© VESP International Pty Limited 2001-2005 To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
Requirements Specification and Management
HP Quality Center Overview.
PROGRAM AND PROJECT MANAGEMENT
The Engine Driving Business Management in Project Centric Environments MAGSOFT INTERNATIONAL LLC.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
2003 Indigo Technology, Inc. All Rights Reserved Integrated Process Teams Process Management Quality Assurance Configuration and Data Management Program.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Project Management Session 7
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems Introduction to Hewlett Packard (HP) Application Lifecycle Management.
Chapter 3: The Project Management Process Groups
Introduction to ARA’s Proposal Resources Don Cole
Configuration Management
Software Engineering Institute Capability Maturity Model (CMM)
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 1.1.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter 1 The Systems.
What is Business Analysis Planning & Monitoring?
Effective Methods for Software and Systems Integration
Project Management Process Overview
IT Project Management Cheng Li, Ph.D. August 2003.
PMP® Exam Preparation Course
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
The Engine Driving Purchasing Management in Complex Environments MAGSOFT INTERNATIONAL LLC.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Resources Performance time. resources Performance time 2.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
What is Oracle Hyperion Planning  Centralized, web- based Budgeting and Planning application  Combines Operational and Financial measures to improve.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
FPGA-Based System Design: Chapter 6 Copyright  2004 Prentice Hall PTR Topics n Design methodologies.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Strategically Managing the HRM Function McGraw-Hill/Irwin ©2012 The McGraw-Hill Companies, All Rights Reserved.
Computers Are Your Future Tenth Edition Chapter 13: Systems Analysis & Design Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Develop Project Charter
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Microsoft Project User Group May 2002 – Chapter Meeting Scheduling - Best Practices Initiation and Planning Presented by James Nuthall Brentford Technologies,
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Requirement Engineering. Recap Elaboration Behavioral Modeling State Diagram Sequence Diagram Negotiation.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Operational and Postimplementation
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Advanced Project Management Project Planning Phase Ghazala Amin.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
RUP RATIONAL UNIFIED PROCESS Behnam Akbari 06 Oct
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
Prepared by: Session ID: PeopleSoft Procurement Contracts Madeline Osit COO Beacon Application Services
Project Management PTM721S
Chapter 11: Software Configuration Management
TechStambha PMP Certification Training
INTEGRATING THE SUPPLY CHAIN TO REAP THE REWARDS
Chapter 3 Managing the Information Systems Project
Operational and Postimplementation
Tools of Software Development
Product Development Scenario Overview
Chapter 11: Software Configuration Management
Introduction to Systems Analysis and Design Stefano Moshi Memorial University College System Analysis & Design BIT
Presentation transcript:

© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview © VESP International Pty Limited This document is copyright to VESP International Pty Limited. No part of it may be reproduced, stored in a retrieval system, recorded or transmitted in any form or by any means, whether electronic, mechanical, optical or otherwise without the express prior written consent of VESP International Pty Ltd. All rights reserved.

© VESP International Pty Limited To Contents Slide 2 An Integrated Management Planning Tool for Task (WBS) Based Control of Proposals & Projects IMP is a VESP Developed Data Base Tool that links key planning systems to the Project Structure often referred to as the Work Break- down Structure (WBS). It was originally developed to enforce a disciplined approach to estimating. It has evolved to be used for Integrated Work Planning once contracts are awarded. Used by trained consultants to support estimates, proposals and in recovery when time is critical. Being developed as a commercial product in response to requests from our regular clients. The System has been developed for application over the full project cycle from proposal to sell-off LESSONS LEARNT BID NEGOTIATE IMPLEMENT Manual Advance

© VESP International Pty Limited To Contents Slide 3 Proposal Structure/WBS VESP Database Standard Database Customer Project Development Teaming Partners Selected Tender Tailored to Reflect Marketing Inputs Pricing Module Proposal Documents Merging of customer & company needs during proposal development is done by matrix of various task structures from differing sources/ entities Estimating Module (s) Subcontractor Inputs Manufacturing Module (ERP) Company Standard Task Structure RFT Structure / WBS Manual Advance A balancing Act between Suppliers need for consistent structure & associated metrics vs a different customer structure for their process/ metrics and establishing equivalence in tendered proposals

© VESP International Pty Limited To Contents Slide 4 Interfaces Between IMP & Company Systems FINANCE SYSTEMS Integrated Master Planner SCHEDULING TOOLS (Open Plan/ MS Project) STATUS REPORTS OUTPUTS AT EACH MANAGEMENT LEVEL INTEGRATED TIME & COST REPORTS WORK FLOW DESCRIPTIONS OUTPUTS IMPORT/EXPORT FROM STANDARD APPLICATIONS (EXCEL/ACCESS ) RELATED DATABASES PRICING SYSTEMSBUDGET REPORTS STAFF WORK LOAD CURVES EXECUTIVE TASKING & ANALYSIS SKILLS DATA BASE WEEKLY STATUSING SYSTEMS Ensure consistency of planning and control systems based on Task/WBS and work flow which supports related statusing and analysis Manual Advance

© VESP International Pty Limited To Contents Slide 5 (3) Supporting Schedule & Other Outputs IMP Supports Linked Reports from Multiple Projects & Task Managers SCOPE ETC (2) SCOPE ETC (2) Task Manager Reports MANAGERBUDGET WORK TASK DESCRIPTION BUDGET ACTUALSFORECAST TO COMPLETE RELATED WBS TASKS: (3) RELATED SCHEDULES LINKED VIA WBS (1) Project Manager Summary Report Regular IMP Statusing at the task level simplifies the building of Executive & Customer Reports Manual Advance

© VESP International Pty Limited To Contents Slide 6 Task Analysis Screen Leads Estimators through the Planning Process Manual Advance

© VESP International Pty Limited To Contents Slide 7 Manual Advance

© VESP International Pty Limited To Contents Slide 8 Graphical Reports Standard/ Configurable/ Customer Specified Customer can specify graphs needed for analysis & reporting. Easily configured from selectable attributes. Become reports by selecting template header/ footer & entering title. Selection of data in left column auto generates the graph data set & the legend on each graph. Manual Advance

© VESP International Pty Limited To Contents Slide 9 Key Features of IMP Intended for use with minimal training. Select from IMP modules or external interfaces to existing tools cf with Pricing, CSCS and Scheduling Tools Network & Lap-top versions Draws on lessons learnt database Proven fast and effective Data Capture demonstrated to improve by 40% Reduces work load on domain specialists so they concentrate on that domain. Functionality Matrix is used to Tailor IMP to your needs Covers most client needs in areas such as engineering, logistics, commercial, proposals, project management and executive review Manual Advance

© VESP International Pty Limited To Contents Slide 10 Executive Benefits Imposes a consistent methodology for all estimating effort. Proposal Team legacy is documented and thorough against each WBS. Allows a smooth transition into Implementation via negotiation. Provides consistent review mechanisms. Allows executive (re) direction to be quickly incorporated while retaining an integrated output across linked tool systems. This is critical in closing stages/ corporate review of proposal & also in negotiations. Integrates disciplines across the company to create a consistent picture. Efficiency of data capture minimises specialist effort on estimating. Allows for creation of bid and implementation comparisons, full cycle evaluation of how we bid vs achieved. Allows staff availability to be reviewed in task assessment phase Integrate with skills data base allows domain knowledge to be considered before assignment Allows performance to be tracked against set objectives. Allows Project lead to do what-if analysis then roll-up of final status & planning Allows executive level analysis & statusing over multiple programs Baselines all changes, when, why, by how much under whose authority. Secure access to data based on staff role & authority Manual Advance