Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.

Slides:



Advertisements
Similar presentations
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Advertisements

“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Progress and Plan for Superconducting RF Cavity RF Group.
ERHIC design status V.Ptitsyn for the eRHIC design team.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
V.N. Litvinenko, ElC Collaboration Meeting, Hampton University, May, 2008 Staging of eRHIC Increased Reach in c.m. Energy and Luminosity Vladimir.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
MeRHIC Design V.Ptitsyn on behalf of MeRHIC Design team: M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, A. Burrill, R. Calaga, X. Chang, A. Fedotov,
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
EIC Meeting, Stony Brook University, January 10, 2010 Dmitry Kayran for MeRHIC group EIC Meeting January , 2010 MeRHIC: Injection System.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
October, 2009 MeRHIC Conventional Facilities Al Pendzick October, 2009 Internal Review.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
ERHIC design status V.Ptitsyn for the eRHIC design team.
Real Accelerators: a facility overview the nuts and bolts…and gaskets and resistors United States Particle Accelerator School – Accelerator Fundamentals.
October, 2009 Magnet Electrical Systems Bob Lambiase October, 2009 Internal Review.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
D. Trbojevic, N. Tsoupas, S. Tepikian, B. Parker, E. Pozdeyev, Y. Hao, D. Kayran, J. Beebe-Wang, C. Montag, V. Ptitsyn, and V. Litvinenko eRHIC and MeRHIC.
Starting cost discussion Vladimir N. Litvinenko Brookhaven National Laboratory, Upton, NY, USA Stony Brook University, Stony Brook, NY, USA Center for.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Bob Lambiase May 21, The purpose of eRHIC is to have the capability to collide heavy ions with leptons, such as electrons and polarized electrons.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
P OSSIBILITIES FOR MAINTAINING AA AND PP CAPABILITIES IN PARALLEL WITH E RHIC V. Ptitsyn Collider-Accelerator Department BNL RHIC and AGS Users Meeting,
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Ion Accelerator Activities at VECC
Report Technical Director Storage-Ring-Installation Completed
CERN – Zanon discussions
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Hosting Orsay Walid KAABI
BriXS – MariX WG 8,9 LASA December 13, 2017.
Injector Performance Requirements Conventional Facilities Update
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Electron Source Configuration
Extraction Michael Bevins May 17, 2007
JLEIC Magnet R&D Tim Michalski NP Community Panel Review of the EIC
Presentation transcript:

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Key Components Photoinjector Design – Electron Gun (A. Burrill, 11/2009) “Gatling Gun” multi-cathode Photocathodes & Drive Laser (A. Burrill, 11/2009) Laser development for the required intensity Linac SCRF Accelerator Cavities (A. Burrill, 11/2009) HOM Damper Upgrade, 6 Cavity Types, Cost and Schedule Cryogenic System (A. Burrill, 11/2009) RF systems (A. Burrill, 11/2009) SCRF Development and Design at BNL – Engineering Design Magnet Design Vacuum System RHIC Modifications – Civil and Beam Line Schedule

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC (April 09) Linac 1 Linac 2 Main ERLs; 6 cryomodules x 6 cavities x 18 Mev/cav = 0.65 GeV per linac 0.75, 2.05, 3.35 GeV 4 GeV 0.1, 1.4, 2.7 GeV Pre-accelerator 90 MeV ERL Electron gun 0.1 GeV IR2 region features: - asymmetric detector hall (appropriate for asymmetric detector for e-p collisions) - long wide (7.3m) tunnel on one side from the IR for energy recovery linac Main components: -100 MeV injector on the basis of polarized electron gun (50 mA) and pre-accelerator ERL. -Two main ERLs (one of them in the RHIC tunnel) with maximum 0.65 GeV energy gain per linac. -Recirculation passes are going outside of the existing tunnel: warm magnets, acceptable synchrotron radiation power. MeRHIC: General layout

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC 4 SCRF Cavity Development (Ilan’s Talk) Energy Recovery LINAC 5 Cell SCRF Assembled and Tested at 2K ERL e Gun ASME Code compliance design complete Laboratory Safety Committee Approval Fabrication underway RHIC 56 Mhz SCRF Cavity ASME Code compliance design complete Laboratory Safety Committee Approval Contract SCRF Vertical Test Facility ASME Code compliance design complete Laboratory Safety Committee Approval Test Dewar & Cryogenic Refrigerator in House Shielded Enclosure Complete Collaborative Support: JLab, AES, SNS, TRUMPF, Cornell, Amuneal,...

