Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank www.CarbonFinance.org World Bank methodology event.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

The Concept of Incremental Costs Typical GEF Projects for Climate Change 1. Energy Efficiency (Operational Prog. 5) Industrial Boilers Agricultural Pump-Sets.
Panel discussion Low Carbon Generation Technology
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
Results Based Financing : Private Sector experiences in Latam GDF SUEZ ENERGY LATIN AMERICA Philipp Hauser – VP Carbon Markets
EPA Clean Power Plan. Emission Targets StateInterim Goal Final Goal 2030 AECI 2013 Net Rate Interim Reduction Final Reduction Missouri 1,6211,5441, %21.3%
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
Nigeria: Mayon Turbo Stove Project Carbon Finance and CDD April 19, 2006.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Current CDM experiences HeidelbergCement
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
STRATEGIES FOR PROMOTION OF ENERGY EFFICIENT AND CLEANER TECHNOLOGIES IN THE POWER SECTOR Synthesis Report Issue 1: Implications of Carbon & Energy Taxes.
Biomass to Energy Projects in Indonesia CDM & Sustainable Development January 25 –26, 2006 Shangri-la Hotel, Jakarta -Indonesia Iwan Sutanto, PT. LUNTO.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Development Alternatives Baselines & Additionality Methodologies Workshop on Clean Development Mechanism: Opportunities in Rajasthan January 28-29, 2005.
The First Carbon Exhibition
Baseline Methodology ARNMB0010 Xiaoquan Zhang and Bernhard Schlamadinger.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
Prototype Carbon Fund Training Workshop: Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30- October 2, 2002 Eduardo Dopazo.
© ESD 2003 IRIS KYOTO Example: Svilosa Wood Waste, Bulgaria Coal Waste Emissions Coal Waste Biomass boiler Emissions 75,000 tonnes CO2 per year.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
CDM Methodologies and Project Design: Workshop for CDM Project Developers 12/5/2004. Buenos Aires. Analysis of the Additionality Tool (with project examples)
Case Study: Jepirachi Wind Power Project Northeastern Atlantic Coast Colombia Charles Cormier, PCF Team Tel:
CDM Methodology World Bank Carbon Finance: Interpretations and Approaches to Baselines, Monitoring and Calculation of Emission Reductions Bonn, 6 June.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
Green Banking and MRV 17 November 2010 Takashi Hongo Special Advisor and Head of Environment Finance Engineering Department Japan Bank for International.
CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Additionality and Project Cycle Tunis, August 27-29, 2004 TIMS/EEAA CD4CDM- Fourth Regional Workshop (Phase II) UNEP RISOE / APEXAdditionality in NovaGerar.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
ENDA TM / CDM-PDD1 Analysis of a CDM-PDD illustrated by the El Gallo project Second Regional Workshop on CD4CDM August 2004 Maputo, Mozambique Dr.
Economics of electricity production and competitiveness of nuclear energy Prof. Dr.-Ing. Alfred Voß Institute of Energy Economics and the Rational Use.
Research Center for Energy &Environment Case study on Quang Tri wind power project and the needs for capability development Dr. Nguyen Duc Minh Dr. Nguyen.
Challenges of CDM Implementation in Indonesia Architrandi Priambodo.
American Public Power Association Pre-Rally Workshop February 28, 2006 Washington, D.C. Climate Change: Making Community-Based Decisions in a Carbon Constrained.
International Climate Policy Hamburg Institute of International Economics International Climate Policy Options for making small scale CDM projects more.
UNEP Collaborating Centre on Energy and Environment Rules for Small-Scale CDM Projects Prepared for the CD4CDM Regional Workshop in Tunis January.
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
El Gallo Hydroelectricity Project PDD Analysis
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
Creating the Carbon Asset: PCF Workshop on JI & CDM Methodologies COP-8, New Delhi, 22 October 2002 – Johannes Heister, PCF.
Challenges and Opportunities for Addressing Global Climate Change February 2006.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
0 BARRIERS TO CDM PROJECT FINANCING Presentation to CDM Financial Mechanism Training Course 18 September 2003 Clean Energy Finance Committee.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Morten Pedersen Deputy Programme Director Danish Environmental Protection Agency Climate Change Division.
Some open questions in power sector methodology Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event Dehli,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CDM BASELINE METHODOLOGIES: The devil is in the details DENR Training Course November 4-6, 2003 Climate Change Information Center Manila Observatory Ateneo.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Viability of Carbon Capture and Sequestration Retrofits for Existing Coal- fired Power Plants under an Emission Trading Scheme CEDM Annual Meeting May.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
Presentation transcript:

Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event Dehli, 22 October 2002

Contents Introduction to the Gemina Rice Husk Project, Nicaragua Elements of the baseline Consistency with the Small Scale Panel’s recommendations for simplified methodologies and procedures

Introduction to the Gemina project I Current practice –Gemina Rice and Flour Mill Rice produces 18,000 tons of rice husk yearly, increasing to 25,000 tons after expansion in 2003 –Rice husks are dumped in open piles –Periodic burning of piles to reduce volume Rice husk to electricity project –Construction of ~1.6 MW power plant –Plant consumes 2.75 t rice husk per hour –Ash used to substitute for cement

Introduction to the Gemina project II Main sources of emission reductions –Displacement of electricity from fossil fuel –Methane reduction from avoided rice husk decomposition –CO2 reduction from substitution of cement Yearly reductions (low/optimal) CO2 energy7,418 / 11,144 t CO2e Methane from husks2,338 / 2,338 t CO2e CO2 cement0 / 2,712 t CO2e Projected reduction 21 years: 212,395 t CO2e (low)

Elements of the Baseline I Gemina project is small scale –Renewable energy component less than 15MW –Rice husk power plant directly emits less than 15,000 t CO2e If biomass is counted as renewable energy direct emissions from the project are zero

Elements of the Baseline II Baseline approach selected by Gemina –Marrakech Accord 48 a): Existing or historical emissions, as applicable Justification of selected approach –48 a) defines Business-as-usual as baseline scenario –PCF interpretation: BAU can be justified by (a) using historic or current information (control group) or (b) showing that barriers impede other options. especially relevant for small scale investments

Elements of the Baseline III Barriers to investment identified for Gemina a)Regulatory barriers to access the market for electricity -Smallest block of electricity that can be offered on the Nicaragua wholesale market is 5 MW (Gemina 1.6 MW) b)Competitive disadvantage of non-traditional projects -Lack of precedents regarding integration of small generators of renewable energy created problems with concessionaire c)Limited access to credit -Gemina could not attract financing due to inter alia absence of long-term PPA, high country risk for Nicaragua

Elements of the Baseline IV Indicator for restrictive nature of identified barriers: –Gemina rice husk generator is first-of-a-kind technology in all Central America PCF assistance to overcome the barriers –Carbon purchase agreement is secure revenue stream –World Bank involvement may trigger the interest of other financial institutions

Consistency with SSC Panel Draft for simplified modalities and procedures I Gemina project falls under category D. “Electricity Generation for a System” Suggested methodology: –For environmental additionality: indicate why technology would not be implemented using barriers of Appendix A Alternatively: cost comparison –For calculation of emission reductions: Operating margin, dispatch analysis or average of operating and build margin

Consistency with SSC Panel Draft for simplified modalities and procedures II GeminaSSC PanelDifferences AdditionalityBarrier Analysis a)Barrier Analysis b)Cost compa- rison Gemina uses indicator to demonstrate the effect of barriers Emission coefficients Emission intensity of a proxy plant Operating/ build margin or dispatch analysis Different approach