© 2008 Eventure Events. All rights reserved. Risk Assessment and Management of MRO Inventory Shane McLellan Project Leader – Business Performance & Planning.

Slides:



Advertisements
Similar presentations
© 2009 Eventure Events. All rights reserved. Best Practices in SAP PM Greg Olynyk Catalyst Paper Inc.
Advertisements

Financing the Business Chapter 36. How are they different? The easiest way to separate accounting and finance is to think of accounting as the past and.
How Reliability Impacts Shareholder Value Bruce Hawkins, CMRP Management Resources Group, Inc.
BRYAN YOUNG Preventative Maintenance Working With Safety.
IT Asset Management Status Update 02/15/ Agenda What is Asset Management and What It Is Not Scope of Asset Management Status of Key Efforts Associated.
Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
Everything HelpDesk® The Academic Preventive Maintenance Solution Helping you stay one step ahead with Ticket Templates GroupLink Corporation.
A.s. bhalerao.  Inventory is a Latin word ‘’ in –ven-to- r y ‘’ meaning listing of physical stock on hand of items recorded every year by business concern.
Chapter 13: Learning Objectives
Consumption-based Planning
Inventory Control, Cost & Deterministic models Unit-III Revised version.
Chapter 8 Aggregate Planning in a Supply Chain
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Workshop: Maintenance Work Orders May 9, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.
Ambition in Action. Ambition in Action HEAD TEACHER DEVELOPMENT PROGRAM – FINANCAIL MANAGEMENT.
INDUSTRIAL & SYSTEMS ENGINEERING
Managing the Information Technology Resource Jerry N. Luftman
Forecasts and Assessments Presented to the Independent Power Producers’ Society of Ontario Pat Doran, Supervising Technical Officer Independent Electricity.
The Production Process
Introduction to SAP R/3.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
Inventory Management for Independent Demand
Production Planning Processes Theories & Concepts
Operations Planning Horizons
MRP, MRP II, and ERP.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Blueprint Training Presentation: Maintenance Work Orders October 3, 2006.
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Enterprise Asset Management
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
1 Operations Management Lesson 6 Material Requirements Planning and Enterprise Resource Planning.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 14 Enterprise Resource Planning Systems.
Fleet Performance and Reliability in Generation Utilities
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Managing Purchasing & Inventory
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
From Research Prototype to Production
Financial Accounting (FI)
L.E.A. Data Technologies L.E.A. Data Technologies Introduction.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
APM Automation Solutions Ltd. An investment in knowledge always pays the best interest. Benjamin Franklin APM 3DLevelScanner ™ Changing the market from.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
Materials Planning & Control. Introduction With the development of ‘integrated materials management’ and ‘supply chain management’, material managers.
WHAT IS MATERIAL MANAGEMENT? Definition: A process encompassing acquisition, shipping, receiving, evaluation, warehousing and distribution of goods, supplies.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
Resource Planning Chapter 14. Step Stool Assembly.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
IBM Maximo Asset Management Doug Wood, Architect Tivoli CTO’s Office COBie CMMS/CAFM Challenge121-Dec-11.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
FINANCIAL RESOURCES MANAGEMENT
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
 Andersen Consulting IM01 - Organizational Structure & Master Data in IM November, 2000.
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
Enterprise Processes and Systems MIS 2000 Instructor: Bob Travica Updated 2016 Class 16.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
Module 2: Supply Chain & Logistics Management
Inventory Fundamentals
Inventory Transactions庫存交易
Workshop: Materials Use
How businesses use information systems (Part 1)
CHAPTER 14 MRP and ERP.
Across the entire value chain
Bob Bittner and Les Martinez
Workshop: Equipment June 29, 2006.
Inventory Fundamentals
Presentation transcript:

© 2008 Eventure Events. All rights reserved. Risk Assessment and Management of MRO Inventory Shane McLellan Project Leader – Business Performance & Planning SaskPower

Discussion topics: SaskPower –Vision, location, business, structure, and history Materials Work/Process Management Overview The MRO Inventory risk assessment process –Materials tie to PM activities –Assessment process development –Leveraging SAP Doclink to retain knowledge Summary of Current and future initiatives

Vision: –People and innovation... powering Saskatchewan to a bright future. is a fully integrated electric utility located in Saskatchewan supplying power to the entire province.

Relatively Speaking…..

generating facilities are strategically located: Hydroelectric – 854 MW Natural Gas – 538 MW Wind – 172 MW Coal – 1653 MW _______________________________ Subtotal – 3217 MW Independent – 454 MW _______________________________ Total – 3671 MW

Plant maintenance and major capital projects are required to enhance aging equipment, implement new technical processes and develop new generation solutions. These activities have a significant impact on inventory holdings.

