Feasibility Analysis By: Professor Wilmer Arellano.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

PROJECT RISK MANAGEMENT
CSIS 3600 Systems Analysis and Design
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Chapter 6 Initiating and Planning Systems Development Projects 6.1.
Project Estimation Describe project scope, alternatives, feasibility.
IS 425 Enterprise Information I LECTURE 9 Autumn  2004 Norma Sutcliffe.
Modern Systems Analysis and Design Third Edition
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Chapter 8 Risk Analysis Management of Computer System Performance.
The Analyst as a Project Manager
Feasibility By Garrett Jones and Ryan Butler. All projects are feasible given unlimited resources and infinite time. Unfortunately, most projects must.
贾银山 Software Engineering, Chapter 5 Slide 1 Project management.
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 5 Slide 1 Chapter 5 Project Management Modified by Randy K. Smith.
Initiating and Planning Systems Development projects
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Project management DeSiaMore 1.
Chapter 25 Risk Management
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Software Project Management Lecture # 8. Outline Earned Value Analysis (Chapter 24) Topics from Chapter 25.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
Software Engineering Risk Management. Understanding Risks Risks involve :  Uncertainty – there are no 100% probable risks  Loss – if the risk becomes.
Management & Development of Complex Projects Course Code MS Project Management Risk Management Framework Lecture # 22.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Lecture 3 Managing the Development Project SFDV Principles of Information Systems.
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
What is it? A risk is a potential problem — it might happen, it might not. But, regardless of the outcome, it’s a really good idea to identify it. Assess.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
COOP Seminar – Fall 2008 Slide 1 HOUSTON COMMUNITY COLLEGE SYSTEM SAIGONTECH SAIGON INSTITUTE OF TECHNOLOGY Software Project Management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
SYSTEM ANALYSIS.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
12/10/15.  It is a Cross Life Cycle Activity (CLCA) that may be performed at any stage ◦ In fact, some part of it (e.g. risk analysis and management)
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 16/25/2015 V2.
Software Engineering B.Tech IT/II Sem-II Term: Unit-7 PPT SLIDES Text Books:1.Software Engineering, A practitioner’s approach Roger s. Pressman.
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Software Engineering Lecture 6: Risk Analysis & Management.
Feasibility Analysis By: Professor Wilmer Arellano.
Feasibility Analysis By: Professor Wilmer Arellano.
Software Project Management Lecture # 9. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management 1/30/2016ICS 413 – Software Engineering1.
The Feasibility Study The objective of a feasibility study is to find out if an project can be done and if so, how The objective of a feasibility study.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 6 Initiating.
Project management (2) By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
Project management Chapter 5. Objectives To explain the main tasks undertaken by project managers To introduce software project management and to describe.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Systems Analysis and Design in a Changing World, 4th Edition
Modern Systems Analysis and Design Third Edition
Chapter 6 Initiating and Planning Systems Development Projects
17. Managing GIS © John Wiley & Sons Ltd.
By: Professor Wilmer Arellano
Software Engineering B.Tech Ii csE Sem-II
Martha Grabowski LeMoyne College
Project Feasibility CIS 255.
Introduction to Projects
Lecture 6 Initiating and Planning Systems Development Projects
Lecture 7: the Feasibility Study
Chapter 25 Risk Management
Modern Systems Analysis and Design Third Edition
Chapter 6 Initiating and Planning Systems Development Projects
Presentation transcript:

Feasibility Analysis By: Professor Wilmer Arellano

My experience is that there exists a general psychological tendency to overlook "predictable surprises" as things that happen in the normal course. "Prevention is better than cure" is hardly practiced and it is only when a surprise boils into a crisis that managers react. Hariharan Controller Perstorp Aegis Chemicals Pvt Ltd.

Overview Feasibility Definitions Goals Types of Feasibility Feasibility Assessment 1 to 5 Score Weighted Score Pugh’s Method Risk

What are we covering today?

Definitions for Feasibility The quality of being doable WordNet® 2.1, © 2005 Princeton University A feasibility study is: a detailed analysis of a company and its operations that is conducted in order to predict the results of a specific future course of action.

Goals Will the project be a success? The objective of a feasibility study is: To find out if a project can be done:

Types of Feasibility Technical Resource Economic Schedule Operational Cultural Legal Marketing

Technical Feasibility Is the project possible with current technology? Does the technology exist at all? Is it available locally? Can it be obtained? Are fundamentally new inventions required? How much Technical Risk is there?

Resource Feasibility Do we have sufficient skills? Do we have sufficient equipment? Do we have sufficient number of people? How much Resource Risk is there?

Economic Feasibility Is the project possible, given resource constraints? Do we have the funds? Do we have a sponsor? How much Economic Risk is there?

Next two optional No need to include in your proposal

Economic Feasibility Is the project possible, given resource constraints? What benefits will result from the system? Both tangible and intangible benefits Quantify them! What are the development and operational costs? Are the benefits worth the costs? How much Economic Risk is there?

