INTRODUCTION Mr. Benjamin W. Lawless NGB/A7O Chief, Operations Division Installations and Mission Support Directorate.

Slides:



Advertisements
Similar presentations
WA National Guard Construction Program 2011 Lt Col Michael Moran WA Air National Guard.
Advertisements

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Civil Engineer Center Brig Gen Vince Saroni, P.E. Deputy Director 20 Aug 2013.
Energy Initiatives at Joint Base Cape Cod (JBCC).
AFCEC Execution & AFIMSC Future
I n t e g r i t y - S e r v i c e - E x c e l l e n c e AF Facility Energy Perspective 1 David J. Bek, P.E. Energy Director AFCEC/CN.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Legal Authorities for Partnerships and Shared Services Jennifer Curtin January 16, 2013.
PURPOSE AND LEGAL AUTHORITY FOR COOPERATIVE AGREEMENTS
Army Budget Update DPW Worldwide Workshop Presented by: MG Jerry L. Sinn Deputy Assistant Secretary of the Army (Budget)
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Department of the Interior Overview of DOI Fleet Management Program Initiative Presented to the National Property Management Association - Federal Center.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
NASA Real Property Program August 20, 2014 Scott Robinson Director, Facilities Engineering Division Acting Director, Integrated Asset Management Division.
Going Green: City of Phoenix Sustainability Update ACMA Winter Conference February 7, 2008 Carolyn F. Bristo Assistant Public Works Director City of Phoenix.
Partnership in Excellence Preserve Our Heritage; Innovate and improve for a Better Future Moderator: Paul Sutto, PE Joint Base San Antonio Small Business.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
Air Force Center for Engineering and the Environment I n t e g r i t y - S e r v i c e - E x c e l l e n c e Col Scott Hartford, P.E. Chief, Capital Investment.
Contract Mechanisms and Project Structures to Implement Energy/Water Projects February 24, 2010.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Thomas R. Beranek,
NAVAL FACILITIES ENGINEERING COMMAND 13 July 2015.
United States Air Force Reserve Fly, Fight and Win… I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Lt Col Gregory Ottoman Programs Division.
Legacy Management Strategic Plan 2010 David Geiser Director, U.S. Department of Energy (DOE or Department) Office of Legacy Management (LM) November 2010.
Presented By LTC E. S. Crow Construction Branch Chief.
The Louisville Engineer District BUILDING STRONG ® Military Program Overview Louisville District Rick Lotz Chief, Fort Campbell Support Section July 31,
Office of the Chief Economist Office of Energy Policy and New Uses Harry S. Baumes, Ph. D. Associate Director Office of Energy Policy and New Uses Presented.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Engineering and Support Center, Huntsville Executive Order 13693: Federal Sustainability in the.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Center for Engineering and the Environment 1 Sustainable Communities Approach Paula Shaw.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
Phoenix Convention Center Phoenix, Arizona Art and Science of Energy Management Agency Energy Manager The Art and Science of Energy Management Jeff Means.
US Army Corps of Engineers BUILDING STRONG ® Charleston District Program Overview MAJ Mike Ellicott Deputy District Commander U.S. Army Corps of Engineers,
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Office of the Chief Economist Office of Energy Policy and New Uses National Agricultural Credit Committee Harry S. Baumes Associate Director Office of.
Office of the Assistant Secretary of the Army Installations and Environment Our Installations Supporting the War: Relevant and Ready “Installation Transformation.
P-100 Industry Day 29 November What is the P100? The Facilities Standards for the Public Buildings Service The P100 is a mandatory standard. It.
North Carolina Military Business Center August 19, 2009.
1 of The Army’s Quest for High Performance Buildings Manette Messenger US Army IMCOM Southeast June 2008.
1 Base Realignment and Closure (BRAC) The Army’s Approach to Managing Resources 10 August 2005 Mr. Jeff Giangiuli Vice President CALIBRE.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e Colonel Tim.
Seattle District MILITARY CONSTRUCTION PROGRAM
1 Energy Exchange : Federal Sustainability for the Next Decade 1 Phoenix Convention Center Phoenix, Arizona 1 OMB Scorecard on Energy/Sustainability FY14.
Assessing Army Infrastructure
ENERGY EFFICIENCY & SUSTAINABILITY IN NEW SCHOOL CONSTRUCTION August 10, 2006 SFB STUDY SESSION.
Sustainability Efforts at The Combat Center Erin Adams, Air Resources Manager Marine Corps Air Ground Combat Center, Twentynine Palms, CA November 2011.
2009 Federal Environmental Symposium East June 16-18, 2009 Bucky Green, EPA Sustainable Facilities Practices Branch Matt Sawatzki, Booz Allen Hamilton.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Air Force Design & Construction Mr. Robert Gill, P.E. 1.
Sustainable Building Plan At NASA Marshall Space Flight Center Huntsville, Alabama Energy Huntsville
Demonstrating Success: NASA Performance and Results Mike A. McNeill Environmental Management Division NASA Headquarters.
ANGRC Orientation Always On Mission ANGRC Orientation Brief Brig Gen Michael R. Taheri Commander, ANGRC Col Michael Flanagan Vice Commander, ANGRC 201.
Guarding America — Defending Freedom The Air National Guard CAFDEx  Support Services 1 Industry Day – 1 April 2015.
Office of Infrastructure and Management Results-Oriented Government: The Executive Branch Management Scorecard January 25, 2006 White House Summit on Federal.
All You Need to Know to Meet Your Green Building MOU Commitments *** MOU Technical Guidance PHASE I Alison Kinn Bennett Chair, ISWG Technical Guidance.
US Army Corps of Engineers BUILDING STRONG ® Savannah SAME Post South Atlantic Region Program Review 15 June 2016 LTC Landon Raby Deputy District Engineer.
Zero Net Energy (ZNE) Facilities Design Presentation to California State Lottery Commission November 20, 2014 Director’s Report 7c.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Recruit, Train, and Educate Airmen to Deliver Airpower for America ENJJPT Steering Committee Briefing Facility Projects Mr. Christopher Coppala Air Education.
2016 SAME Jacksonville Post Industry Day 8 Dec 2016
SAME Savannah Post Industry Day 14 June 2017
2012 Environmental Symposium Opening Address
2017 Huntsville Center Industry day - 18 Oct 2017 Huntsville, alabama
Army Engineer Association Engineering & Energy Track 16 June 2015
NAVFAC SOUTHWEST RENEWABLE ENERGY PROGRAM Joint SAME/SMPS-OC Breakfast August 26, 2010 Nathan Butler, PE NAVFAC Southwest Renewable Program Office
Joint Base Langley – Eustis Overview
The Kirtland National Security Complex
Louisville District IDIQ Forecast
Resourcing the Army A Campaign Quality Army with Joint and Expeditionary Capabilities Our Army at War… Relevant and Ready MG Edgar E. Stanton III Director.
Energy Initiatives at McGuire Air Force Base
P-100 Industry Day 29 November 2007.
HQ Air Force Special Operations Command / FM
Presentation transcript:

INTRODUCTION Mr. Benjamin W. Lawless NGB/A7O Chief, Operations Division Installations and Mission Support Directorate

Guarding America - Defending Freedom 2 Air National Guard Installation Locations

ANG PHYSICAL PLANT Guarding America - Defending Freedom 3 ANG Size and Composition 1,144 Aircraft 107,724+ People $13.1B Inventory Plant Value 88 Flying Locations 4 Combat Readiness Training Centers 1,604 Support Units 2 ANG Bases 65 Civilian Airports 12 AF Bases 1 Naval Air Station 5 Air Reserve Bases 1 NASA Facility 2 ANG Stations Footnotes: Located in all 50 states, 3 territories and District of Columbia 177 locations total Most land leased to the AF and licensed to the State People excludes Federally funded State employees

Guarding America - Defending Freedom 4 ANG MILCON – FY2010 POM As enacted FY10 POM FYDP - $550M

Guarding America - Defending Freedom 5 Sustainment, Restoration & Modernization Program

Guarding America - Defending Freedom 6 FY09 – SRM $325M ($25M Stimulus) – MILCON PB $21.8M (4 Projects) – MILCON ADDS $221M (29 Projects) – BRAC $131M (30 Projects) – FY 09 Stimulus $50M (10 projects) MILCON TOTAL $423.8M FY10 – SRM~$300M – MILCON ~$380M ANG Milcon and SRM Programs

Guarding America - Defending Freedom 7 Methods of Design Execution – Base/State level IDIQ A-E Contracts Most SRM projects Some Milcon projects – NGB National A-E IDIQ Contracts Some Large / Technical SRM projects Most Milcon projects – Other Contracts (COE, AFCESE, etc.) ANG Design Execution

Guarding America - Defending Freedom 8 Methods of Construction Execution – United States Property and Fiscal Officer by State SB Set Aside Contracts State MATOC IFB RFP (Source Selection) – Other Contracts (COE, AFCEEE, etc.) ANG Milcon and SRM Execution

Sustainable Design and Construction Guarding America - Defending Freedom 9 ANG MILCON and Major SRM projects USGBC registration required LEED Silver recognition goal

Sustainable Design and Construction Guarding America - Defending Freedom 10

Energy Conservation Guarding America - Defending Freedom 11 Energy Policy Act of 2005 (EPAct 05) – 30% consumption improvement over baseline – as LCC effective – Requires advanced building energy modeling Energy Independence and Security Act (EISA 07) – 30% minimum domestic hot water generated by solar systems – as LCC effective

Energy Conservation Guarding America - Defending Freedom 12 Examples of new facilities which will exceed 30% reduction in consumption over baseline

Renewable Energy Guarding America - Defending Freedom 13

Flexible and Open Floor Plans Guarding America - Defending Freedom 14

Martinsburg WVa C-5 Bed Down Guarding America - Defending Freedom 15

Memphis TN C-5 Bed Down Guarding America - Defending Freedom 16

Air Force Design Awards Guarding America - Defending Freedom 17

Air Force Design Awards Guarding America - Defending Freedom 18

Questions ? 19