Eric Prebys/LARP 9/7/2015.  Official information still very limited  Last press release (Sept. 23) refers to “large helium leak”  No pictures.  Logbook.

Slides:



Advertisements
Similar presentations
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Advertisements

The Large Hadron Collider
Prove that the following wff is valid by means of resolution:  xp(x)v  xq(x)   x  p(x)vq(x)  Why can’t you do this problem?
February 2009 Summary of Chamonix 09 Steve Myers.
BIG IDEA: Rocks and minerals have properties that can be: observed, tested, described, identified and recorded.
Chapter 9 Testing the System, part 2. Testing  Unit testing White (glass) box Code walkthroughs and inspections  Integration testing Bottom-up Top-down.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Chapter 11: Testing The dynamic verification of the behavior of a program on a finite set of test cases, suitable selected from the usually infinite execution.
On May 6 th 1937 the Hindenburg, a Nazi passenger blimp, as large, grand and doomed as the Titanic fell from the sky. Herb Morrison is quoted saying “it’s.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
Science Projects!!!. Day 1  Finish your scientific tests (yes you need data!)  Upload your pictures to Google drive!!! (If they are not there, you are.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
1 Project Failure Factors Well known Yet ignored..
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) Google welcome screen from September 10, /5/2010.
Compressed Gas Cylinder Safety
1 Sport-Ident 102 Barry McCashin Edmonton Overlanders Orienteering Club Jan 18, 2009 UofA - Biosci © BGMcC 2009 Part 3: Download SI Punches (40 slides)
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Confidence Intervals feeling comfortable with error Richard Lambert, Ph.D.
Recreating the Big Bang with the World’s Largest Machine Prof Peter Watkins Head of Particle Physics Group The University of Birmingham Admissions Talk.
HURRICANES. §Hurricane Andrew whacked the southern United States in It left more than 50 people dead, thousands of people homeless, and did more.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Lab Reports in Chemistry The purpose of a lab notebook is to keep a record of what occurs in an experiment.
Eric Prebys, Program Director US LHC Accelerator Research Program (LARP) 10/24/2008 Ultimate tribute Sept 10, 2008.
F Eric Prebys Particle & Accelerator Physicist Fermilab.
Run Coordination Summary of the May 14, 2004 Run Coordinator Meeting CT-EC2 Run Preparation Meeting May 17, 2004 Slide 1 Peter Loch University of Arizona.
Electrical Circuits. Objectives Objectives – Explain how electrical energy is supplied to devices in a circuit. – Use electrical symbols to draw simple.
F All Experimenters' Mtg - 27 Jan 03 Week in Review: 01/20/03 -01/26/03 Ron Moore – FNAL Found obstacle in AP-1 line Replacing corroded Tevatron dipole.
Sight Words.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Do Now Heading: UV Radiation Pick up a sun safety pretest from the front table Begin working on it – There are no wrong answers.. I just want to see what.
Big Bangs at the Large Hadron Collider Experimental Particle Physics Group University of Arizona.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
The Universe Today & The Big Bang. The Big Bang Astronomers generally agree that the universe began between 10 and 20 billion years ago. As the universe.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
1 LHC and CMS Status Robert M. Harris Fermilab Fermilab All Experimenters Meeting Nov. 10, 2008.
Home for me is a combination of both good and bad. For a time home inside of me was very dark and a scary place to be, but on the outside.
Extraction and beamline progress B.Goddard TE/ABT.
PPC Head does the “Job Card Approval” Sale Order + Schedule Specification Sheet Machine Linking Create Job Card Job Card Approval WIP – Printing WIP- Lamination.
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
How to use Past Simple Tense By Miss Chonladda Phonklang Soengsang School.
 Presented ongoing activities in LARP  Magnet Systems  Accelerator Systems  Program Management  Also presented plan for “spinning off” construction.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
Example: What word does the writer use to describe the chilling effect that Jekyll’s changing face had on Utterson and Enfield’s inner feelings? (1) 1)The.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
TEDDY ROOSEVELTWILLIAM TAFT  Became president after William McKinley was assassinated in  Roosevelt believed that businesses, workers, and.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
2016 Operations StayTreat 4-Hall Ops and Operations: What is the Control room vision for 4-Hall Ops?
Missouri Department of Natural Resources
LHC schedule.
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
Business Communication
Business Communication
Car Repairs that will Prevent an Accident
Short Answer Questions
LHC Status, Upgrade Path, and US Contributions
The Large Hadron Collider
Computer Vision - A Modern Approach
LHC Status, Upgrade Path, and US Contributions
CAR RALLY PROCEDURES Check into the travellers net when leaving home (frequency listed in the roster notes and generally the callsign used is VK1WI On.
What do you know about xrays?
“The Great Escape” page 100.
Short Answer Questions
US-LARP Task: IR Commissioning
US-LARP Task: IR Commissioning
Presentation transcript:

Eric Prebys/LARP 9/7/2015

 Official information still very limited  Last press release (Sept. 23) refers to “large helium leak”  No pictures.  Logbook entries noticeably terse. 9/7/2015 Eric Prebys - All Experimenters' Meeting

 Italian newspapers are very poetic (at least as translated by “Babel Fish”): "the black cloud of the bitterness still has not been dissolved on the small forest in which they are dipped the candid buildings of the CERN" “Lyn Evans, head of the plan, support that it was better to wait for before igniting the machine and making the verifications of the parts.“*  Or you can Google “What really happened at CERN”: 9/7/2015 Eric Prebys - All Experimenters' Meeting * “Big Bang, il test bloccato fino all primavera 2009”, Corriere dela Sera, Sept. 24, 2008 ** **

 Tunnel secure, and safety systems up and running  Crew went in today for first inspection of interconnect at “ground zero”.  No details yet  Level of visible damage not clear  Still no pictures released, but those that have seen them describe them as “dramatic”.  Estimates are that “on the order of a dozen” magnets will need to be replaced:  Unconfirmed Lyn Evans quote: “8 dipoles and 4 quadrupoles”.  Big questions:  Why didn’t quench protection system work?  What went wrong with the pressure relief system?  Is there a simple fix to make it work in the future?  Assuming the answer to the third question is yes, the current schedule for beam is May 1 or June 1, 2009  If the answer is no, it’s too early to come up with a schedule. 9/7/2015 Eric Prebys - All Experimenters' Meeting