Noah Garcia-Galan *Some information in this presentation comes from outside sources.

Slides:



Advertisements
Similar presentations
Clarkson University. Physics, Chemistry, Calculus English Course, History, Technical, Economics Physics Modern Physics Quantum Mechanics Solid State Physics.
Advertisements

Unit 3, Chapter 9, Lesson 9: Space Systems Engineering 1 The Systems-engineering Process Trading Requirements We use the requirements loopa necessary and.
Satellite Communication
CS487 Software Engineering Omar Aldawud
Software Development Methodologies Damian Gordon.
Tutorial 12: Enhancing Excel with Visual Basic for Applications
Understanding the Systems Engineering Process
Prepared by: Hamzah Snouber For: Dr. I mad Breik.
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
Introduction to Space Systems and Spacecraft Design Space Systems Design Power Systems Design -I.
Photovoltaic “Parallel System” for Duke Farms Group Members Trecia Ashman Paola Barry Mukti Patel Zarina Zayasortiz.
A Guide to Oracle9i1 Creating an Integrated Database Application Chapter 8.
Ch2: Operating Systems Dr. Basel Mahafzah. What is an Operating System? An operating system (OS) is a collection of programs which initializes the hardware.
1 Case Study: Starting the Student Registration System Chapter 3.
Generic Simulator for Users' Movements and Behavior in Collaborative Systems.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
LSU 10/09/2007System Design1 Project Management Unit #2.
Introduction to Electrical Engineering COMM 486 – Multimedia Literacy Project Benjamin S. Garrett 10 May 2015 Let’s Begin! Let’s Begin!
Solar Power Marine Corps Expeditionary Power Systems.
Exploring Microsoft Excel 2002 Chapter 8 Chapter 8 Automating Repetitive Tasks: Macros and Visual Basic for Applications By Robert T. Grauer Maryann Barber.
NASA/NSTA Web Seminar: Living and Working in Space: Energy LIVE INTERACTIVE YOUR DESKTOP Thursday, February 1, :00 p.m. to 8:00 p.m. Eastern.
Microsoft Visual Basic 2005 ENRICHMENT CHAPTER Visual Studio Tools for Office.
MS Access Advanced Instructor: Vicki Weidler Assistant:
Pioneer Venus & Galileo Probe Development: Comparison/Assessment John Givens.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
Smart-Grid: Power Distribution and Monitoring Application Cheryl Limas, Daniel Rendon, Advisor – Dr. David Wetz, Advisor – Gregory Turner Department of.
Overview of SQL Server Alka Arora.
GroundsOpsStaff (Last Updated 9/9/2010) A Grounds Operations and Staffing Computer Application Based on APPA Operational Guidelines for Grounds Management.
Advanced Excel for Finance Professionals A self study material from South Asian Management Technologies Foundation.
1 wp4 – Technical Issues for payload integration within the Nacelle for High Altitude flight Budapest 24/11/04 Marco Bobbio Pallavicini Carlo Gavazzi Space.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
CSCI Research Project and Seminar Team #1 10/02/2007.
Tierra Holcomb Found. Tech 3B.  A solar panel (also solar module, photovoltaic module or photovoltaic panel) is a packaged, connected assembly.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
1 Visual Basic for Applications (VBA) for Excel Prof. Yitzchak Rosenthal.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Copyright © 2008 Pearson Prentice Hall. All rights reserved. 1 Microsoft Office Excel Copyright © 2008 Pearson Prentice Hall. All rights reserved
1 Computer Programming (ECGD2102 ) Using MATLAB Instructor: Eng. Eman Al.Swaity Lecture (1): Introduction.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
OCC Network Drives  H:\  P:\ 
Battery Status Monitor: The source of decision making for a Smart Micro-Grid Daniel Rendon, Cheryl Limas, Greg Turner - Advisor, Dr. D. Wetz - Advisor.
Why Design Tool? 93 年 10 月 21 日. EPS Course - 2 Simple Problems Close form solution Complex Problems Computer.
Exploring Microsoft Access Chapter 8 Creating More Powerful Applications: Introduction to VBA.
Microsoft Access 2010 Chapter 8 Advanced Form Techniques.
9 Systems Analysis and Design in a Changing World, Fourth Edition.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
Leading global excellence in procurement and supply What is purchasing and supply? Emma Scott Representation Manager CIPS.
Visual Basic for Application - Microsoft Access 2003 Programming applications using Objects.
Application Software System Software.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 EPS—Design Lesson 20 Spring 2005.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Institute for the Protection and Security of the Citizen HAZAS – Hazard Assessment ECCAIRS Technical Course Provided by the Joint Research Centre - Ispra.
YOU’VE GOT THE POWER!. When the grid goes down, which type of system do you want for emergency power: battery or generator? Either type will get the job.
Software Development Methodologies (1950s – 1970s) Damian Gordon.
COMPREHENSIVE Excel Tutorial 12 Expanding Excel with Visual Basic for Applications.
The Advantage Series ©2005 The McGraw-Hill Companies, Inc. All rights reserved Chapter 12 Introducing Visual Basic for Applications Microsoft Office Excel.
Know how NASA plans and implements space missions Comprehend the essential components of a space mission Comprehend the selection and training of astronauts.
Spacecraft Technology Structure
The Future of Human Spaceflight *** A Journey to Mars
Space Travel Present & Future
06 Master Data – Item
Exploring Microsoft Excel
DMSP Defense Meteorological Satellite Program
Launch and On-orbit Checkout
Presentation transcript:

Noah Garcia-Galan *Some information in this presentation comes from outside sources.

