David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 The TRD Ethernet network at Point 2 David Emschermann Physikalisches Institut Universität Heidelberg.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
ZMQS ZMQS
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
Presentation transcript:

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 The TRD Ethernet network at Point 2 David Emschermann Physikalisches Institut Universität Heidelberg updated

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 Outline Ethernet network status Ethernet network status Locations of TRD Netgear switches Locations of TRD Netgear switches IP allocation for TRD DCS boards IP allocation for TRD DCS boards IP allocation for Wiener LV PS IP allocation for Wiener LV PS

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 Ethernet network preliminary Ethernet infrastructure preliminary Ethernet infrastructure available since autumn 2006 available since autumn 2006 Ethernet backbone installed by IT, Ethernet backbone installed by IT, to be finalized by end of January 2007 to be finalized by end of January 2007 TRD Netgear switches partially installed TRD Netgear switches partially installed Ethernet cables to the SMs half finished Ethernet cables to the SMs half finished Christian detected 25% bad connections in Christian detected 25% bad connections in DCS Ethernet cables of sector 13, A-side DCS Ethernet cables of sector 13, A-side

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 TRD rack locations 19 SPD EXD 4/29 EXD 5/29 MTR TOF TRD TPC Sniffers T0 TS/EL ACO FMD TRD TOF 7 0 MTR TOF SPD EXD 2/29 MCH TPC TRD TRI EXD 3/ Beam Vacuum MCH EXD 6/29 EXD 7/29 MTR TOF TRD TPC SSD SPD TRD TOF HMP SSD TS/EL HMP PHS SPD TPC PMD TRD TOF TRD TOF Sniffers TPCTOF SDD SPD CPV SSD 21 SSD EXD 1/29 TRD SDD TRD TS/EL Vacuum TS/EL V0 TS/EL Beam TRI EMC MTR TRI MCH LV CP GP LV SP RO LHV LV TR RO LV TRLV HVCO LV CO LHV COLV SPRO SPLVCO LV HV GAS LV PWRSIG LV SP LV SPRO DET SP CP GP LV CTP LV CTP mult CT LV A I O C L3 Magnet LV racks containing TRD equipment

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 Switch locations 19 SPD EXD 4/29 EXD 5/29 MTR TOF TRD TPC Sniffers T0 TS/EL ACO FMD TRD TOF 7 0 MTR TOF SPD EXD 2/29 MCH TPC TRD TRI EXD 3/ Beam Vacuum MCH EXD 6/29 EXD 7/29 MTR TOF TRD TPC SSD SPD TRD TOF HMP SSD TS/EL HMP PHS SPD TPC PMD TRD TOF TRD TOF Sniffers TPCTOF SDD SPD CPV SSD 21 SSD EXD 1/29 TRD SDD TRD TS/EL Vacuum TS/EL V0 TS/EL Beam TRI EMC MTR TRI MCH LV CP GP LV SP RO LHV LV TR RO LV TRLV HVCO LV CO LHV COLV SPRO SPLVCO LV HV GAS LV PWRSIG LV SP LV SPRO DET SP CP GP LV CTP LV CTP mult CT LV A I O C L3 Magnet LV 581 DCS boards 5 IP ranges 89 Wiener PS 64 / / 6 IPs/SW 512 IPs 9 SW 512 IPs 9 SW 4 IP ranges 31 Netgear switches

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 Ethernet infrastructure rack O08

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 IP address definitions IP addresses defined in 3 files for : 540 DCS boards inside the super modules 41 DCS boards outside the super modules 41 DCS boards outside the super modules (GTU, HVDS, PCU, Pretrigger) (GTU, HVDS, PCU, Pretrigger) 89 Wiener LV PS 89 Wiener LV PS

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 DCS board IPs inside the SM sector08s1l2 alidcsdcb0248 alitrddcb0812 location hostname alias rack IP address DCS S/N MAC I dcs :ea:54:00:01:98 must start with 02: SMint name 5 networks sequential from 0000 to 0539 alitrddcbXX..alitrddcb..YY – SM no no in SM

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 DCS board IPs outside the SM hv_crate02 alidcsdcb0702 alitrddcb1902 location hostname alias rack IP address DCS S/N MAC O dcs :ea:54:00:03:39 must start with 02: SMint name 5 networks in the range of 0600 to 0900 alitrddcbXX..alitrddcb..YY – SM no sequential no

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 DCS naming outside the SM GTUHVDSPCUPretrigger - alitrddcb180… - alitrddcb190… - alitrddcb200… - alitrddcb201… IP addresses for : CERN wont allow fancy settings in DHCPD : no FEE_SERVER_NAME via DHCP no FEE_SERVER_NAME via DHCP no DIM_DNS_SERVER via DHCP no DIM_DNS_SERVER via DHCP

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 Wiener LV PS naming status hostname alias IP address I-T alidcswie040 alitrdwie cable connected location SM08-A1.8V-P-L01-O TRDU2YO :50:C2:2D:C3:1C MAC address serial no installedconfiguredtested in the range 000 to 099 alitrdwieXX. – no SM, 18 GTU, 20 PT 18 GTU, 20 PT

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 IDs of Wiener LV PS for 1 SM A1.8VD1.8V 1x D1.8V 3x A3.3V 3x +1x DCS alitrdwie..Y alitrdwie..0 alitrdwie..1 alitrdwie..2 alitrdwie..3 alitrdwie..4

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 Summary IP addresses for TRD are defined IP addresses for TRD are defined final Ethernet network in UX25 available final Ethernet network in UX25 available end of January end of January Netgear switches are being installed Netgear switches are being installed TRD Ethernet cables need to be tested TRD Ethernet cables need to be tested

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 Thank you

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 Backup