Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.

Slides:



Advertisements
Similar presentations
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Advertisements

Welcome Interstate I-66 / Route 28 Preliminary Study Stakeholder Workshop May 29, 2012.
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
West Contra Costa Unified School District
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Corridor #5 Update United States Senate Briefing September 26, 2007.
1 HACIA NETWORKING EVENT Jose Rios, P.E.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
Management and Operations In MPO Planning Christopher O’Neill.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
PORT OF MIAMI TUNNEL PROJECT 1 FDOT& MAT Presentation FDOT & MAT Presentation.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
May 13 th, 2014 Portage County, Ohio Tallmadge Road Corridor and Interchange Improvement Project.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Poplar Street Bridge City Arch River Consultant Presentation December 16, 2011 Room 160, St. Louis District Office.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
I-394 MnPASS Technical Evaluation Preliminary Findings March 23, 2006 Doug Sallman – Cambridge Systematics, Inc.
I-394 MnPASS Technical Evaluation Doug Sallman – Cambridge Systematics, Inc.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Southern Bridge Project Brown County Executive
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
1 Destination 2030 Kern Regional Transportation Needs * Information provided by Kern Council of Governments.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT Transportation Committee Meeting January 27, 2012.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
Transportation Committee Update 10/13/2015. Transportation Committee Members Roads Subcommittee Bill Wanatosky Benson King Anthony Watkins Helene Rosenheim.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
PORT IMPROVEMENT PROJECTS AT SAN LUIS/SAN LUIS RIO COLORADO CONGRESSIONAL BORDER BRIEFING PHOENIX, ARIZONA NOVEMBER 3, 2015 A Key Gateway for Trade, Tourism.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Visit Our Website at: Click to edit Master title style.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
New Brunswick / Maine Border Crossings Trans Border Working Group June 11, 2003 Burlington, VT.
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
The I-465 West Leg Reconstruction Project
Downtown Valdosta Truck Traffic Mitigation Study
TVTC Impact Fee Update Nexus Study January 30, 2008
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Highway 14 – Owatonna to Dodge Center District 6 Update
Tampa Bay Regional Strategic Freight Plan
FM 518 By-pass Traffic Review
Downtown Valdosta Truck Traffic Mitigation Study
Problem 5: Interstate 87 Interchange
STATE SUEE AND ONE WAY CORRIDORS
Southern Bridge Project Brown County Executive
FREEWAY MANAGEMENT SYSTEMS:
I Street Bridge Replacement Project
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004

Page History  Identified as a need in late 1969 to early 1970  Design Public Hearing held June 1990  EIS approved November 1992  $350M in road construction began in July 1997  Identified as a need in late 1969 to early 1970  Design Public Hearing held June 1990  EIS approved November 1992  $350M in road construction began in July 1997

Page History  Phase 1 - West of Interstate 270 to Route 94 (four lanes each direction with an auxiliary lane) is complete  Phase 2 - Route 94 from east of Harvester to Route N. This project is not funded.  Phase 3 - Rte. 94 at Rte. N to Route 40/61 (three lanes each direction). This project is not funded.  Phase 1 - West of Interstate 270 to Route 94 (four lanes each direction with an auxiliary lane) is complete  Phase 2 - Route 94 from east of Harvester to Route N. This project is not funded.  Phase 3 - Rte. 94 at Rte. N to Route 40/61 (three lanes each direction). This project is not funded.

What Is The Goal Of Constructing Page Ave.? Provide immediate relief to traffic on US 40, I-70, and MO 370 by carrying about 60,000 vehicles per day at opening and 120,000 by 2020.

