1 Automatic Load Transfer – The Perfect Phantom Voltage SWEDE Conference Corpus Christi, TX May 3, 2006 Kenton M. Brannan, P.E. CenterPoint Energy - Distribution.

Slides:



Advertisements
Similar presentations
Chapter 12 Transformers. Chapter 12 Transformers.
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Load Management System
 E4 Electrical Installation #1 Power Distribution.
ENERGY CONVERSION ONE (Course 25741)
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
TRANSFORMERS. TRANSFORMER PARAMETERS Turns Ratio (n) It is defined as the ratio of the number of turns in the secondary winding (N sec ) to the number.
Magnetism Any time electrical power is moving through a wire magnetism is created Any time magnetism moves past a wire electrical power is created.
Universal College of Engineering & Technology
GE Consumer & Industrial Multilin  Single & Three phase models  Specific mount CT’s  Rectangular & Toroidial models  Plastic case & cast models  Multi.
Generator Protection. Amount of Protection Rated power of the generator Ratio of its capacity to the total capacity of the system Configuration of the.
ET 332A DC MOTORS, GENERATORS AND ENERGY CONVERSION DEVICES Lesson 7: Construction of Elementary Dc Generators 1.
Transformers Test Friday 3/30/12. Electromagnetic Induction Induction is the process of producing (inducing) a voltage by passing a wire through a magnetic.
Off-Grid Power Using Enphase Micro-Inverters Off-grid inverter systems, using batteries, can be used to provide AC power when the grid is down. It is possible.
Chapter 2 Transformers.
Unit 27 Transformers. Objectives –After completing this chapter, the student should be able to: Describe how a transformer operates. Explain how transformers.
Power Distribution Harmonics Case Study of 285-3F Chiller Plant Michael W. Harmon Principle Engineer Savannah River Nuclear Solutions, LLC Savannah River.
Electromagnetic Oscillations and Alternating Current
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Harmonics Problems in Distribution Systems Case Study AEP Texas Central Company Scott Lee, Reliability Engineer.
STEADY-STATE POWER ANALYSIS
POWER SYSTEM PROTECTION. Power system Generators Transformers Transmission lines »Underground cables »Overhead lines Distribution systems.
Connections of a CT and a PT to supply, load and relay.
POWER CIRCUIT & ELECTROMAGNETICS
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
Elec467 Power Machines & Transformers
1 60 Hertz Over Voltages For Arrester Applications For Arrester Applications.
Oncor Electric Delivery Study on Residential Electric Vehicle Charging SWEDE Conference 2012 Ron Shipman.
EKT 451 CHAPTER 1 TRANSFORMER SHAIFUL NIZAM MOHYAR
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
EXAMPLE A pole mounted 100kVA distribution transformer has the following characteristics R 1 = 1.56  R 2 =  X 1 = 4.66  X 2 =  Volts Ratio.
Utility Engineers, PC.  Generation  Transmission  Distribution.
See online explanation at AC Circuits.
1 The Transformer 1. 2 X XX X X B field into page L L No voltage on terminals.
Three Phase Motors Maths
Providing Service to High-rise Condominiums Presenter Charles L. Kahanek SWEDE Conference Horseshoe Bay, Texas May 2008.
Lecture 11Electro Mechanical System1 Delta-Delta Connection  Three single-phase transformers connected delta-delta  H 1 terminal of each transformer.
Electrical Engineering
Power Systems J. Sandberg July 2006 RHIC Retreat 2006.
Reliability Assessment of Power Infrastructure Kiran Deshmukh.
Load Transformers These are electromagnetic devices which can ‘step up’ or ‘step down’ ac voltages. A 240 volt supply can be converted to (for example)
1\ Backup system for solar on-grid installation 1 1pcs XTM inverter charger, nominal power 3.5KVA, 30min. Power 4KVA AC DC Load2 (secured power)
Protection of Power Systems
ELECTRICAL INSTRUMENTS ( service and utilization )
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
AUTOMATIC CIRCUIT RECLOSER
URBAN DESIGN Non-standard (Alternative) and Aesthetic Liafis A Ogboye, P.E.
Single Phase and three Phase Distribution Substation
DC Machine & Transformer
Current Transformer Testing
Lesson 25: Magnetism and Transformers
Chapter 18 Transformers.
ELEC 3105 Basic E&M and Power Engineering
PTS 3.3 C Portable Test System.
Electric Machine Transformers
Distribution Feeder Voltage Regulation and Control
ELE 2103 Dept . of E & E, MIT Manipal
Φ 3. Transformer Models. Turns ratio 7200:240 (30 : 1)
3-Phase Transformer Construction, Principal, Working, Operation Advantages Over 1-Phase Transformer Introduction Advatages Construction Principal Working.
Jhonny Di Girolamo P.E CenterPoint Energy
Review of Distribution Network Protection
EPRI Truck & Bus Meeting SAE Medium and Heavy Duty Vehicle
Isolation Link Operation
HP PRINTER ERROR 59.F0 Fix for HP Printer Error 59.F0 in USA | Hp support 247.
Presentation transcript:

1 Automatic Load Transfer – The Perfect Phantom Voltage SWEDE Conference Corpus Christi, TX May 3, 2006 Kenton M. Brannan, P.E. CenterPoint Energy - Distribution System Reliability

2 The Perfect Phantom Voltage Facilities –CenterPoint Energy –Everyone’s Internet (EV1) –Diagram Scenario of Events Verification & Short-Term Fix Root Cause Finding a Long-Term Solution Recommendation Closure

3 Facilities CenterPoint Energy –2–2500 kVA pad mounted transformers –35 kV–480/277 V, Grd–Wye/Grd–Wye –115’ 1/0 AL UDG cable from terminal poles –110’ # 2 AAAC OVH lateral Everyone’s Internet (EV1) –Data Center  Complete redundancy –Backup generators can support 100% facility load –3,000 A automatic transfer switch (each service) –Currently 2 services, 3 rd expected in 2006

4 Diagram of Facilities

5 Scenario of Events County maint. crew blew C-phase lateral fuse C-phase voltage went to 0.0 Volts Transfer switch rolled load to neutral position C-phase secondary voltage reappeared Adequate voltage detected, roll-back initiated C-phase voltage again went to 0.0 Volts Cycle continued every few seconds for 20 min. EV1 staff blocked roll-back

6 Verification & Short-Term Fix Test scheduled to verify voltage –All 3 fuses in place 284, 283, 284 V –C-phase lateral fuse removed 284, 284, 276 V –B-phase lateral fuse removed 284, 267, 284 V Short-Term Fix –10 minute roll-back block placed on each ATS

7 Test – All Fuses in Place

8 Test – C-phase Fuse Removed

9 Root Cause Contacted transformer manufacturer Discarded possibilities –Ferro resonance –Capacitive coupling C-phase voltage –100% load transfer –Result of vectoral sum of A & B-phase fluxes –Shifted by 180° due to nature of XFMR core –Flux induces voltage on C-phase at 240°

10 Finding a Long-Term Solution Continue with 10 minute block Replace the transformer –Delta-wye? Shift non-critical load from ATS to XFMR –How much load? Add a small load to XFMR –How much load? Future? Measure primary voltage 3-phase recloser on terminal pole –$50,000  $150,000 for all 3 services

11 Finding a Long-Term Solution Focus directed toward ATS IEEE task force for ATS Additional data acquired during test N/P sequence ratio: –All 3 fuses in place N/P – 0.4 % –C-phase lateral fuse removed N/P – 2.1 % –B-phase lateral fuse removed N/P – 6.4 %

12 Recommendation Recommendation – 47N Phase Sequence Relay –Installed at ATS controls –Set at 2.0 % (negative/positive sequence) Cummins installed relay Test of relay scheduled –Individual fuses removed –Activity of ATS monitored

13 Closure 47N relay prevented roll-back Determined successful EV1’s total installed cost –$6,000 (per ATS) –$18,000 for all 3 services Unique Situation –CenterPoint Energy –ATS controls manufacturer – Cummins