1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
State Waters and Stream Buffers
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Regulatory Context Natural Environment Chapter Tukwila Comprehensive Plan.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Alabama Best Management Practices for Forestry Alabama’s Best Management Practices for Forestry “… are voluntary guidelines to help maintain and protect.
Notices of Violation, Orders to Cease Operation and Consent Orders.
1 Stormwater Management Issued May 2009 Level II: Introduction to Design Education and Certification for Persons Involved in Land Disturbing Activities.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
Erosion is the process by which the land surface is worn away by the action of wind, water, ice, or gravity - it is the process where soil particles are.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Module 7: Construction Phase
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
1 Common Issues on Site Re-certification Training For Level IB Advanced Fundamentals Certified Inspector Issued May 2009.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Level IB: Advanced Fundamentals Seminar
Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
State Waters Determination and Stream Buffers
Erosion & Sediment Control. Wind Erosion Water Erosion.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
City of Clarksville Storm Water Management Manual Revisions 2014.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
For Storm Water Discharges Associated with Construction Activity
Supervisor, RIDEM RIPDES Permitting Program
Inspector Challenges.
SWPPP Basics.
Storm Water Pollution Prevention Plan Development
Land Use and Zoning Committee Special Workshop
Construction Management & Inspection
EPA Public Meeting Dallas, Texas May 10, 2005
Presentation transcript:

1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons Involved in Land Disturbing Activities

2 TOOLS TO USE Site Survey County Topo Maps USGS Survey Soil Survey Soils Investigation Wetlands Maps Phase I Investigation Recorded Plats FEMA Flood Maps Blue Book – GA Stormwater Manual Manual for Erosion and Sediment Control in GA

3

4 WHAT CAN BE DETERMINED FROM SOIL TYPES Available water capacity Depth to bed rock Depth to water table Drainage Erodibility Fertility Infiltration Percolation rate Permeability Slope Shrink-swell potential Susceptibility to flooding

5 PROJECT CONSTRUCTION ISSUES Project Location Required Predesign Site Visit Phasing Project Size Project Type Project Schedule

6 REQUIRED PREDESIGN SITE VISIT APPROVED RULE – Plan preparer/design professional must certify that a site visit by the plan preparer (or their designee) has been conducted prior to creation of the plan

7 SITE VISIT CERTIFICATION ON PLANS I certify under penalty of law that this plan was prepared after a site visit to the locations described herein by myself or my authorized agent, under my direct supervision. ____________________ Design Professional Date

8 SITE VISIT CHECKLIST THINGS TO LOOK FOR – Existing vegetation – specimen trees, etc. State waters potential US waters potential Flood plain Springs Soils conditions Topography Basin delineation/visual evaluation Offsite drainage Offsite/downstream conditions Wetlands Archaeological

9 STATE WATERS Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells and other bodies of surface or subsurface waters, natural or artificial, lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership or corporation (Ref. GESA)

10 NOT JUST STATE WATERS U.S. WATERS TOO……. 404 permits may be required (U.S. Clean Water Act) Feds noted that much confusion may exist related to utility and road construction Reference EPA letter (appendix)

11 STATE/US WATERS ISSUES While there may be some activities which are exempt from state regulation, the USACE recommends a developer (permittee) contact them if any amount of fill material may be placed in a water of the U.S.

12

13 U.S. WATERS GUIDELINE Projects impacting more than a 0.10 acre of wetlands or 300 feet of stream will likely require an individual Department of the Army Permit.

14

15 Minimum Requirements Stripping of vegetation, regrading and other development activities shall be conducted in such a manner so as to minimize erosion Cut and fill operations must be kept to a minimum Development plans must conform to topography and soil type, so as to create the lowest practicable erosion potential Whenever feasible, natural vegetation shall be retained, protected and supplemented (Ref. O.C.G.A )

16 Minimum Requirements Disturbed soil shall be stabilized as quickly as practicable Temporary vegetation or mulching shall be employed to protect exposed critical areas during development Permanent vegetation and structural erosion control measures must be installed as soon as practicable. Sediment in runoff water must be trapped by the use of debris basins, sediment basins, silt traps or similar measures until the disturbed area is stabilized Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping surfaces of fills (Ref. O.C.G.A )

17 Cuts and fills may not endanger adjoining property Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners Grading equipment must cross flowing streams by the means of bridges or culverts, except when such methods are not feasible, provided, in any case, that such crossings must be kept to a minimum (Ref. O.C.G.A ) Minimum Requirements

18 The disturbed area and duration of exposure to erosive elements shall be kept to a practicable minimum. Land disturbing activity plans for erosion and sedimentation control shall include provisions for control or treatment of any source of sediments and adequate sedimentation control facilities to retain sediments on site or preclude sedimentation of adjacent waters. (Ref. O.C.G.A ) Minimum Requirements

19 PLAN CONCEPTS Adapt the plan to resources available When possible, fit the project into the existing terrain Recommendations must be cost-effective The plan must be flexible Maintain open communication with developer, contractors and local issuing authority

20 PLAN CONCEPTS Notes and instructions must be clear and simple Timing and scheduling are very important Establish an effective maintenance program Identify critical offsite areas Monitor impacts

21 CONSTRUCTION SEQUENCING Plan sequence with contractor. Advise inspector/LIA of sequence at pre- construction meeting. Evaluate sequence during implementation. Make sequence revisions. Provide LIA/GA EPD/contractor documentation of revised design.

22 THREE PHASE CONSTRUCTION CLEARING PHASE (clearing & grubbing) GRADING PHASE (grading & temporary vegetation) FINAL PHASE (stormwater management & permanent vegetation)

23 PERHAPS THE MOST IMPORTANT STEP IS….. TO UNDERSTAND HOW A SITE ACCOMODATES RUNOFF IN PRE- DURING AND POST-CONSTRUCTION CONDITIONS.

24