MICE - UK Project Progress Roy Preece 30 th April 2013.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Electrical & Control Power Supplies Trevor Hartnett.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
MICE CM32 25 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
S A Griffiths CM42 June 2015 Electrical & Control.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
MICE Absorber and Focus Coil Magnet – Test Results
Muon Ionisation Cooling Experiment Overview
MICE CM31 Schedule summary
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Presentation transcript:

MICE - UK Project Progress Roy Preece 30 th April 2013

Overview Focus Coil Magnet 1 Cooling / Testing Magnet 2 Construction Progress Magnetic Mitigation Analysis West Wall Rack Room 2 and Control room Partial return yoke RF DL and Hall operations Hall operations Decay Solenoid Spectrometer Solenoid frames LH2

Focus Coil – Magnet 1 Cooling / Testing Test of the cryo coolers – 23 rd November –Successful operation with first and second stage cooling. –Water chiller operated well –Confidence for starting the LN2 cooling LN2 cooling – 26 th November –Goal of 90K for the cold mass –LN2 cooling during the day –Pump and purge with He gas 3 times –Cryo cooler operate overnight. –Allow second stage of cold head to warm to 80K before re-starting LN2 input. –Final LN2 input 6 th December – Cold mass at 90K Coolers operating – 6 th December –He gas regulated to input 1.05 bar to the cold mass Helium circuit –Approximately 20 bar of gas has been used (not lost) –Cold mass and second stage heads at temperatures that indicate Helium being condensed.

Focus Coil – Magnet 1 Cooling / Testing Cryo cooler operation check LN2 Cooling (Cryo cooler overnight) Coolers Operating LN2 Cooling Cold Mass temps Radiation Shield 2 nd Stage Head

Focus Coil – Magnet 1 Cooling / Testing Cooling to Full Gas input from bottle pack – 1.05 bar Level sensor operating but not able to communicate with the control system. System cooling over the Christmas period By the New year the level was reported as being 100%. Pressure feedback heater systems operating with a regulation of bar. Level reduced to 80% using the pressure regulation heaters and the exhaust poppet valve. Shows a system that can be adjusted without issue Pressure regulated at 1.14 bar with a gas bottle backup set to 1.05 bar. System safety backup In the event of heater failure gas bottle would over pressurize. Easily demonstrated zero boil off conditions. Control system and monitoring works well.

Focus Coil – Magnet 1 Cooling / Testing Solenoid mode powering Powering in Solenoid mode starts 11 th January. Quench induced at 50A to test the dump resistors and quench system Some minor issues casing false quenches, problems solved. Power supply controller Threshold of the voltage limit to low – raised for following tests to 500mV Solenoid mode operating current of 114A achieved, held and ramped down. Magnet cabling re-configured to operate in Flip mode (225A operating current) Scope logging applied to the Quench system to log the quench events Quenches occur at 145A, 152A, 158A, 161A and 162A Concern over the lack of significant jumps in current Tesla stop the testing until understanding of the quenches.

Focus Coil – Magnet 1 Cooling / Testing

Continued Flip mode powering Following discussions between the MICE AFC group and Tesla is was decided to continue with testing Investigation of the voltage at the splice joints is to be looked into, 1 splice / coil Ramping up to a nominal current ~ 100A Continue to quench Quench occurred at 170A A significant jump from the last interval Plans are to continue applying current, Tesla have ordered more LHe to be delivered this week.

Focus Coil – Magnet 2 Construction Progress Construction The outer vacuum vessel is being leak tested at the moment Background He rate is high so causing some problems in ascertaining the actual leak rate of the vessel. Tesla are confident of there being no leaks in the vessel Radiation shield is nearing completion. Problem found with a sensor so intervention needed MLI wrapping of the radiation shield will be completed this week Cold Mass Will be inserted and mounted onto the supports this week Alignment will be carried out with oversight by Jason Tarrant He Turret The second He turret is being constructed in parallel to the main magnet construction. It is intended to be shipped with the magnet Oversight and Schedule Andy Nichols is now making regular visits to discuss with Tesla the progress and scheduled delivery. The forecast is for the second Focus Coil to arrive at RAL in July

Magnetic Mitigation - Analysis Model created using Opera and analysis using Vector Fields Detailed model for Step IV (more analysis of Step VI) Beam line magnets included DSA area Current shielding walls As much ferrous material equipment as possible, size limitations. Consideration of the ISIS and MICE control rooms for personnel safety.

Magnetic Mitigation - Analysis

Magnetic Mitigation – West wall Cryo Cooler head compressors - Single and Two stage Analysis has shown that the original location under the south mezzanine is unsuitable Field in the area around 400 gauss Local shielding would be required for each compressor High cost ~ £15k per compressor Moving the compressors to the West wall Reduces the ambient field to around 5 gauss No need for local shield Furthest distance possible (compressor hoses) Suitable for Step IV and Step VI compressors Number of compressors at each stage Step IV – 15 Two stage and 4 Single stage Step V – 21 Two stage and 4 Single stage Step VI – 27 Two stage and 4 Single stage Limitations He pressure lines no longer than 30m Access and egress to the main door for magnet deliveries, and other large equipment Minimise the work to “changes” to the current hall arrangements

Magnetic Mitigation – West wall

Magnetic Mitigation – Rack room 2 and MLCR

Magnetic Mitigation – Partial Return Yoke Parallel analysis at Brook Haven mainly aimed at the Step VI configuration Analysis and design is in place for the Step IV configuration Work needs to be started to gain a cost and resourced schedule for the installation effort. Changes to South Mezzanine Positioning of the Tracker cryostats Sliding floor changes Trench cabling / infrastructure changes Logistics

RF – DL and Hall Operations First Amplifier has reached 1.2 MW. Changes to the contact arrangements have been made to reduce air –side electrical breakdown Re-testing has re-started but are having trouble with the crowbar high voltage breakdown safety device. Current test has reached 125KW RF Engineer is now in post and has started work for the current testing period Also working on the requirements for the TIARA grant Water system for the RF Amplifier Installation of the Amplifier, Coax and dummy load

Hall Operations Decay Solenoid The magnet has been cooled in preparation for EMR running The new quench protection system will be tested with the old power supply The new power supply is scheduled for delivery in July Spectrometer Solenoid Frames Both frames have been installed into position The upstream frame has been loaded (5 tonnes) and test survey alignment carried out Model of a solenoid manufacture to aid with the alignment of the tracker patch panel and other service arrangements. LN2 system A new Hydrogen transfer line has been designed and procured in preparation for installation for Step IV operations