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC 5 SCRF Cavity Development – ASME Code Compliance Cryogenic Systems need extensive review (DOE Pressure Safety Compliance and LHC Failure) Detailed Stress Analysis done in house using ANSYS w/peer review Detailed Cryogenic Analysis to determine proper relief valve sizing w/peer review Fabrication QA: material testing and certifications, welding procedures and qualification, fabrication in process inspection, leak and pressure testing, certified relief devices, etc. Final Review and approval by Laboratory Committee

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC 6 Magnet Systems Arc Magnets (Conventional, Small Aperture, high accuracy, copper bus magnets) 361 Quadrupoles, 150 Dipoles, 56 Trim Dipoles, 56 Correctors Prototype dipole already machined, assembled, and field mapped. Quadrupole prototype being machined Spreader Combiner Magnets (Dan’s Talk) 4 Spreader/Combiner conventional dipole magnets, 10 thin septum magnets, 42 vertical dipole magnets, 68 Correctors SCRF Cavity Magnets 14 SC Quadrupoles in the SCRF cavity cryostats BNL Design, 1 st Article, Test, Commercial Bid – Built to Print or Build to Specification (SC Quadrupole).

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Vacuum System Layout BEAM VACUUM 30 VACUUM SECTORS 10e -9 Torr pressure in arcs and s.s. 10e -10 Torr in baked transition regions <10e -10 Torr in SC LINAC Fully RF shielded components LINAC INSULATING VACUUM <10e -3 warm Turbomolecular pump on each Module MeRHIC Vacuum I&C Based on recent system upgrades to AGS/Booster and EBIS Challenges Stress in small aperture thin wall chambers. Synchrotron light energy absorber design. (JoAnne’s talk).

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC 8 Beam Line Modifications Required in the RHIC Tunnel Removal/Relocation of existing RHIC Beam Instrumentation. Removal of both DX magnets/Splice Bus. Install two new Polarized Proton Spin Rotators/modify VJP. Separate Beam Tubes for blue and yellow beam. Be beam tube. STAR and PHENIX beam tubes.

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC 9 Spin Rotator Installations 1:00 and 2:00 Fabricate 2 new Spin Rotators (BNL Magnet Division) Spare Coil Assembly will help schedule Reconfigure Q4 end for Spin Rotator Coupling New VJP sections required between Q3 and Spin Rotator New warm to cold fabricated for Spin Rotator/VJP transition Fabricate components to existing drawings 6:00 and 8:00

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC 10 Remove DX Magnets, Install e Beam Injection Chicane Removal of both DX magnets as a complete units Remove and re-splice Blue SC Bus. DO magnets do not have to be shifted 6 new warm dipoles for beam alignment 2 new wide aperture warm dipoles DX Magnet + Y chamber & ZDC

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC 11 Conventional Facilities – Civil Construction Major Additions: Racetrack tunnel with transitions to RHIC tunnel. (possible RHIC schedule issue) Service buildings with access ports to racetrack 1ea – 20x150 for cavities, 1ea – 16x40 for ERL, 2 ea -16x50 for bends Power Extension of the 13.8Kv overhead line to 2:00 – 25 MW 2ea – 2 ½ MVA unit substations, 1ea 13.8/4.2Kv transformers, Basic power distribution Cooling water 3 MW demineralized cooling water system - Basic water distribution Utilities Extension of the sanitary sewer line, Utility compressed air, Domestic water, Extension of the storm drains, Network / communications ductwork

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Summary of C-AD Facility Characteristics Over 1 Million Ft 2 Of Equipment, Office, And Workshop Space 110 Buildings 1000 Acres Of Land 7 Accelerators 400 Direct Staff 22.5 Allocated Staff 6.2 Miles Of Vacuum Beam Pipe 24 Miles Of Cable Tray 62 Electrical Substations 1000s Of Electrical Distribution Circuits 15 Cooling Towers In Service 52 Cooling Systems In Service 1000s Of Electro-magnets / Power Supplies 1740 Superconducting Magnets in RHIC 26 Compressors For Cryogenics System Power Consumption: 25 MW includes 5 MW for the cryogenic refrigerator. (MeRHIC: 5.7 MW cryogenics, 14 MW RF and PS)

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC 13 Installation – Schedule Only Four year construction project CD-3 to CD-4 Critical Items must be ordered during CD-1 and CD-2 SCRF Cavity Fabrication Tunnel Construction Design Spin Rotator Magnet Fabrication Long Lead Items will drive schedule RHIC Operations Schedule During Construction New Tunnel tied in 2 years after CD-3 Temporary Shielding at Tunnel Tie-in Existing 20 Ton Crane! N E W S

Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC C-A Department 50 years of significant upgrades AGS (1960) 80” Bubble Chamber + others (1966) Slow Extracted Beam (1968) 200 MeV Linac (1970) AGS Polarized Protons/Heavy Ions ( ) Booster (1990) RHIC Facilities (1980 – 2000) NASA Space Radiation Laboratory (2004) Electron Beam Ion Source, Stochastic Cooling (2010) + Collaborations: SNS, LHC, NSLS,... MeRHIC is another evolution