike Williams, FMCTI (Retired)
Service is the difference MEA Roundtable October 30, 2007.
"Welder Certification" Weldertraining.org The purpose of this presentation is to introduce you to the various aspects of welder certification. This is.
TG Chair: Darren Bane (BHI)
High Strength Bolting vs. Subsea Service Conditions
Materials Qualification for Bolting Applications
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
API SC19 HPHT Template (Proposed as SC19TR1)
API 17TR8: High-pressure High-temperature (HPHT) Design Guidelines
Task Group Status January ,11, 2017
Atmiya Institute of Technology & Science
API 14L Specification for Lock Mandrels and Landing Nipples
Regen Media Filter & Filter Media Task Group Update
Impact on SC 6 Documents by Kenneth Young
API 17Q – Subsea Equipment Qualification
API SC6 Valves and Wellhead Equipment
API 14H Task Group Status Proper Classification of Document
Impact on SC 6 Documents by Kenneth Young
Don Wells Hess Corporation
API 14H Task Group Status Proper Classification of Document
API 17 TR8 HPHT Design Guideline Methodology
Workshop on the Pressure Equipment Directive, Riga,
TG3 17TR8 Liaison Report ASME Task Group on Subsea Applications
API SC6 Valves and Wellhead Equipment
Gas Transmission Pipelines
Presentation transcript:

API 17 – Subsea HPHT Discussion HPHT Design Materials Design Performance Test 1 Design Methodology has been in review and development for 5+ years and relies on ASME BPVC, Section VIII, Division 2 or 3. – But no clear guidance when/where to switch from Div 2 – “Thin wall” to Div 3 – “Fracture Mech.” No industry (operator) guidance on Validation Testing. – What constitutes “acceptance”? Is it Annex F or something tied to fatigue life/fracture mechanics? Material Properties for pressure containing and pressure controlling components showing clarity on what’s needed in last 2 years. – But no data on material ‘s HPHT properties published for widespread use. – No clear path yet on seal technology. PER 15K : “… should be used as a guide by the various API Subcommittees to develop future documents on equipment specifications for HPHT service. This report is not intended to replace existing API equipment specifications. … intended to illustrate accepted practices and principles that may be considered…”

Elastic vs. Elastic-Plastic The question: How do we balance between 6A which has 20k and 350 and 17D which has 15k and 350? Most agree that for HPHT, E-P or Load-Limit + FAD (fracture mechanics) is way to go. The question: When do we switch?

Validation Testing The question: When is Annex F testing is no longer valid? Is Annex F only valid for elastic design / functional testing? What level of testing is desired when fatigue design life is identified?

Materials Issues What pressure containing/controlling properties need to be met? Tensile, Yield, elevated temperatures Tensile/yield ratio temperature & environment K1C, J1C, K1SCC for ranking Fatigue life at temperature Affect of cathodic protection - hydrogen Seals - creep resistance Fasteners - stress relaxation Main material use groups for HPHT Pressure Containing Pressure controlling Fasteners Seals

API 17 – Subsea HPHT Discussion HPHT Design Materials Design Performance Test 5 30 CFR (a), if you plan to install subsurface safety valves (SSSV) and related equipment in an HPHT environment, you must submit detailed information (APD, APM, DWOP) that demonstrates that the SSSV’s and related equipment are capable of performing in the applicable HPHT environment. 30 CFR (b) HPHT environment means the completion of the well requires completion equipment or well control equipment an assigned pressure rating greater than 15,000 pounds per square inch gauge (psig) or a temperature rating greater than 350 degrees Fahrenheit. 30 CFR (c), related equipment includes wellheads, tubing heads, tubulars, packers, threaded connections, seals, seal assemblies, production trees, chokes, well control equipment, and any other equipment that will be exposed to the HPHT environment. We’ve been at it for 5+ years How much time do we have left? When do we need 17TR8? When do we need to update 17D?

API 17 – Subsea HPHT Discussion HPHT Design Materials Design Performance Test Purpose of discussion: 1.Where we are with PER 15K and what it is and is not 2.Discuss where 17TR8 task group is and its current challenges Talking Points: – Immediacy – 30CFR requires industry analysis for >15k or 350F – Methodology suggested by ASME BPVC, but disagree on when to invoke – List of material (metals) properties are gelling but no data available – No guidance as yet on seal technology and their material properties – No guidance as yet on Validation Testing. Manufacturers reluctant to come up with solid R&D schedules and scope if they don’t know what will be accepted. How have Operators adapted qualification processes to project requirements and timelines?

HPHT Issues HPHT Design Materials Design Performance Test 7 GoM Lessees and lease operators planning completions of HPHT wells requiring completion and well control equipment with RWP > 15,000 psig. Current API design standards do not address subsea equipment with RWP > 15,000 psig or surface equipment > 20,000 psig. Technical advancements evolve to fill a need and generally precede the development of engineering standards. It is not the intention of BOEMRE to attempt to create design standards but rather to point to existing standards that address design methodologies and failure modes for HPHT equipment design. It is not the intention to hinder technical development, but BOEMRE will take a conservative approach to approving the use of HPHT completion and related equipment until applicable standards catch up with technical development. Draft NTL 263 on HPHT

We are not aligned with Brian on application of PER-15K and/or API 6A approach for 20K tree systems. Brian feels it is time to make a clean break, and start using the fracture mechanics approach. Conversely, we feel there is merit in using the classical 6A approach for 20K and temperatures 250 F and lower, including water injection. BOMRE requires the operator to define the approach/code to be used (30CFR – ) for anything over 15ksi or 350F. This doesn’t necessarily mean PER-15K approach. I am concerned about the timing required to get consensus on a PER-15K approach for subsea tree systems. I envision very new and different specifications for a fracture mechanics approach, that perhaps impact everything from raw material processing to product qualification, and everything in between. It could easily take several years to write and develop a specification and get it balloted. We did agree that it would not be a good idea to let the manufactures lead this initiative. There’s too much risk that the operators wouldn’t buy in to the proposal. That means the operators (maybe Shell and bp in this case) need to find resources to take the lead on whatever approach (could be a combination of both) for a “greater than 15K” specification. I personally believe that for the 20K applications I see on the horizon, the “classical 6A” approach is the only approach that could fit the likely timeline. In any event, we need to make management aware of the urgency of committing resources to address this issue.