Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.

Slides:



Advertisements
Similar presentations
PPPL,NFRI Study of Error Field and 3D Plasma Response in KSTAR J.-K. Park 1, Y. M. Jeon 2, In collaboration with J. E. Menard 1, K. Kim 1, J. H. Kim 2,
Advertisements

Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Fast-Ion-D-Alpha and Solid-State NPA Diagnostics for NSTX-U NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Transition to Operations Al vonHalle Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 October 2 nd & 3.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
Macroscopic Stability TSG Pre-forum Meeting #1 J.W. Berkery Department of Applied Physics, Columbia University, New York, NY NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX Team Meeting December 4, 2008 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
J-W. Ahn 1 K.F. Gan 2, F. Scotti 3, R. Maingi 1, J.M. Canik 1, T.K. Gray 1, J.D. Lore 1, A.G. McLean 4, A.L. Roquemore 3, V.A. Soukhanovskii 4 and the.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
NSTX Team Meeting April 5, 2006 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 December , 2012 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics Old Dominion ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Topics Outage planning Outage Coordination Safety and Efficiency Outage planning for diagnostics calibrations and out of scope tasks Outage progress since May Installation risks and mitigations Plans for next four months NSTX before outage

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, NSTX Upgrade Outage A plan has been developed for performing the NSTX Upgrade Outage –Based on experience from similar outages since 1984 –Plan is being continually improved as opportunities arise A system for coordinating and controlling the outage tasks is in place –Based on the very successful Work Control Center that was used during the TFTR D&D Project Assuring safety, efficiency and correct performance

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Planning Outage planning based on bottoms-up estimates from Engineering –Assumes one shift, 5 days per week for almost all work Assigns technicians, by name, to scope to assure staffing requirements are met Adjust start date of tasks to assure tasks in the same area are compatible Accelerating tasks that make other tasks safer or more efficient Peel back cabling and fiber optics, rather than removing them October 2011 November 2012

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Planning cont Work in Bays J, K and L most congested –Neutral beam installation, including cutting large hole in vessel –Coil supports and umbrella modifications for center stack –Diagnostic relocations, including cutting large hole in vessel Work crews on opposite sides of vacuum vessel or on different shifts Pre-plan temporary storage areas to minimize handling Daily / hourly coordination of all field work is critical November 2011 November 2012

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Coordination Use of Work Control Center (like TFTR D&D Project) Work Control Center reviews all Engineering Work Packages for the field –Reviews Job Hazard Analysis (JHA) –Assures pre-requisites are done –Attends pre-job and post-job briefs –Interfaces between Engineering and the field crews –Assures that the field work is done safely and correctly –Assures that the field crews are used efficiently Daily Plan-of-the-day meetings to coordinate activities between crews and fine tune technician assignments –Includes field crew leaders, QA, Safety, Health Physics, Industrial Hygiene, DOE 12/7/11 12/14/11 Set up for machining o-ring groove in upper flange

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Planning Adjustments Plan of the Day meetings –Adjustments made based on actual progress and manpower availability Work Control Center weekly meetings –Adjustments made based on projected availability of parts and procedures Weekly rollover meeting –Adjustments made based on 2 – 3 month look-ahead at all field/shop work Flexibility for adjustments comes from –Second shift work –Multiple crews working on opposite sides of vessel –Temporary platforms to improve safety of access even after parts are out –Trial fit-ups to minimize time spent on NSTX NSTX just before NB2 moves in

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Safety and Efficiency Work Control Center review of all procedures and engineering work packages Plan of the Day meetings with field supervisors and shop supervisors Multiple crews working on opposite sides of vessel Temporary platforms to improve safety and access Trial fit-ups to verify handling techniques All work in NSTX Test Cell being done with Engineering Work Packages (90 packages so far, 39 completed) –Written procedures –Permits –Job hazard analysis –Permits: confined space, hot work, radiation work, penetration, etc –Pre-job and post-job briefings

