Technical and Installation 1. What will my slot depth/size for the bottom track need to be? The slot depth for standard flush tracks and full drainage.

Slides:



Advertisements
Similar presentations
Exterior Window and Door Frames
Advertisements

Common Components of a Traditional Wood Framed Building
Stairway Construction
Doors Wood Framed Doors.
Liftslide. Welcome 1)With over two decades of experience behind our designs, the company has positioned itself as the forerunner in the use of European.
Installation. Indoor Unit Installation Typical Installation.
CHAPTER 9 Thermal & Moisture Protection
Carpentry Skilled Trades 1201 Footings and Foundations.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Wall N Pond C17 (surface) Outlet 2”Cast Pipe **surface measurements only – see additional graphics for bottom and depth of pond. Height of door is 5’10”.
BCT 104 Construction Math Stair Calculations. Stair Codes Important Residential Stair Codes 1. The maximum stair riser is 8". The minimum is 4". 2. The.
Chapter 14 Floor-Plan Symbols.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
Architectural Drawing
Reduced Vertical Separation Minimum (RVSM)
Isometric and Oblique Pictorials
PowerPoint Presentation
Foundation Systems.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Cabinet Making 101 Julian Gonzalez El Toro High School Teacher-Woodworking.
DIMENSIONING The dimension line should be approximately 3/8” from the object and the extension lines should extend 1/8” beyond the dimension line. The.
Competency: Draw Floor Plans Objective: Determine door and window types.
Presentation Template
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
CONSTRUCTING A FIVE CABIN LATRINE
Exterior Wall (Masonry)
Architectural Dimensioning Part 2
Push-Up Greens Drainage: Visualized You know you have poor drainage when you see: Dr. Ed McCoy Ohio State University Water on the surface hours after a.
Types of Watering Systems: Irrigation Systems for Bedding Plants Topic #2155 Created by: Tracey Hoffman
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
Drafting and Dimensioning the Architectural Floor Plan
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Balloon Frame North-American invention, 1833
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Symmetry in Circles (II) Chords A chord is a line connecting any two points on the circumference. chord The biggest possible chord is thediameter.
Wall Framing Grimsby Secondary School Technology Dept.
Session 15 – 16 SHEET PILE STRUCTURES
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Chapter 38 Fireplace Construction and Layout. 2 Links for Chapter 38 Fireplace Terms Energy Efficiency Fireplace Section Related Web Sites Fireplace Elevations.
Barry is painting the exterior of a tube. The tube is shaped like a cylinder with the dimensions shown below. a. What is the surface area, in square inches,
Multiview Drawings. Multiview Drawing A multiview drawing is one that shows two or more two-dimensional views of a three- dimensional object. Multiview.
Auxiliary Views.
Introduction to BIM Module 04 – Interiors and Circulation.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Introduction to BIM Module 01 – BIM Modeling Basics.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
By Molly. Things that you will need  Fish tank  Grow bed tub  Water  Clay balls  Pipes  Oxygen pump  Water pump  Garden hose  Plants  Bucket.
Slicing through an object or building DRAWING SECTION VIEWS.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
Horizon Icemaker for Vision Satellite-fill Installation Installation Best Practices To navigate through the presentation, press the → and ← keys on your.
Unit 209: Drainage systems
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
VIEW SERIES with Sliding Door
Installation Walkthrough Image Guide
Flex Series & View Series
MDX-R3 INSTALLATION PROCESS ADJUSTABLE CONCRETE POOLS
VIEW SERIES Track Assembly & Installation
MDX-R3 INSTALLATION PROCESS NON-ADJUSTABLE CONCRETE POOLS
Welcome With over two decades of experience behind our designs, the company has positioned itself as the forerunner in the use of European door and window.
PLUMBING PLANS CHAPTER 31
Elevation Layout and Drawing Techniques
Week 5 Drafting and Dimensioning the Architectural Floor Plan.
ALDRC HEAD GATE FINISHED VIEW
Competency: Draw Floor Plans
Competency: Draw Floor Plans
LIFT,ESCALATOR AND MOVING WALKS
Presentation transcript:

Technical and Installation 1

What will my slot depth/size for the bottom track need to be? The slot depth for standard flush tracks and full drainage tracks can be determined by measuring 2-5/16” down from the top of the finished floor to bottom of the slot. This allows for approximately 1/2” shim space below the track. 2

What needs to happen with the drain hoses for the transverse drains and patented drainage track system? You will need to connect them with ½”ID drain tubing to your outside weep or drainage these tubes should be sloped a minimum of 1/8” per foot. Using a PVC pipe as a collection method for tubing may also be used. 3

Due to varied installation techniques, Weiland does not provide actual installation hardware. Please see below for a partial list of tools and supplies to complete the installation. 4 Does Weiland supply the attachment hardware? What supplies/tools will be needed?

How wide and deep will my pocket need to be? Actual pocket depths are shown on drawings. The approximate pocket depth can be calculated by adding 5.5 inches to the panel width. The attached drawings can be found at as PDF and dwg file. 5

How wide and deep will my pocket need to be? (cont’d) 6

How wide and deep will my pocket need to be? (cont’d) 7

How do I calculate the weight of the systems and is the weight carried at the top or the bottom of the units? The weight of the system can be calculated by: Panel width x panel height ÷ 144 = Sqft. Sqft. x (____) x # of panels LS 7.5LS weight point loaded on wheel sets at bottom track BBF 7.5BBF/BF weight point loaded at center of panel on wheel carriage at head track BF 6.5 Assumptions: Glass is ¼” over ¼” I.G. units EXAMPLE: 57 x 97 ÷ 144 = x 7.5 = panels = 1, 152 system weight 8

Why is the finished floor such a critical step? It is critical for the flooring and any grout lines to be at 3/16” below the top of the track for the panels to sit and seal properly. The exterior surface should be sloped properly so water won’t build up at the base of the panels. Allow a minimum of ¼” per foot slope from the edge of the door away from the opening. 9