Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation August 20, 2009.

Slides:



Advertisements
Similar presentations
National Wildlife Refuges in Nebraska face a $16.6 million budget shortfall Nebraska is home to six spectacular national wildlife refuges and a rainwater.
Advertisements

National Wildlife Refuges in Missouri face an $18.4 million budget shortfall Missouri is home to spectacular natural resources including 10 national wildlife.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
National Wildlife Refuges in Louisiana face a $76.1 million budget shortfall Louisiana is home to spectacular natural resources including 25 national wildlife.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
1 Presentation for the 11th Annual Atlantic Intracoastal Waterway Conference By David B. Sanford Director, Navigation Policy & Legislation American Association.
THE RED RIVER. FUNDING ad valorem tax based on value of property in the district - ad valorem tax based on value of property in the district
Returning to Our National Waterways Dabney Hegg U.S. Senate Committee on Commerce, Science and Transportation.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
2013 Annual Waterways Symposium “Goin’ With the Flow” Presented by: Jim Scharner The David J. Joseph Company October 2 nd, 2013.
Atlantic Intracoastal Waterway (AIWW)
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Community College Workforce Development Center Melfa, Virginia August 16, 2013 “ A Unified Voice.
LDOTD July 11, 2013 Sean M. Duffy, Sr. Executive Director Lower Mississippi River (LMR) Deepening Project LA Dept of Transportation.
Washington Port Issues Washington State Freight Advisory Committee Seattle, WA December 9, 2013.
Channel Portfolio Tool (CPT)
National Wildlife Refuges in South Carolina face a $24.2 million budget shortfall South Carolina is home to spectacular natural resources, including eight.
Ports and Waterways: A State DOT Perspective Secretary Sherri H. LeBas, P.E. April 29, 2015.
1 Great Lakes Maritime Task Force 14th Annual Informational Briefing for the Great Lakes Delegation Tom Buck, C.E.O. Carmeuse Lime and Stone April 2, 2009.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
“Closing” the Mississippi River Gulf Outlet (MRGO): Environmental and Economic Implications Coastal Wetland Planning, Preservation, and Restoration Act.
Fiscal Year 2013 Annual Plan BRIEFING TO: COASTAL PROTECTION AND RESTORATION AUTHORITY Baton Rouge, LA January 18, 2012.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Presentation to the: Governor’s Advisory Commission Chris Accardo Chief, Operations Division.
National Wildlife Refuges in North Carolina face a $74.9 million budget shortfall North Carolina is home to spectacular natural resources, including 10.
Port of New Orleans Pat Gallwey Chief Operating Officer Port of New Orleans Counselors of Real Estate Oct. 13, 2009.
PORT EVERGLADES. 3.7 MILLION CRUISE GUESTS 6 MILLION TONS OF CARGO AND 924,000 CONTAINERS The total value of economic activity at Port Everglades in FY.
DIVISION OF PORTS AND HARBORS PORTSMOUTH, NEW HAMPSHIRE Captain Geno J. Marconi, Port Director.
Chris Bonura Director of Industrial Development Port of New Orleans Hydrographic Services Review Panel 28 November 2012.
1 Water Resources Development Act (WRDA) Overview Why the Federal Government Must Invest in Seaport Related Infrastructure for AASHTO/ITTS Webinar Jim.
Study conducted for the Coalition of Alabama Waterway Associations by Troy University Center for International Business and Economic Development.
The Importance of Our Nation’s Waterways Presented to Congressional Waterways Caucus Jim Walker HQUSACE 22 July 2009.
Savannah Harbor Expansion Project
FY 10 Budget Balancing Plan and the Impact of the American Recovery and Reinvestment Act Mary Lassiter State Budget Director June 4, 2009.
“Multi-Purpose Missions and the Government Balancing Act” WHAT HAT DO YOU WEAR?
Committees Katia Black Period 6 th House standing Committees Agriculture Transportation and infrastructure Education and the workforce Resources.
BRIEFING FOR BG DUKE DELUCA COMMANDER, MISSISSIPPI VALLEY DIVISION PRESIDENT-DESIGNEE, MISSISSIPPI RIVER COMMISSION JANUARY 22, 2014 William B. Hobgood.
WRRDA and WRDA: How are they different, and does it make any difference? Inland Rivers, Ports and Terminals, Inc. Tuesday, April 29, 2014 James A. Kearns.
State of Connecticut Nutmeg Network Statement of Direction 9/10/
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Ken Ortego – Vilar and Elliott.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
U.S. Army Corps of Engineers USACE Navigation Data/Information Workshop July 7, 2005 Arlene L Dietz, Director, Navigation Data Center.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
The Economic Impact of the Inland Rivers and the Vessels That Serve Them 2012 National Homeland Security Conference May 22, 2012 Dennis Wilmsmeyer, Presenter.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
Coastal Brownfields: At the Water’s Edge Panel: Waterfront Revitalization and Marine Transportation.
Building Strong! May Deep Draft Navigation Module 2011 Planning Associates Class Jeremy LaDart Office of Water Project Review HQUSACE Mission Overview.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
2011 ANNUAL SALINITY SUMMIT J. Tom Ray, P.E, D-WRE Water Resources Program Manager Lockwood, Andrews & Newnam, Inc.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
SOUTHWEST PASS AREA Examples of the Known Effects to Navigation Due to Channel Narrowing Associated Branch Pilots for the Port of New Orleans Associated.
The Case for the Federal Hopper Dredge Fleet On the Pacific Coast.
Wildlife Refuges in California face a $53 million budget shortfall California is home to spectacular natural resources including 30 national wildlife refuges.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
2013 SCOWT WASHINGTON MEETING/ WASHINGTON, DC 20 JUNE2013 AASHTO Waterborne Freight Bottom Line Report Chris Smith Intermodal Policy and Program Manager.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
THE RED RIVER.
Shawn D. Wilson, Ph.D. Secretary
AASHTO Freight Update WRDA, PRIIA and MAP-21
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
Smart Rivers Conference 2017
EHCMA Hurricane Workshop
Beneficial Use of Dredged Material
AASHTO Waterborne Freight
Navigation Funding for CMANC
Presentation transcript:

Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation August 20, 2009

Sean M. Duffy, Sr. President and CEO 3939 N. Causeway Boulevard, Suite 102 Metairie, LA 70002

Harbor Maintenance Trust Fund What is the Harbor Maintenance Trust Fund?  The Harbor Maintenance Trust Fund was authorized in the Water Resources Development Act of 1986, P.L , as a tax on channel users to pay for operations and maintenance costs on commercial waterways.  It is an ad valorem tax equal to.125% on the declared value of imported commercial and domestic cargo and on passenger vessel tickets.  This tax is collected by Customs on behalf of the Corps of Engineers.  Last year this tax generated $1.6 billion, yet only $766 million was used for its intended purpose. The remaining $834 million was deposited into the General Treasury to offset the deficit.

Harbor Maintenance Trust Fund  The tax collections are accounted for in an HMTF “account,” and a certain amount of funds are transferred to the Corps’ budget every year (typically around $700 to $800 million) no matter how much tax is collected. The HMTF currently has a “balance” of over $5 billion, and collections range from $1.3 to $1.7 billion per year. The GAO estimates that without any change, the surplus will reach $8 billion by  Monies collected under the Harbor Maintenance Tax should be used for its intended purpose--maintenance and dredging of our nation’s ports and harbors.  The Corps’ budget has remained stagnant, yet dredging costs continue to increase.

Comparative Dredging Costs (Increases From FY 2005 to FY 2008) FY 2005:FY 2008: Contract #5-04 Opened: 12/7/04Contract #1-08 Opened: 2/12/08 GE $1,768,415GE $3,558,860 Manson $1,874,425Manson $3,075,800 Weeks $2,523,415GLD&D $3,936,300 GLD&D $2,965,928Weeks $4,042,410 Contract #6-04 Opened: 12/13/04Contract #3-08 Opened: 3/12/08 GE $2,152,796GE $3,672,105 Manson $2,187,125Weeks $4,157,350 Weeks $2,662,132GLD&D $4,189,180 GLD&D $2,975,000 Contract #3-05 Opened: 1/6/05Contract #5-08 Opened: 3/25/08 GE $2,218,332GE $3,927,408 Bean $2,550,250GLD&D $4,789,220 Weeks $2,853,515 GLD&D $3,025,182

