Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

Outline Project overview Project-specific success criteria Block diagram Component selection rationale Packaging design Schematic and theory of operation.
ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
ECE 477 Design Review Team 15  Spring 2013 Jackson McCormick, Andrew Batek, Carey Woolet, Justin Lindley.
ECE 477 Final Presentation Team 10  Spring 2008 Paul Ng Daniel Bixby Matt Ligocki David Collins Paul Ng Daniel Bixby Matt Ligocki David Collins.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
Design Review: RoboSiM Robotic Surveillance in Motion
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
Solar Telematics System ECE 477 Design Review, Team 8, Spring 2012 Paste a photo of team members here, annotated with names of team members. Craig Lechlitner,
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 9  Fall 2009 Josh Piron, Jacob Pfister Kevin Templar, Mike Phillips,
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Design Review Team 10  Spring 2007 JUSTIN AZAD AFIFF NUHAIRIADAM.
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
Team /02/28 1. Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 DESIGN REVIEW FEST – FALL OUTLINE  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 12  Spring 2006 EricDaniel Atandra Sriharsha Aasenda Silva Burman Vengapaty.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
Eric Tarun Craig Dave ECE 477 Design Review Team 9  Spring 2006 Galamback Chawla Noble Kristof.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Design Review.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
TCSP – Schematics Design. Major Components Freescale 9S12A64FCUE Microcontroller Etek EB-85A GPS Receiver Electronic Speed Controller HP Photosmart R707.
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
Jeremy Tillman William Ehlhardt Heather Barrett Daeho Hong.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Design Review Team 13  Spring 2007
TCSP – Schematics Design
Project Success Criteria
ECE 477 Final Presentation Team 10  Spring 2008
ECE 477 Design Review Team 5  Fall 2006
ECE 477 Design Review Team ??  Fall 2012
ECE 477 Final Presentation Team 13  Spring 2011
Presentation transcript:

ECE 477 Design Review Team 10  Spring 2008 Paste a photo of team members here, annotated with names of team members. Paul Ng Daniel Bixby David Collins Matt Ligocki

Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria Block diagramBlock diagram Component selection rationaleComponent selection rationale Packaging designPackaging design Schematic and theory of operationSchematic and theory of operation PCB layoutPCB layout Software design/development statusSoftware design/development status Project completion timelineProject completion timeline Questions / discussionQuestions / discussion

Project Overview Overall Objectives Create an Unmanned Aerial Vehicle (UAV) which is capable of the following:Create an Unmanned Aerial Vehicle (UAV) which is capable of the following: Autonomous flight Autonomous flight GPS navigation GPS navigation Ground photography Ground photography

Project Overview (cont) Planned implementation Multiplex Easy Glider RC planeMultiplex Easy Glider RC plane Manual takeoff, landingManual takeoff, landing Controlled by PCB at cruising altitudeControlled by PCB at cruising altitude PCB triggers digital camera upon reaching GPS waypointsPCB triggers digital camera upon reaching GPS waypoints

Project Overview (cont) PCB Plane Control - In Orientation - Thermopile tilt sensingOrientation - Thermopile tilt sensing Velocity, position – GPS ModuleVelocity, position – GPS Module Destination data – Pre-written SD CardDestination data – Pre-written SD CardOut Drives servos for ailerons, rudder, elevatorDrives servos for ailerons, rudder, elevator Drives motor ESCDrives motor ESC

Project-Specific Success Criteria An ability to fly an R/C plane autonomously once airborne, based on pre-programmed waypoints.An ability to fly an R/C plane autonomously once airborne, based on pre-programmed waypoints. An ability to decode and display GPS coordinates.An ability to decode and display GPS coordinates. An ability to control motor speed and control surface position.An ability to control motor speed and control surface position. An ability to capture still images.An ability to capture still images. An ability to read waypoints from a MicroSD removable storage device.An ability to read waypoints from a MicroSD removable storage device.

Block Diagram

Component Selection Rationale Microcontroller Chosen component: MC9S12A64Chosen component: MC9S12A64 –Full assortment of required interfaces –16 bit PWM –Dual SCI ports –Small 80 pin package and modest amount of memory –Familiarity with processor family and development environment Competing Alternative: HCS12E seriesCompeting Alternative: HCS12E series

Component Selection Rationale GPS Chosen component: ETek EB-85AChosen component: ETek EB-85A –2.6 m accuracy using DGPS and WAAS –5 Hz refresh rate –Built in antenna –Extremely light weight: 0.52 oz –Lower price: $100 vs $200 Competing Alternative: Garmin GPS-18Competing Alternative: Garmin GPS-18 ETek EB-85A Garmin GPS-18

Component Selection Rationale Airframe Chosen component: Multiplex Easy Glider ElectricChosen component: Multiplex Easy Glider Electric –Foam construction for durability and easy repair –Glider design for stable flight –Large 71 in wingspan –Included ailerons for flight stabilization Competing Alternatives: Multiplex Easy Star, Super Cub ElectricCompeting Alternatives: Multiplex Easy Star, Super Cub Electric Easy Glider ElectricEasy StarSuper Cub Electric

Packaging Design Plane is the packagePlane is the package PCB and camera must fit inside fuselage along with the standard components.PCB and camera must fit inside fuselage along with the standard components. Components must not exceed EasyGlider limit of 31 oz.Components must not exceed EasyGlider limit of 31 oz. Components must be balanced with the structure of the plane.Components must be balanced with the structure of the plane. Excessive mods can alter the aerodynamics of the plane.Excessive mods can alter the aerodynamics of the plane.

