22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

André Augustinus 22 June 2004 DCS Workshop Status on services controls.
1 DCS Cost DCS Workshop L.Jirden u Central DCS cost u Detector DCS cost.
The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Slide 117 th DCS Workshop – October, 10Francesca Poggio ZDC DCS Status Report Francesca Poggio Università degli Studi di Torino INFN, sezione di Torino.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
TB Peter Glässel, Heidelberg1 TPC Progress.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
TPC laser DCS status at NBI by Gaël Renault reported by B. S. Nielsen 6 Oct 2005.
ATLAS MDT HV – LV Detector Control System (DCS)
Alice TPC DCS.
TPC Detector Control System
The Online Detector Control at the BaBar experiment at SLAC
Presentation transcript:

22. January 2007U. Frankenfeld1 TPC DCS Pre-commissioning Final system

22. January 2007U. Frankenfeld2 Pre-commissioning Hardware PVSS Supervisory Layer / FSM HV –3 Module Iseg LV –2 PL500/F8 Temperature Monitoring –500 Sensors read-out by 18 ELMBs VHV –Heinzinger incl. PLC/PVSS/FSM FEE –12 Readout Partitions (2 sectors) Laser –Laser control –Mirror control Gas system –GWG / IT-CO

22. January 2007U. Frankenfeld3 Commissioning Hardware stand alone Drift Velocity Monitor FEC cooling Pulser PS

22. January 2007U. Frankenfeld4 Pre-commissioning Cooling System (concept similar to final set-up) After water accident All sensitive area at under pressure ΔT ~ 1 K in each sector System has been optimized for safe operation even with large leaks (silicon hose) Pressure in the reservoir: > 350 mbar, < 380 mbar Interlock: 400 mbar Interlock action: 1.turns circulation pump off 2.generates alarm 3.starts procedure to turn off electronics Electronics Cooling System

22. January 2007U. Frankenfeld

22. January 2007U. Frankenfeld6 Water spill from under pressure system? Reservoir Circulation Pump Vacuum Pump Sector Squeezed hose Air bubbles Over pressure

22. January 2007U. Frankenfeld7 Pressure (single sector) Bypass (or 2 nd sector) needed to limit max pressure at sector Flow: 10 l/min –Hydrostatic pressure in sector 13 Bypass Valve in serial

22. January 2007U. Frankenfeld8 Pressure drop in Sector

22. January 2007U. Frankenfeld9 Summary Cooling Save operation with two sectors (opening of one hoses tested) –Hoses –Bypass (one sector) –Alarm settings Visual alarm –Triggered by flow meter –System stops flow in case of alarm Final system: –One pressure sensor at the inlet of each cooling sector –Signal read-out by DSS system-> used as interlock to stop circulation pump

22. January 2007U. Frankenfeld10 Temperature Sensors 500 calibrated PT ELMBs Display with color code and auto scaling Trending of selected probes Display of history data

22. January 2007U. Frankenfeld11 Sensor Calibration

22. January 2007U. Frankenfeld12 Temperature monitoring

22. January 2007U. Frankenfeld13 History

22. January 2007U. Frankenfeld14 Trending Δ T ~ 1K

22. January 2007U. Frankenfeld15 Pre-commissioning Summary Cooling –Additional presure sensores -> Interlock Temperature Monitoring –Working LV –Pl500 F8 used +ok HV –Control software for Iseg: ok –Combination PS – Chamber with serial resistor FEE -> next talk –Connection Intercom Layer -> PVSS installed Needs to be tested and debugged

22. January 2007U. Frankenfeld16 Pre-commissioning Summary VHV –ok Laser –Laser control and tracker used –Frame grabber for cameras –Mirror control tested Gas system –Operated very well –Updates/bug fixes during pre-commissioning Drift Velocity Monitor –Put in operation Pulser PS –Operated manually Next step –Installation + Commissioning

CR4-Z08 UX-C/D CR4-Z08 ACC UX-A,B,C CR4-Y08 Chambers ISEG PVSS II Chambers Wiener Ethernet User interface Database(s) RCU OPC client DIM client PVSS II Chambers, detector ELMB PVSS II HVrod Heinzinger 1 High Voltage Low VoltageFEETemp. MonitorVery High Voltage TPC (1) CE HVLV E C HV S [FSM?] Control room (ACR) 06/03/13 Ethernet switch E E DIMsrv DDL HVrod ELMB 12 VHV Curr. Monitor C CR3 PCI-CAN ISEG OPCserver PVSS II OPC client 1 ACC 1 CR3 Wiener OPCserver PVSS II OPC client CR3 PCI-CAN ELMB OPCserver PVSS II OPC client 18 CR3 [FED] DIMserver DIMclient CR3 PVSS II DIMclient ACC 12 UX-C08/D16 Chambers Gating pulser 72 Calibr. pulser CR3 PVSS II Virtual Serial Eth.-RS232 E PS 2 Pulser system 216 PLC 1 Modbus/TCP E 2612

LHut CR3 [Motion] [Laser] CR3 SG2 CR5 SG2 CR3 UX-C Ethernet TPC (2) VHV rod Cooling Thermal Screen(s) PLC 18? Thermal Screen(s)Laser calibration system. Mirror control Video cameras Gas system PLC Gas E HVrod 4 Cooling Plant (TS) Detector PVSS II DIP [TS/CV] [GWG] Cooling Plant (ch) PLC Chamber Cooling E Chambers, detector 40 PVSS II Modbus/TCP TS/CV SCADA 11 Gas CR3 [Vision] DIMserver/ filesystem Video In CR3 PVSS II DIMclient Eth.-RS232 DIMserver virtual serial Mirror adj. Spectron laser E Video Drift velocity mon. SG2 PVSS II RS232 DIM client Heinzinger Analysis DIMsrv Gas PVSS Trig Board (STAR) 06/03/13

GasD Crate OROC HV IROCMISC Ch ROCLASERTEMPFC TPC GPulser VHVRCool Ch Ch Ch TSen Gating PS Ch CalibP CPulser Ch PS Ch Screen SSWCone LaserC PSCalib MirrorC ImageMirror 36x(2x) 36x10x98x??x72x??x +500x GasDCO 2 ROC Detector Hierarchy overview GAS D mon FERO ESC ECoolLV FED RCU x ESC x …

GasD Prototype Prototype in progress Crate OROC HV IROCMISC Ch ROCLASERTEMPFC TPC GPulser VHVRCool Ch Ch Ch TSen Gating PS Ch CalibP CPulser Ch PS Ch Screen SSWCone LaserC PSCalib MirrorC ImageMirror 36x(2x) 36x10x98x??x72x??x +500x GasDCO 2 ROC Detector Hierarchy overview GAS D mon FERO ESC ECoolLV FED RCU x ESC x …