Economic Feasibility Tangible Benefits Readily quantified as $ values, examples: decreased costs increased sales error reductions increased throughput/efficiency increased margin on sales more effective use of staff time Intangible benefits Difficult to quantify, but maybe more important, examples: improved staff morale increased flexibility of operation higher quality products/services better customer relations

Schedule Feasibility What are the chances of meeting the intermediate mileposts? What are the chances of meeting the PDR (Preliminary Design Review) requirements? What are the chances of meeting the CDR (Critical Design Review) requirements?

Feasibility Analysis The PDR is a multi-disciplined technical review to ensure that the system under review can proceed into detailed design, and can meet the stated performance requirements within cost (program budget), schedule (program schedule), risk, and other system constraints. The CDR is a multi-disciplined technical review to ensure that the system under review can proceed into system fabrication, demonstration, and test; and can meet the stated performance requirements within cost (program budget), schedule (program schedule), risk, and other system constraints. R &Exp=Y

Cultural Feasibility Social acceptability? Will there be a positive impact on the local culture.

Cultural Feasibility For the purpose of your proposal: Include questions on Cultural Feasibility on your survey

Cultural Feasibility Part of your findings will go in the feasibility section Use your new knowledge and include a Cultural Feasibility item in your Feasibility Analysis.

Cultural Feasibility Part of your findings will go in a different section. Use your new knowledge to write a strong and persuasive social impact section.

Legal Feasibility Organizational conflicts and policies? Laws or regulations impeding the Project? Laws of regulation limiting the project

Legal Feasibility For the purpose of your proposal: Do a search to find out laws or rules that may oppose or limit your project Include a Legal Feasibility item in your analysis in your Feasibility section

Marketing Feasibility Will the general public accept the product?

Marketing Feasibility

Include questions on Marketing Feasibility on your survey Use the information provided by the users on the survey and add a Marketing Feasibility item in your feasibility assessment table. Write a separate section of your proposal about Marketability. Provide strong arguments of your project Marketability

Next slide is optional No need to include in your proposal

Operational Feasibility Urgency of the problem and the acceptability of any solution: If the system is developed, will it be used? Potential labor objections? Manager resistance?

Feasibility Assessment Feasibility is Measured Against Attributes Pugh’s Method. All attributes has the same weight. Count + vs. – 1 to 5 Scale. By using a scale we can obtain information of the possible causes for failure Weighted Scale. Same as 1 to 5 scale the different attributes contribute to the total in different proportion. (The one we use)

Pugh’s Method Example For reference only, do not use.

1 to 5 Scale Example For reference only, do not use.

Weighted Scale Example This is not a template, use your own attributes. Use this method.

Fit your table in one page It looks better

Obtaining Weights Example 1

Weighted Scale Example 1 This is not a template, use your own attributes

Obtaining Weights Example 2

Weighted Scale Example 2 This is not a template, use your own attributes

Follow your Analysis Trust yourself!

Remember You must include all the feasibility items, not just the ones in my examples

Remember Use your own attributes, do not copy and paste from the slides

Risk The possibility of suffering loss Risk involves uncertainty and loss: Uncertainty: The degree of certainty about whether the risk will happen. Loss: If the risk becomes a reality, unwanted consequences or losses will occur.

Risk Categories Technical Resource Economic Schedule Cultural Legal Marketing Operational

Proactive Risk Management “The purpose of risk management is to identify potential problems before they occur so that action can be taken to reduce or eliminate the likelihood and/or impact of these problems should they occur.”

Risk Assessment Risk Exposure Matrix Clear and well defined risk acceptance thresholds are required in order to define the level of risk that can be tolerated. The Exposure Matrix can be used to prevent entering into a project You may use a fishbone diagram to discover risks

Risk Management In ongoing projects, the Exposure Matrix can be used to as a managing tool Class I: Risks that are below the risk acceptance threshold and do not require active management Class II: Risks that lie on the risk acceptance threshold and require active monitoring Class III: Risks that exceed the risk acceptance threshold and require proactive management Class IV: Risks that significantly exceed the risk acceptance threshold and urgent and immediate attention if they happen

Avoid Class IV Risks! They Can make you: Unsuccessful Unhappy

Fault Tree Analysis

What you need to do Use a fault tree analysis to determine your risks. Use a Risk Exposure Matrix to asses your risks Create contingency plans Write the corresponding section on the proposal

Continuous Risk Management

References feasibility.pdf Dorofee, A. J., Walker, J. A., Alberts, C. J., Higuera, R. P., Murray, T. J., and Williams, R. J. Continuous Risk Management Guidebook. Pressman, R. S Software Engineering: A Practitioner’s Approach. New York, USA: McGraw Hill. Risk analysis and management guidance June 2005,

Review Definitions Goals Types of feasibility Feasibility Assessment 1 to 5 Score Weighted Score Pugh’s Method Risk

& & Q uestions A nswers