Chapter 27 Additional Analysis Methods. Objectives Use various tools and techniques to compare current and future states in terms of pre defined metrics.

Slides:



Advertisements
Similar presentations
Seven Quality Tools The Seven Tools
Advertisements

IE673Session 5 - Process Management1 Process Management.
Problem Solving. Objective of Problem Solving OODA Loop Problem Solving Process – Types of “problems” – 8 StepsOverview.
ISHIKAWA DIAGRAM – Tool for quality management Marit Laos IS Project Management
Business Operating System
Chapter 8: Quality Management Project Quality Management
Management Quality Tools
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
2010 AHCA/NCAL QUALITY SYMPOSIUM BALTIMORE, MARYLAND
QUICKSTART Pareto Chart. Pareto Chart Understand what the Pareto law is Understand what a Pareto diagram is Provide Pareto analysis by level Provide examples.
20% 80% Pareto Analysis.
7-1 Chapter 7 Creating Ideas © David O’Sullivan. 7-2 Reflections  Describe the creativity process  Understand the various sources of ideas used in innovation.
Tools To Make Waste Visible. 2 FOR INTERNAL USE ONLY Module Objectives By the end of this module, the participant should be able to:  Develop a Spaghetti.
Overview of Total Quality Tools
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
Quality Function Deployment
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
2 Breakout Session # 205 Tim Ortel, CPCM, Intuitive Surgical Date 15 April 2008 Time 2:10 PM – 3:10 PM Can Contracting Be “Leaned”?
Lean Production (MUDA)
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
MTAT Business Process Management (BPM) Lecture 6 Qualitative Process Analysis Marlon Dumas marlon.dumas ät ut. ee.
Chapter 16 Problem Solving and Decision Making. Objectives After reading the chapter and reviewing the materials presented the students will be able to:
Problem Solving.
Peningkatan Skill dan Problem-solving Kuliah ke 5 - SFM.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
Problem Solving.
9. Applying scientific tools & techniques for improving customer satisfaction.
Process Characteristics
Pareto Principle “The Vital Few and Trivial Many Rule” “Predictable Imbalance” “80:20 Rule”
Total Quality Management. What is Quality? Quality is a relative concept. Quality is in the eye of the beholder Perfection Doing it right at the first.
FishboneFishbone Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training Six Sigma Simplicity.
QI Tools to Diagnose HPV Vaccine Delivery Concerns in Your Practice
Root Cause Analysis Analyze Kaizen Facilitation. Objectives Learn and be able to apply a fishbone diagram Utilize “Why” analysis technique to uncover.
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
Chapter 5 Value Stream Mapping. IT-465 Lean Manufacturing2 What is VSM? It is a method of creating a “one page picture” of all of the processes that occur.
Operations Management
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
TI 2111 Work System Design and Ergonomics 2. Problem Solving Tools.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
Determining the Root Cause and Corrective Action of a Problem World Class Solutions for Global Applications Riverhawk.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Six Sigma Greenbelt Training
Balanced Scorecard: Quality, Time, and the Theory of Constraints
Participant and Leader Training
Problem Solving Sheet Guidelines
IENG 451 / 452 Data Collection: 7 Tools of Ishikawa
Riverhawk World Class Solutions for Global Applications
Problem Solving Updated Jun 2016.
Dr. Iphov Kumala Sriwana, ST., M.Si
“Find MUDA in Gemba” Exercise
Pareto Charts Summary Process Steps
The Certified Quality Process Analyst Handbook 1st edition Chapter 9: Basic Quality Tools 2nd edition Chapter 3: Quality Tools Presented by Dr. Joan.
Ideas and skills not used Movement of people or material
A STRATEGY FOR PERFORMANCE EXCELLENCE
The Certified Quality Process Analyst Handbook 1st edition Chapter 9: Basic Quality Tools 2nd edition Chapter 3: Quality Tools Presented by Dr. Joan.
Introduction to the Use of Classic Quality Tools
Riverhawk World Class Solutions for Global Applications
Statistical Quality & Process Control
Problem Solving.
The 7 Basic Quality Tools ~ The DMAIC Process
Measure Phase Wrap Up and Action Items
A STRATEGY FOR PERFORMANCE EXCELLENCE
Smitty’s Super Speed Drill for Memorization 8 Forms of Waste
Pareto Charts Summary Process Steps
Presentation transcript:

Chapter 27 Additional Analysis Methods

Objectives Use various tools and techniques to compare current and future states in terms of pre defined metrics. Root cause analysis, issues, and tools for resolving problems. Analyze forms of waste (waste analysis).

GAP Analysis A gap analysis is a tool used to identify a performance difference between a current state and a desired future state. Gap analysis are performed at multiple levels: 1. Business level: A business may compare its performance to its competitors or the general industry. Gaps at the business level are usually financial. 2. Process Level: The current processes may be compared with the cost, cycle time, and quality of other processes to remain competitive. 3. Product Level: Gaps at this level are in features, capability, cost, and quality.

Root Cause Analysis Solving a problem means identifying the root cause and eliminating it. 5 Whys: 1. Why did this occur? 2. Why did it occur? … See example 27.1 on page 284.

Cause and Effect Diagram A cause and effect diagram (fishbone diagram) divides causes into several categories (fig 27.2, page 286). A brainstorming session usually helps identify potential causes, and sub causes. The participants should include people with a working knowledge of the process as well as subject matter experts.

Pareto Chart A Pareto chart (fig 27.3, page 286) is an excellent tool for seeking out and prioritizing root causes. The y axis identifies the number of defects and is associated with the bar height. The x axis identifies the defect type. The purpose of the Pareto chart is to identify the vital few from the trivial many in what is called the 80/20 rule. The first 2 bars represent 80% of the defects, and the remaining 20% is spread over the rest.

Fault Tree Analysis A fault tree analysis helps the user consider underlying causes for a failure mode and study the relationships between various failures (fig 27.6, page 290).

Waste Analysis The National Institute of Standards and Technology (NIST) identifies 8 sources of waste: 1. Overproduction: producing sooner than is needed. 2. Inventory: excessive supply of parts or materials. 3. Defects: additional material, labor, and time to fix problem. 4. Processing: efforts that do not add value. 5. Waiting: for equipment, instructions, or material does not add value. 6. Motion: movement of persons that does not add value. 7. Transportation: movement of parts due to poor layout. 8. People: failing to make use of ideas and creativity to make continuous improvement.

Summary A gap analysis is a tool used to identify a performance difference between a current state and a desired future state. Solving a problem means identifying the root cause and eliminating it. A cause and effect diagram (fishbone diagram) divides causes into several categories. The purpose of the Pareto chart is to identify the vital few from the trivial many in what is called the 80/20 rule. A fault tree analysis helps the user consider underlying causes for a failure mode and study the relationships between various failures. The National Institute of Standards and Technology (NIST) identifies 8 sources of waste.

Home Work 1. What is a gap analysis? 2. Explain 3 types of gap analysis. 3. What is root cause analysis? 4. What does cause and effect diagram do and what is another name for it? 5. What is the purpose of a Pareto chart? 6. Explain 8 sources of waste.