The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.

Slides:



Advertisements
Similar presentations
DROUGHT MONITORING CENTRE - NAIROBI WHAT COULD BE DONE ON DROUGHT WITHIN ISDR PLATFORM?
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Configuration Management
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Identify Problems, Planning Objectives and Constraints.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Environmental Project Commitments The Alberta Experience
PROPONENT INVOLVEMENT IN CONSULTATION Presentation to the Geology Matters Community Engagement Workshop October 30, 2012 Consultation with the Mi’kmaq.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Fundamentals of IRB Review. Regulatory Role of the IRB Authority to approve, require modifications in (to secure approval), or disapprove all research.
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
USAID Africa Bureau EIA Procedures for Sub-Projects
Recommendations to Inform Development of a Climate Change Adaptation Strategy for the Lake Watershed Climate Change Adaptation Strategy for the Lake Simcoe.
U.S. Fish and Wildlife Service Ecological Services Utah Field Office.
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
EMS Auditing Definitions
Find 8 scholarly articles related to your dependent variable and target population. How does the literature theoretically define your dependent variable?
Compensation Easement with the Municipality as a partner.
Add your Logo in the slide master menu Module IMPLICATIONS WP8- SERVICES WP9-SOCIOECON WP10-VALUATION.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Purpose of the Standards
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Integrated thematic assessments: outlook on water, data and.
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Health promotion and health education programs. Assumptions of Health Promotion Relationship between Health education& Promotion Definition of Program.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Implementing State Health Reform: Lessons for Policymakers Webinar for State Officials April 8, 2010.
The Federal Resource Management and Ecosystem Services Guidebook Federal Resource Management and Ecosystem Services Guidebook nespguidebook.com ASSESSMENT.
Basic Concepts for Assessing Environmental Impacts.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Module 2 Stakeholder analysis. What’s in Module 2  Why do stakeholder analysis ?  Identifying the stakeholders  Assessing stakeholders importance and.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Managing the Natura 2000 network: state of play, challenges and opportunities.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
Sustainable Dairying: Water Accord The Sustainable Dairying: Water Accord (the Accord) has been developed under the oversight of the Dairy Environment.
Crisis in Shrewsbury Flooding impacts and risk management.
Lecture(9) Instructor : Dr. Abed Al-Majed Nassar
Canada’s Federal Environmental Assessment Regime Presentation to the Forum of Federations Environmental Assessment Conference Ottawa, Canada September.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information How to Develop Land Use Information.
Mitigation and Impact management
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Muston planning for Bath & North East Somerset Council 3 June 2015 Councillor Training – Planning Mike Muston – Muston Planning.
FOR MANAGING BIODIVERSITY AND SPECIAL PLACES
1 Integrating Biodiversity Conservation Into Impact Assessment: The Experience of Uganda BERINA UWIMBABAZI.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
RESERVE DETERMINATION STUDIES FOR SELECTED SURFACE WATER, GROUNDWATER, ESTUARIES AND WETLANDS IN THE GOURITZ WMA – PSC MEETING NO 1 OVERVIEW OF THE RESERVE.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
GBLWMP-SLUP Integration February 5, 2010 Deline. Ecological Integrity Policy GBLWMPSLUP (a): All activities in the GBLW must be consistent with.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Environmental Impact Assessment EIA (Topic 2). BAM BAM BAM BAM BAM BAM Three elements 1. Baseline data 2. Assessment of impacts 3. Monitoring changes.
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
EIA approval process, Management plan and Monitoring
Infrastructure planning and management
Severn Tidal Power Feasibility Study
Strategic Environmental Assessment (SEA)
A Blueprint to safeguard Europe’s waters
Presentation transcript:

The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013

2 What do we mean by Baseline Data?  Refers to information pertaining to biophysical, social and economic aspects of a project area.  The Project Area is the extent of area where the project may have an effect during construction and operation. This is land, air, water (surface and ground) and all the things that are contained within them, including people.  These data are pieces that are fit together to give a fulsome description of the environment in which the project will be undertaken.

3 Why do we collect Baseline Data?  There are two main purposes to collecting baseline data: 1. To provide a description of the current status and discernable trends of environmental factors (e.g., air quality) against which predicted changes can be compared and evaluated in terms of importance. The data should provide a statistically valid measure of any given parameter’s natural variability (as opposed to project induced change) in order to be of value for impact prediction and environmental monitoring. 2. To provide a means of detecting actual change by monitoring once a project has been initiated.

4 Data Gathering  Baseline data are collected in a number of different ways, some of which depend upon the project type and setting.  One typical data source is from third parties (eg. DNR, NSE, ACCDC) through an open request for information maintained in their internal databases for the project area (eg. moose survey, fish habitat).  A more “first hand” approach is to talk to local people in the project area. This can be done several ways such as formal public consultation, community liaison committees, targeted stakeholder and First Nations information exchange, among others.  Field data are also collected.

5 Data Gathering continued  Another important aspect of data gathering is to ensure sufficient time for adequate study  Many environmental components have to be studied over an extended time frame, for example birds typically need to be studied over four seasons  Often the proponent has not thought about this requirement and will find this difficult to accommodate within their proposed schedule

6 Why Collect These Data?  Depending on the type of Assessment underway, a formal Terms of Reference (TOR) may have been developed by a regulatory agency or by the client.  The TOR usually outline the expectations of the agency and therefore, guide the data collection efforts.  It is important to remember that only data that are relevant to the EIA should be collected. This is the point where it is key to check that everyone on the team understands the purpose of this effort.  Always start with the end in mind.

7 Another good reason to collect data….  There may be legal challenges associated with a project. These legal challenges may occur once a project is underway.  A legal challenge is often related to how a project has changed a particular aspect of the environment (eg., water quality or quantity). Compensation may be sought as a result of a project.  Appropriate baseline data collection can be a good insurance policy for both the project proponent and anyone who may be affected by the project.

8 Project Examples  Brine Line (PotashCorp)  Project consisted of an approximately 30 km pipeline in a new Right-of-Way.  Project constraints included multiple watercourse and wetland crossings and a water supply area  Before beginning the project the proponent was made aware that there would be a requirement to conduct five years of post construction monitoring on the wetland crossings at a minimum.  Knowing the requirement for post-construction monitoring allowed the proponent to plan for required follow on funding as well as allowing time for proper baseline data collection.

9

10 Petitcodiac River Project  This project is more of a restoration project and is not a typical EIA. As a result, the baseline data collection is different.  The Causeway was constructed between Moncton and Riverview, NB to provide a transportation link between these communities and to protect upstream from flooding.  Construction began in 1966 and was completed in  Construct fishway in accordance with legislation

11 Project Options  EIA looked at 4 options: 1. Replacing the fishway 2. Gates open during peak migration 3. Gates open permanently 4. Replace part of the Causeway with a bridge  The status quo or existing condition was chosen as the baseline condition against which the options were to be evaluated.

12 EIA Conclusion  Fish Passage and other ecosystem issues worsen under Status Quo  Project Options 3 and 4 improve fish passage and other ecosystem issues  Environmental Effects of Project Options 3 and 4 are not significant or net positive  Options 1 and 2 do not meet the project objective of restoring unimpeded fish passage up and downstream

13 Status Quo Condition Moncton Causeway Riverview

14 EIA Decision and Next Steps  The EIA concluded that Project Options 3 and 4 would work  Gates have been open year round since April 2010  Need to understand impact of new condition  More Baseline Data collection  More monitoring

15 Current Situation

16 The Tidal Bore

17 Questions?