Materials PPBU SaskPower Significant $ provision for obsolete inventory > 150,000 MMRs (>95,000 with stock) –Adding ~ 6,000 per year > 120 material groups De-centralized structure for managing materials and most inventory purchasing functions

MRO Inventory Required For… Maintenance –Planned maintenance activities Preventive maintenance Weekly, monthly, quarterly, annual, etc. Repair –Unplanned break-fix maintenance activities As occur Operations –Consumables Used along side Maintenance and Repair or alone May or may not be on BOMs

Inventory Decision?... Balancing Risks Do not Stock…potential for unit outage –Public / employee safety Forced brown-outs, essential services, extreme weather –Reliability –Revenue: potential loss of generation capacity $70/MWh X MWh capacity of unit(s) Stock…potential for wasted resources –Lost capital Limited capital resources

Why do Inventory Assessments? Legal requirements (accounting rules) –Accurately value assets item cost $ ten years ago; no longer required; and no market value; valued at scrap value minus disposal costs Business benefits (increase productivity) –Reduce non-value-added costs: initial purchase price carrying charges physical storage administrative

PPBU $ Provision for Obsolete Inventory

…more on Business Benefits Identify obsolete materials –Recognize true inventory asset value –Utilize freed up space and resources for value added activities including: Procuring and maintaining required inventory; Regularly assessing dead stock items; Updating and managing SAP master data. Identify opportunities to reduce min/max stock levels (slow moving & costly items) Identify items that may be under stocked

% Dead Stock / Active Stock Is obsolete inventory identified and removed regularly? Presently, “No”; responses heard: –Too difficult! –Not enough resources! Or worse… –May need it some day. –Might be able to scavenge something from it. Careful!! –Its a slippery slope!

% Dead Stock / Active Stock A slippery upward slope!

Process Optimization So how can we optimize the management (including assessment) of MRO inventory?

The Materials (MM) Process Specify Source Buy Inventory Use

The Maintenance (PM) Process Initiate Plan Schedule Execute Complete

Integration of MM and PM Processes SpecifySourceBuyInventoryUse InitiatePlanCompleteExecuteSchedule

Plan : Specify & Source

Decision; Schedule : Buy

Plan, Execute, Complete : Use

SAP Functionality to Manage Inventory The Material Master Record (MMR) –Material Resource Planning (MRP) MRP Type ABC –Bill of Material (BOM) –Document Linking –Classification –Serialization

MRP Type – Material Resource Planning V1: min / max maintained –Slow or fast moving critical items –Fast moving non-critical items PD: required items ordered at WO release –No stock maintained –Typically not a critical item ND: maintain record for information purposes –Not currently used but may be used in the future –May have been used in the past (contains history)

ABC – Analysis of MRO Inventory Separating essential from non-essential –A: Essential stock items that: Are directly critical to generation of MW May be fast or slow moving (usually slow) Are typically high value (not always) –B: Non-essential stock items that: Can be ordered at WO release Typically have shorter lead times –C: Essential Stock items that: Are not directly critical to generation of MW Would significantly impact business if stock-out occurs Are fast or slow moving (usually fast) Are typically low value (not always)

ABC Indicator & MRP Type Classifying essential and non-essential –A: items critical to generation of MW MRP of V1 (min/max maintained) with Lot Size HB Slow or fast moving (usually slow) Typically high value (not always) –B: items can be ordered at WO release MRP of PD (no stock maintained) with Lot Size EX MRP of ND (no stock maintained) with no Lot Size –C: items not directly critical to generation of MW MRP of V1 (min/max maintained) with Lot Size HB Non-critical items used frequently (high quantity) Typically low value (not always)

BOMS BOMs tie Materials to Plant Maintenance

Document Linking in SAP

A Picture is Worth a Thousand Words…

Other Tools Spares Optimization System (SOS) –Proprietary software –Used 2000 – present to varying degrees –Comprehensive –Resource intensive –No workflow SaskPower’s Material Assessment Database (MAD) –Built in-house –Used 2006 to present –Less comprehensive than SOS –Resource friendly and fast –Newest version contains workflow Other ….

SaskPower’s Material Assessment Database Key Requirements of Assessment Tool –Workflow Move documents through assessment process –Integration Maintain key information including photos –Transparency Provide for easy tracking of process At SaskPower we built an assessment tool based on previous knowledge and the above identified requirements.

Views – Plant Contact View Choose assessments to assign

 One click to access the tasks in “Your Responsibility” View Views – My Responsibility View

Views – Other Views that are Available By Plant & Role By Plant & Owner Supervisor View Sortable View By Plant & Status

Material Overview

BOM information…

Used on past work orders…

History of material movements….

Link to Functional Location Structure

Recommendation only

Link Assessment to MMR in SAP

MAD is One of Many Current Initiatives Process Development / Improvement –SAP MM/PM (ABC, M Status, S.Proc., offset) –Sub-processes (receipts, issues, salvage…) –Block Maintenance –Training Material Risk Assessments –Controlling function / operations management Standard Supply Agreements Measures & Dashboard –Lotus Notes

Future MAD Plans New MMR / Change MMR Risk calculator –Factor in cost of replacement energy, MWs impacted and lead time to replace Move process to SAP Portal BI / BOb reporting

Goal for December 2008…

Risk Calculator Cost of replacement energy: $70/MWh MWs impacted: derate or outage –10 to 300 MWhs Lead time to replace –10 days to 2 years

SAP Portal – MAD: Assess, Create, Change Workflow and authorizations Integration of information (transactions) Transparency of assessment history

Boundary Dam Manager AB C D Turbine Coal Purchasing Stores Legal There Are Lots of Players… Finance PPBU

Power Production BPP Eng. Services Ops. Support HR Legal …and it gets more complicated Finance

Key Lessons: SAP is only as good as your data…and your management of work and process. Process is key: –Ownership required at the plant (all levels) –Effective MM/PM work/process management tools –Supported by BPP, Purchasing, Legal, etc. Opportunities exist for utilities to reap huge benefits from MRO inventory risk assessments.

© 2008 Eventure Events. All rights reserved. Shane McLellan Project Leader – Business Performance & Planning Power Production; SaskPower