Realize America’s Maritime Promise Harbor Maintenance Trust Fund Fairness Coalition

The Reality

RAMP Members Added with the Assistance of GSMA  *AMERICA’S ENERGY COAST  Associated Branch Pilots of the Port of New Orleans (Bar Pilots)  Associated Federal Pilots and Docking Masters of Louisiana  Association of Ship Brokers and Agents (ASBA)  Calcasieu River Waterway Harbor Safety Committee  Crescent River Port Pilots Association  Gulf Intracoastal Canal Association  International Freight Forwarders and Customs Brokers Association of New Orleans (IFFCBANO)  Lake Charles Harbor and Terminal District  Lake Charles Pilots  *LAKE PONTCHARTRAIN BASIN FOUNDATION  Lower Mississippi River Waterways Safety Advisory Committee (LMRWSAC)  Maritime Exchange for the Delaware River and Bay  Maritime Navigation Safety Association  Mobile Bar Pilots Association  National Association of Maritime Organizations  National Customs Brokers and Forwarders Association of America  New Orleans Board of Trade  New Orleans-Baton Rouge Steamship Pilots Association (NOBRA)  NSA Agencies, Inc.  Port of Morgan City  Port of New Orleans  Port of South Louisiana  Propeller Club of New Orleans  State of Louisiana  US Steel Corp  West Gulf Maritime Association  World Trade Center of New Orleans

Louisiana Specific Issues “The HMTF is primarily dedicated to maintenance dredging of navigation channels, but other projects that can be funded by this Trust Fund include: maintenance of jetties and breakwaters; the Federal share of constructing Dredged Material Placement Facilities (DMPF), as required by Federal harbor and channel O&M; operation and maintenance of DMPFs and projects for the mitigation of impacts on Federal navigation projects on nearby shores; dredging of contaminated sediments in, or those affecting, Federal navigation harbors and channels; and projects for the beneficial use of dredged material.” As provided by Jim Walker, Chief of Navigation, U.S. Army Corps of Engineers

Beneficial Use of Dredge Material  For years the Corps and the maritime industry have had to argue against restoration via beneficial use of dredged material because dedicated funding was not available for the substantial additional costs. Through pursuing the full use of the HMTF, significant additional funds can be dedicated. The beneficial use of dredge material offers a chance to recycle the earth flowing down the “Economic Superhighway” that is the Mississippi River.  The full use of the HMTF will add about $800 million nationally to the Corps’ annual budget. There should be sufficient funding to assist with beneficial use and other restoration type projects.

Other Louisiana Restoration Efforts  Over the last few years, because there was not significant funding to dredge and maintain fully authorized dimensions, the Crossings on the Lower Mississippi River have been maintained at half width for the summer months. This year the NOBRA Pilots were forced to enact transit restrictions because of this reduced width.  South Pass remains a federally authorized channel with the established dimensions of 30’ by 450’. Based on the reduced need of the Channel, the Corps revised the depth to be maintained to 17’. However, the controlling depth is presently 6’ at Mile 13 because this Channel has not been maintained due to the lack of allocations from the HMTF for the Corps to dredge this Channel. If this Channel was maintained, the beneficial use of material could represent significant marsh creation. The pattern of under funding our nation’s waterways continues to force the Corps to decide which projects are more important and represents the greatest return on the investment.  Over the past few years, hopper dredge pumpout in Southwest Pass has been discussed. Because of a subcommittee I established, and because of the recent work with various state and federal agencies, a workable plan exists. However, the hold up has been securing additional funds for extra costs associated with slower pumpout times and the need for additional equipment and labor. If full allocation becomes the status quo, this, too, would qualify for use of the HMTF.

What RAMP Has Done  Gathered coalition members – more than 100 organizations – and the list continues to grow  Successfully garnered the support of the American Association of Port Authorities (AAPA)  Prepared information papers and submitted “Dear Colleague” letters to the U.S. Senate and House of Representatives  Met with House and Senate members and staff on Capitol Hill  Testified before T&I Subcommittee

RAMP’S Goal To establish a legislative firewall around the Harbor Maintenance Trust Fund and insure it is used for its intended purpose—the operation and maintenance of Federal ports and harbors.