Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.

Slides:



Advertisements
Similar presentations
Construction Project Coordination Presented by: Philip H
Advertisements

MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
11/4/2008 KUEGLER ASSOCIATES, LLC DESIGNED RIGHT = BUILT RIGHT.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Bond Program Planning Imperatives Study Session October 12, 2004.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 25, 2010 EDUCATE  ENGAGE  EMPOWER 1.
SCHEMATIC DESIGN PRESENTATION
1 Institutional Support Services Capital Project Process.
Successful Facility Assessments: Savings through Facility Manager and A/E Partnerships May 27, 2014.
BEEYAMS INTERIOR DESIGN. INTERIOR DESIGN CONSULTANCY SPACE PLANNING DESIGN DEVELOPMENT CONCEPTUAL DESIGNING ESTIMATION MATERIAL SELECTION PROJECT MANAGEMENT.
Bethany Ramey Trombley Architect, LEED AP ID+C September 10, 2010 UT’s Hearst Student Media Center LEED GOLD Renovation What Starts Here Changes The World.
Building for Their Future Dublin Unified School District.
Houston Transtar Center Renovation / Expansion Presentation of Qualifications Interview of February 3, 2009.
Houston Independent School District Robert L. Frost Elementary School PROJECT PROFILE PROJECT DESCRIPTION Frost Elementary is a new replacement school.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
NEH Challenge Grant Workshop Appalachian College Association Summit Abingdon, VA October 23, 2010.
BUILDING PROJECT AND THE FEASIBILITY STUDY August 20, 2012 Wachusett Regional High School MOUNTVIEW MIDDLE SCHOOL.
US Army Corps of Engineers BUILDING STRONG ® Norfolk District, U.S. Army Corps of Engineers Dutch Dialogues: Virginia – Life at Sea Level Coastal Resilient.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e U.S. Air Force Civil Engineer Center Society of American Military Engineers San Antonio Post SMALL.
Howard County Consultant Services for Interior Space Evaluation, Planning, and Design Services Expression of Interest # September 9, 2008.
TOPIC-9- PROJECT ORGANIZATION
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
1 Energy Efficiency & Utilities Sector March 2014 CALIFORNIA COMMUNITY COLLEGES CHANCELLOR’S OFFICE.
Architectural, Engineering, and Professional Construction Services Consultants Request for Qualifications February 11, 2005.
Silverleaf Resorts, Inc. Ocean Club - Galveston October 29, 2012.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
ALLIANCE TEXAS CONFERENCE SMALL BUSINESS WORKSHOP June 29, 2010.
Significant Points  More than 26 percent of all landscape architects are self employed.  A bachelor’s degree in landscape architecture is the minimum.
The Projects Side Steve Berezansky OSFC Chief of Projects.
Douglas Townes FHWA Resource Center 3D Engineered Models for Construction - Implementation March 14, 2013 | Washington, DC TRB Committee on Intelligent.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
2011 D.C. Trip Report May 31, June 1-2, 2011 Washington, D.C.
An Introduction To Food Service Consulting FCSI & AIA Working Together.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
City Council Meeting June 16 th, 2013 – Community Center Eric Contreras, Assoc. AIA, CGC AADAG Consulting Services, LLC (ACS) LEED AP® Architecture–Engineering-Construction.
SPRING INDEPENDENT SCHOOL DISTRICT a winning team.
Interior Design License Requirements
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
TOPIC-9- PROJECT ORGANIZATION
Self-Directed Energy Contracting Saving Your Buildings and Your Money.
Interview For Professional Architectural Services Florida Department of Health Office of Design and Construction 4052 Bald Cypress Way Tallahassee, Florida.
AS DOT&PF is responsible for the planning and construction of public works, expect court facilities. Public Facilities or Public Works include.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
GEOTHERMAL ALTERNATIVES, OPTIONS & SOLUTIONS Engineers. Consultants. Commissioning. MEP ASSOCIATES, LLC Presenter: Jeff Urlaub, PE.
Introduction to Energy Efficient Design
Overview of MSBA Building Process and Project Timeline
Overview of MSBA Building Process and Project Timeline
Fun Facts: James M. Bennett High School
THE PALM BEACH COUNTY LEAGUE OF CITIES.
CITY OF HALLANDALE BEACH
Capital Project Needs Assessment
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Johnson & Pace Incorporated TAMU Facility Management Working Group
Silver Lake Regional High School
MSBA Owner Project Manager Review Panel
College West Residence Renewal Project
KUEGLER ASSOCIATES, LLC
Facilities Modernization Program
Introduction to Building Codes
Presentation transcript:

Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010

Matrix Spencer Architecture, Planning & Interior Design

Matrix Spencer Architects, established in 1967 as Spencer Partnership Architects, is a multi-discipline architecture firm providing comprehensive planning, facility design, engineering coordination, interior architecture, interior design, project management and construction-related services. Matrix Spencer Architects is well known throughout Texas and the Houston metropolitan region for exceptional professional architectural services. Our staff has designed more than 250 schools and secondary education facilities over our 43 year history. Matrix Spencer is comprised of architects, planners and designers with extensive education design experience. We are experts in occupied renovation projects involving complex phasing and strict schedule / budget compliance.