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Safety and Efficiency Installed extensive scaffolding to facilitate access to the upper and lower domes of the vacuum vessel –Improved safety for workers – full handrails and toeboards –Improved efficiency of removal, installation and welding tasks –Inspected every shift as required by OSHA

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Planning for Diagnostic Calibrations Diagnosticians have listed the calibrations they would like prior to re- starting NSTX Detailed schedules for these calibrations are being prepared –Schedules will be fit into the existing outage schedule –Each calibration will be scheduled as early as possible to avoid delays once the installation work has been completed –Calibrations may be scheduled to occur after the Upgrade Outage if they are not required for CD-4 or early operations

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Planning for Work Outside Project Scope Work in the NSTX Test Cell that is not part of the Upgrade Project will follow the same process as all work performed there –Will require an Engineering Change Proposal (ECP) approved by the Upgrade Project –Will require a Work Approval Form and a detailed job estimate that is reviewed and approved by the Engineering Department –Will require its approved estimates and schedule be added to the Primavera database so it can be tracked alongside the tasks for the Upgrade Project –Will require an Engineering Work Package that has been approved by the Work Control Center Written procedure Job Hazard Analysis Approved permits as required Pre-job and post-job briefings –Will require persons approved to be in the NTC to perform the work under the supervision of the Work Control Center

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Removals to make room for Neutral Beam #2

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Changed mounting hardware for passive plates and re-installed them

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Installation of new TF clevis blocks on the vacuum vessel

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Flags on outer TF legs modified –Additional holes drilled –Flags straightened –Flags ultrasonically tested to verify braze joints

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Removal of TF outer legs that need to be repaired or replaced –Completed with minimal removal of surrounding items –Replacements must be completed before significant re-installations can occur

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Installation of new umbrella legs (upper and lower) –Utilized a crew to prep welding area and parts to minimize welder time (since welders are a limited resource and we need to carefully manage their use)

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Replace upper and lower PF2/3 hardware and add new clamps –95% complete ****

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Removal of old vacuum vessel nozzles at Bays J and K In-vessel set-up for vacuum vessel cutting –Installing support beams, containment and ventilation Ex-vessel set-up for vessel cutting –Installing containment and ventilation

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Installation of second neutral beamline started Moved Neutral Beam #2 (NB2) enclosure into NSTX Test Cell (NTC) Installed lid with cryo panels on NB2 in NTC Welded legs on NB2 Initial alignment of NB2 completed

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Outage Progress Re-installation of cable trays and racks started

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Machine Installation Risks and Mitigations Delays in getting parts delivered to installation crews –Re-schedule work sequence –Schedule work on two shifts once parts arrive Scope creep –Engineering Change Proposal process –Review of engineering estimates by division heads (WAF review) Fit-up of new centerstack –Estimate includes three fit-ups Re-installation requirements for some diagnostics not well defined –Diagnostics in process of defining requirements or electing not to re- install some items

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Plan for December 2012 Vessel cutting at Bays J and K for new neutral beam port Weld JK cap onto vessel

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Plan for December 2012 – January 2013 Install TIV and 90” flange on NB2 so it can be closed up Decon exterior of Neutral Beam #2

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Plan for January 2013 Ex-vessel set-up for cutting at bay L –Installing containment and ventilation Vacuum vessel cutting at Bay L for new diagnostics port Remove temporary in-vessel beams and ventilation Leak check welds on Bays JK cap Remove platform at Bays JKL

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Plan for December 2012 – March 2013 Complete modifications to umbrella and coil supports Complete Neutral Beam systems Re-install items removed for centerstack work Re-install items removed for NB work

NSTX-U NSTX Upgrade Project – Office of Science Review – December 11 – 12, Summary The NSTX Outage has been planned based on –Bottoms-up estimates from Engineering –Identifying staff to do the work –Scheduling work to avoid conflicts The plan is being continuously worked –To improve safety and efficiencies –To deal with delays in getting parts –To accelerate tasks to ease pressure on critical path tasks Coordination and Control –Provided by the Work Control Center –At the Plan-of-the-day meeting –Continuously by the Field Supervisors Successfully performing the outage