Packaging Design - Weight

Packaging Design - Space Critical Items PCB - will be mounted on edges of cockpit area, PCB component height requires some hollowing out of cockpit plugPCB - will be mounted on edges of cockpit area, PCB component height requires some hollowing out of cockpit plug Upgraded Motor – virtually same size as the stock motor, fits in original spot in plane noseUpgraded Motor – virtually same size as the stock motor, fits in original spot in plane nose Camera – most difficult, requires the most substantial foam cuttingCamera – most difficult, requires the most substantial foam cutting

Packaging Design - Space Outside Fuselage Aileron Servos (2)Aileron Servos (2) Thermopiles (4)Thermopiles (4) GPS ModuleGPS Module Inside Fuselage Rudder, Elevator ServosRudder, Elevator Servos Radio ReceiverRadio Receiver Drive Motor ESCDrive Motor ESC CameraCamera BatteryBattery Drive MotorDrive Motor GearboxGearbox

Packaging Design - Balance Nose-heavyNose-heavy Battery, GPS Module used for final balancing, lever- arm manipulationBattery, GPS Module used for final balancing, lever- arm manipulation

Schematic (Microcontroller)

Schematic (Clock Generator) Standard Pierce Oscillator. Follows Manufacturer's Specifications and Requirements for MCU.

Schematic (Servo Controls) SERVOS Manual Override

Schematic (GPS Connections) LEVEL TRANSLATORS GPS Module 2.8V Regulator

Schematic (Camera) Darlington Array Works by pulling low switches on HP Photosmart R707 camera.

Schematic (Power Supply) Buck Non- Synchronous Step Down Voltage Regulator Available in both 3.3V and 5V ranges. Up to 87% Efficiency.

Schematic (LCD Interface) Uses a MAX3227 Level translator to convert from CMOS to RS-232. Converts from 0-5V to -12 to +12V.

Schematic/Theory of Operation Level Translators to 3.3V

Schematic (Thermopile) Low Power Amplifiers Thermopiles

Schematic (Miscellaneous) Voltage Sensing Circuit Radio Receiver Voltage Sensing Circuit used to gauge battery life to estimate flight time remaining. 10V Zener used for voltage protection

PCB Layout Dimensions: 3.5”x2.5”Dimensions: 3.5”x2.5” High component densityHigh component density 0805 SMD resistors/capacitors0805 SMD resistors/capacitors 2 Power supplies: 3.3V, 5V2 Power supplies: 3.3V, 5V Up to 3A current draw per railUp to 3A current draw per rail Few sensitive signalsFew sensitive signals Nets routed by priorityNets routed by priority Status: 100% Placed, 94% RoutedStatus: 100% Placed, 94% Routed (Not including ground planes)

PCB Layout Top Copper

PCB Layout Bottom Copper

PCB Layout Microcontroller

Clock/Camera

Clock/Camera

Power Supply

PCB Layout Thermopile

Plane Control

PCB Layout SD Card/LCD/GPS

PCB Layout SD Card/LCD/GPS

Software Design SCI and IOC interrupts fill variables then set flags for GPS and radio interfacingSCI and IOC interrupts fill variables then set flags for GPS and radio interfacing Timer interrupt used to create time stampsTimer interrupt used to create time stamps MicroSD interface is polling basedMicroSD interface is polling based Overall operation in a main loopOverall operation in a main loop Each module is written in its own source and header C filesEach module is written in its own source and header C files

Software Development Status Completed Interfaces using 9S12C32:Completed Interfaces using 9S12C32: –Timer counter used for time stamping –MicroSD card read and write over SPI –Digital camera control using several GPIO pins –Radio receiver tracking with input capture –Servo motor control with 16 bit PWM Tasks to complete next:Tasks to complete next: –Write GPS interface for 9S12C32 –Port code to 9S12A64 custom dev board –Write stabilization and navigation software

Project Completion Timeline Week 2/24 – 3/1 3/2 – 3/8 3/9 – 3/15 3/16 – 3/22 3/23 – 3/29 3/30 – 4/5 4/6 – 4/12 4/13 – 4/19 4/20 – 4/26 4/27 – 5/ Finalize PCB Populate PCB Software Design Packaging Testing Documentation

Questions / Discussion