Left : Brent Hughes Right : Noah Garcia -Galan Brent Hughes Works as the Technical director at Lockheed Martin After graduating from Texas AM, Brent Hughes established himself at Lockheed Martin where, through years of working for various projects such as the space shuttle, become Manager of an electrical designs team

Mr. Hughes manages the Electrical Power Systems (EPS) team for Lockheed Martin, which supports the NASA Orion contract. He is responsible for the technical leadership of the product team that develops the following: Power Generation including solar arrays Power distribution in the Crew Module and Service Module Power Storage, including Lithium ion batteries Mr. Hughes also manages the budget and schedule of the design, manufacturing and test of all the components of the EPS system Management of the schedule is critical since there are many parts that need to be procured in advanced to be able to assemble the spacecraft on time Budget planning and execution includes material cost, development of designed products, and engineering support required to do design, installation, and test of the EPS hardware

Lockheed Martin is the prime contactor for the Orion project. The company designs, manufactures, and tests spacecraft that need to meet the requirements and objectives that are provided by NASA As a prime contractor, Lockheed integrates other sub-contactor’s efforts and manages the overall development of the spacecraft Sub-contactors managed by Lockheed include: Hamilton Sandtrand Honeywell Aerojet Lockheed also does the assembly and test operations to ensure that the spacecraft is working as designed once it is built

Electrical Power Systems on Orion are comprised of Power Generation, Storage, and a Power Distribution sub-subsystem. Power Generation: There are 4 Solar Array Panels in the Service Module (SM) of Orion, which are deployed after orbit insertion, several minutes after launch. The Solar Panels provide electrical power from deployment to Crew Module (CM) – SM separation, approximately 20 minutes before Orion re-entry into Earth Atmosphere. Power Storage: There are 4 Lithium Ion Batteries located in the CM, which store power generated by the Solar Panels, and provide electrical power during eclipse and after CM-SM separation, when the Solar Panels are no longer available. Power Distribution: Power is distributed by 2 main strings of components in Orion, at 120V. There are several components that perform the distribution functions, but the most relevant are the Power Data Units (PDU), and the Load Switch Cards, which provide power switching for the different electrical loads.

The EPS designers rely on math models to obtain predictions of the EPS system at different levels Power Generation – Solar cell and Panel performance: The Solar Panels are comprised of solar cells with specific electrical characteristics. The math models enable the engineers to calculate how much the individual cells produce, and how much is expected from the entire Solar Panel given things like temperature, sun angle, etc. Power Storage: Battery Performance and margins The Orion batteries are used during times when there is no solar power available from the arrays, so it is critical to understand how much capacity is available, and how quickly they will drain. Math models can calculate how fast the power will be drained from the batteries, and how long a voltage level can be maintained on the bus by calculating the total amount of current from all the loads like: heaters, fans, lights, etc. Power distribution: Similar to electrical systems in homes, Orion EPS has protection from short circuits, etc. Math models can calculate how many loads can be connected to a switch, given the load current demand and capacitance, and line losses/resistance.

Through the use of VBA in Excel, math iterations can be run in lengths to describe inherent patters that show a relationship between the parameters given and the performance data. The programing language used, VBA, is an event driven language that allows that user to define specific structures that run in setup that is then associated with a “macro”. The macros are then either assigned to a command button or run separately to display the results of the coded function. The main purpose of creating math models is to show the interaction with both the solar arrays and electrical storage systems that supply life essential operations to the crew of either Orion space craft or the International Space Station… The project appeared to have strong ties with the current Lockheed Martin project of Orion, which would provide a stronger base for possible applications of the math models in the present conditions of the space program. "How To: Expose Code to VBA in a Visual Basic Project." How To: Expose Code to VBA in a Visual Basic Project. N.p., n.d. Web. 23 Feb Mabbutt, Dan. "What Is Visual Basic?" N.p., n.d. Web. 23 Feb

VBA code is viewed in a separate window from excel spread sheet This representation is similar to the code that will be used in the final product. The only difference will be in the equations used Once the code is run, either through a button or other means, the function established in the code will use variables that can be determined by the user or another function

The project and product both have allowed me to develop a further understanding of the role electrical and systems engineering has in the field of aerospace engineering. With hopes of a possible career in NASA or Lockheed Martin, this mentorship provided information over the processes and structures of the design and systems teams. The importance and applications necessary to complete a specified mission allow for a wide range of groups to develop a complex design that fully integrates various factors that become essential to the continuation of space exploration. "Case Study: NASA and Lockheed Martin for Planning First Manned Mission to Mars - Palisade." Case Study: NASA and Lockheed Martin for Planning First Manned Mission to Mars - Palisade. N.p., n.d. Web. 23 Feb

Thank you Mr. Hughes and as well as Mrs. Click for allowing me to work with my mentor and evaluate the project I have sustained

"Case Study: NASA and Lockheed Martin for Planning First Manned Mission to Mars - Palisade." Case Study: NASA and Lockheed Martin for Planning First Manned Mission to Mars - Palisade. N.p., n.d. Web. 23 Feb "How To: Expose Code to VBA in a Visual Basic Project." How To: Expose Code to VBA in a Visual Basic Project. N.p., n.d. Web. 23 Feb Mabbutt, Dan. "What Is Visual Basic?" N.p., n.d. Web. 23 Feb. 2015