Has It worked? We have reason to celebrate!!!  At the one year anniversary, Page Ave. is carrying nearly 50,000 (AADT), and 54,000 (AAWDT)  Page Avenue, MO 364, is functioning as a congestion reliever for other routes between St. Louis and St. Charles Counties We have reason to celebrate!!!  At the one year anniversary, Page Ave. is carrying nearly 50,000 (AADT), and 54,000 (AAWDT)  Page Avenue, MO 364, is functioning as a congestion reliever for other routes between St. Louis and St. Charles Counties

March To November Growth  We’ve seen a 38% increase in volumes on MO 364 from March 2004 to November 2004  Morning and evening rush periods carry about 40% of the total traffic on MO 364  Traffic patterns are still settling  We expect some additional increase in traffic over a short period of time  We’ve seen a 38% increase in volumes on MO 364 from March 2004 to November 2004  Morning and evening rush periods carry about 40% of the total traffic on MO 364  Traffic patterns are still settling  We expect some additional increase in traffic over a short period of time

Route Fall 2003 (near the Missouri River) Fall 2004 (near the Missouri River) Decrease (%) I , ,079 21,694 (12%) Rte ,907 56,782 3,125 (5%) Rte ,183 77,523 7,660 (9%) Rte , Total Traffic Volumes

Total River Crossing Volume  Total river crossings have increase by about 17,500 vehicles per day  Trips being easier to make  Trips are shorter for many people

Rush Hour Traffic Decreases  A 26% decrease from 6-8 am on I- 70 (4600 vehicle decrease)  A 23% decrease from 4-6 pm on MO 370 (2000 vehicle decrease)  A 14% decrease from 6-8 am on MO 370 (1100 vehicle decrease)  A 26% decrease from 6-8 am on I- 70 (4600 vehicle decrease)  A 23% decrease from 4-6 pm on MO 370 (2000 vehicle decrease)  A 14% decrease from 6-8 am on MO 370 (1100 vehicle decrease)

Rush Hour Traffic Decreases  A 41% decrease in traffic on the ramp from EB 40 to NB 270 from 6-8 am (1300 vehicle decrease)  A 50% decrease in traffic on the ramp from EB I-70 to SB I-270 from 6-8 am (3400 vehicle decrease)  A 15% decrease in the traffic on the ramp from NB I-270 to WB I-70 from 4-6 pm (600 vehicle decrease)  A 41% decrease in traffic on the ramp from EB 40 to NB 270 from 6-8 am (1300 vehicle decrease)  A 50% decrease in traffic on the ramp from EB I-70 to SB I-270 from 6-8 am (3400 vehicle decrease)  A 15% decrease in the traffic on the ramp from NB I-270 to WB I-70 from 4-6 pm (600 vehicle decrease)

Are There Still Congestion Points?  A 276% increase in traffic on the ramp from NB I-270 to WB Page, carrying over 3000 vehicles, between 4-6 pm  A 292% increase in traffic on the ramp from EB MO 364 to SB I-270, carrying over 3600 vehicles, between 6-8 am  Traffic has also increased at MO 94 and Harvester in the rush periods  A 276% increase in traffic on the ramp from NB I-270 to WB Page, carrying over 3000 vehicles, between 4-6 pm  A 292% increase in traffic on the ramp from EB MO 364 to SB I-270, carrying over 3600 vehicles, between 6-8 am  Traffic has also increased at MO 94 and Harvester in the rush periods

Future Improvements  Upgrade to the interchange at I-270 and Page Avenue  Flyover ramp from NB I-270 to WB MO 364 is currently being designed to alleviate congestion at the interchange  Design complete in 2007, but project is currently unfunded  Flyover ramp also being considered for SB I-270 to EB Page Avenue (RT D)  Upgrade to the interchange at I-270 and Page Avenue  Flyover ramp from NB I-270 to WB MO 364 is currently being designed to alleviate congestion at the interchange  Design complete in 2007, but project is currently unfunded  Flyover ramp also being considered for SB I-270 to EB Page Avenue (RT D)

Future Improvements  Design of Phase 2 of Page Ave. extension is approximately 75% complete  Design of Phase 3 of Page Ave. extension is approximately 80% complete  Both Phase 2 and 3 are currently unfunded  Design of Phase 2 of Page Ave. extension is approximately 75% complete  Design of Phase 3 of Page Ave. extension is approximately 80% complete  Both Phase 2 and 3 are currently unfunded

Are Phase 2 & 3 Still Needed?  Without completion of Phase 2 and 3, I-70 will experience significant congestion  Economic and environmental impacts could be significant  Without completion of Phase 2 and 3, I-70 will experience significant congestion  Economic and environmental impacts could be significant

Questions?