Introduction of Project Team Matrix Spencer - Prime  J. Gordon Spencer, AIA, RIBA, Principal-In-Charge  Steven L. Biegel, AIA, LEED AP, Project Manager  Ken Cvejanovich, LEED AP, Architect  Horacio Gomez, AIA, LEED AP, Architect  Ray Ferrari, AIA, LEED AP, Architect  Richard Adamchak, AIA, Architect

Introduction of Project Team O’Malley Engineers  Edward T. Addicks, P.E. Civil Engineer HRE, Inc.  Jeffrey Parker, P.E. MEP Engineer Haynes Whaley Associates, Inc.  Jeremy Anderson P.E., LEED AP, Structural Engineer 4b Technology Group  Geoff Basford IT Consultant Bennett Wagner & Grody  Don Grody, AIA Architectural Consultant Clark Condon Associates  Paul Weathers, ASLA Landscape Architects

Organizational Chart Brazosport College Architectural / Engineering Services Principal-in-Charge J. Gordon Spencer, AIA, RIBA Project Manager Steven L. Biegel, AIA, LEED AP MATRIX SPENCER PROJECT TEAM Project Architect Ken Cvejanovich, LEED AP Civil EngineerStructural EngineerIT Consultant Edward T. Addicks, P.E.Jeremy Anderson, P.E., LEED APGeoff Basford O’Malley EngineersHaynes Whaley Associates4b Technology Group Landscape ArchitectureMEP EngineerArchitectural Consultant Paul Weathers, ASLAJeffrey Parker, P.E.Don Grody, AIA Clark Condon AssociatesHRE, Inc.Bennett Wagner & Grody Project Designer Robert A. Herolz

J. Gordon Spencer, AIA, RIBA Matrix Spencer Education University of Alabama – 1958/1959 Lamar University – 1960 University of Houston – 1961/1964 Architectural Registration TX 3869 / CO / GA / LA 2953 / ME 1102 / MD 2548R / MO A5151 / NV 4856 / NJ / NY / OK 2151 / PA RA015354B / WV 2979  Practicing Architecture in the U.S. since 1961  Currently working in Galveston  Over 250 Educational Public Facilities  Numerous Governmental Facilities  Commercial Multi-Purpose Mid-Rise Buildings  Condominiums  Parking Garages  Master Panned Multi Use Projects  Occupied Renovation

Education Syracuse University School of Architecture – 1978 University of Virginia, Graduate Classes, Urban Planning & Design – 1979 Catholic University School of Law, Federal A/E Procurement, Continuing Education Credits – 1979 George Washington School of Law, Continuing Education – 1996 Architectural Registration TX / LA 4801 / DC 3153 / FL / MD 5208 / NJ / NY / PA 8877 / GA  Practicing Architecture in U.S. since 1980  Expert in Public Building Renovation  Building Evaluations & Assessments  Sustainable Design  Authored the portion of Encyclopedia of Architecture, Design and Construction entitled “Roofing and Roofing Systems”, published by McGraw Hill  Over 140 Occupied Renovation Projects Steven L. Biegel, AIA, LEED AP

Education University of Copenhagen, Denmark – Fall 1974 Tulane University - New Orleans, LA Bachelor of Architecture – 1976 Tulane University – New Orleans, LA Master of Architecture Architectural Registration TX / LA 2831  Practicing with firm for over 21 years  Understanding of Gulf Coast design  Currently working in Galveston on Diamond Beach  Schools (K-12)  Condominiums  Churches  Office Buildings  Code and Life Safety Analysis Ken Cvejanovich, LEED AP

Haynes Whaley Associates – Structural Engineers

HRE, Inc. – MEP Engineers

History of working in Galveston / Coastal areas Diamond Beach Resort – Galveston, TX Size:120 Units Cost:$70 Million *Diamond Beach was not affected by Hurricane Ike

History of working in Galveston / Coastal areas Emerald by the Sea Condominiums – Galveston, TX Size: 15 story building with approx. 100 units Cost: $35 million *The Emerald was not affected by Hurricane Ike

History of working in Galveston / Coastal areas Regional Professional Building – Port Arthur, TX Size: 5 story - 128,000 SF Cost: $5.8 million

Similar Project Experience Dulles School Campus Additions and Renovations  Complete interior and exterior renovations and additions for the district’s premier campus comprising on-site elementary, middle and high school facilities.  4,500 students remained on-campus during the phased, two-year construction period.  Physical structures were upgraded, HVAC were completely removed and replaced, 70% of electrical was replaced, 40% of plumbing was replaced.  Classes continued with minimal interruptions.

Similar Project Experience

Project Understanding  Two Concurrent Projects  Infill Project to Create Library Space  Phased Construction  Swing Space Needed  Four Distinct Tasks

Project Understanding  Temporary egress routes  Temporary utilities  Life Safety requirements  Contractor Staging and Equipment areas  Noise and Dust Migration  Security  IT and Data Cabling  Back-up Power System

Project Understanding

Project Approach  Program Confirmation  Code Analysis  Egress Paths  Phasing Plan  Swing Space  Surgical Construction

Project Schedule

Project Approach  Confirm Budget at Schematic Design  Set Schedule and Milestones  Strong Leadership + Coordination  Innovative Solutions

Best Practices  Re-state Project Scope  Clearly Define Project Boundaries  Life Safety and Code Compliance  Energy Conservation (ASHRAE 90.1)  Natural Light and Ventilation  Confine Construction Operations  Minimize Number of Moves (Swing Space)

Quality Control / Quality Assurance Phase / Service Matrix

Summary  Experienced in Occupied Renovations  Key Team Members in Houston  Programming Expertise  Extensive Existing Building Assessment Experience  Preliminary Designs Studies (PDS)  Program of Requirements (PORs)  Strong Project Management  Construction Phasing & Scheduling Experts

Thank You!