Summer 2010 Technology Projects. K-6 Pods 88 Pod Rooms - 352 Computers unboxed/imaged and installed in classrooms 88 Pod Rooms - 352 Computers unboxed/imaged.

Slides:



Advertisements
Similar presentations
Construction Report July 28, Projects KMS Phase IIClose out –KMS CafeteriaClose out –KMS Renovations & AdditionsClose out –Royalwood Elementary.
Advertisements

District Information Technology Update Report Late August 2014 Complied By: Stephen Torrey
Resolution Categorization
Information Technology Update Presented by: Mr. Roger Botti Mr. Roger Botti Mr. Sean Flaherty Mr. Eric Treater Mr. Robert Tozier 8/25/2010.
Solution to all your I.T. needs. Information Technology Needs HARDWARE MANAGEMENT CYBER CRIME SOLUTIONS DATA RECOVERY WEBSITE DESIGNING I.T. SECURITY.
CISCO IP TELEPHONY Phone System, 2 Years Later. Presented By: John Nickell, Technology Director and Bill Koegle, Technology and Network Specialist. North.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
Planning and Selecting a Digital Language Lab
Waterloo Local School District Technology Lab Presentation 2009.
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
Faculty Assembly Report Information Resources November 2010.
Technology in Roundup Public Schools Approximately 50 to 60 total computers and 30 printers in the District 20 iMac Plus--High School.
What is a Computer Network? Two or more computers which are connected together.
1 Soft Phone Installation and Registration Step by Step Instructions By Prof. Valencia Community College.
Technology UAA. Who We Are & What We Do IT Services provides technology leadership, planning, and a wide range of services supporting UAA’s.
And how they are used. Hubs send data to all of the devices that are plugged into them. They have no ability to send packets to the correct ports. Cost~$35.
Technology Projects January 1 – March 31, 2012 MEASURE I CITIZEN’S OVERSIGHT COMMITTEE QUARTERLY MEETING.
ActEyes IP Cam Training Part 1: Camera Setup. Network Setup Overview Each IP Cam on the network will need its own IP address to be assigned. This address.
Natick Public Schools Technology Update September 11, 2006 Dennis Roche, CISA Director of Technology.
Media Center Gymnasium Gym Cougar Cafe KK KK Storage Book room Art K MusicAutism 2nd 3rd2nd Stor age EIP 3rd2nd 3rd 1st EIP SpEd OT/Sp Ed SpEd 2nd EIP.
Using Microsoft Network Access Protection to test Dr.Web anti-virus software The workstations successfully checked by NAP can be used in a corporate network.
EWU Telecommunications ( EWU Telephone Systems Upgrade What This Project Does For You…
Untethered Walk around your classroom with your Laptop, with no cables connected!
» What is a network? A network is a group of two or more computer systems linked together. A network consists of two or more computers that are linked.
Expanding and Improving the Technical Infrastructure of the Atlanta Day Shelter for Women and Children Project Advisor Whit Smith Group Members - Taylor.
Tech Council College of the Siskiyous Tuesday October 29 th 2002.
DECS Community IT DIVISION OF ENGINEERING COMPUTING SERVICES Michigan State University College of Engineering.
Who... What... Where Sorting out CIT, departmental technology support, and how we all work together.
Who... What... Where Sorting out CIT, departmental technology support, and how we all work together.
DUE Voice over IP (VoIP) Linksys Ernie Friend- FSCJ.
Updated Technology Purchase Plan Purchases to be split between the remaining funds in ($52,000) and the capital request for ($60,000) Projects.
Getting the Most Out of Clemson Smart Classrooms Bill Moss UCF-Dell Laptops in the Classroom Conference February 2, 2000 College of Engineering and Science.
Natick Public Schools Technology Update April 23, 2007 Dennis Roche, CISA Director of Technology.
Education & Technology Integration ED205 - Computers in Education.
A.W. Beattie Career Center Technology Plan March 6, 2008 Joe Miller.
Technology Improvements for the Grafton 2000 referendum.
A.W. Beattie Career Center Technology Plan March 6, 2008 Joe Miller.
NAGE IT REPORT December 2015 MICHAEL ARIAS – IT DIRECTOR.
"Agenda" Items -Network advantages and restrictions -What to do about Freeze-ups (applications, computer) -Knowing your configuration (memory, speed, drive.
Ideas for Tech Policy at AISM 20.nov.2010 Karen, Mark, Ana, Clare, Sarah with notes from other groups.
Our Mission. Computer Purchasing Website Design and Development Services.
Welcome! Thank you for coming!. Thank you for Choosing Sacred Heart Opened in 1960 under the Irish Order of the Sisters of Mercy. Out of 29 schools in.
21 st Century Classroom Learning Environment Installation Process.
 Support for HP Printers  Norton Antivirus Support  Apple iPhone Support  Support (Outlook, Hotmail)  MAC Computer Support.
IT Department Introduction
Center for Advanced Technology and Training CATT Room Instruction Demo
Supporting Windows 8.1 Krystle Portocarrero | Training Experts Inc.
Configuring Attendant Console
Classroom support 2018 update – 2019 preview
For More Information Visit On this Website :-
Alienware Phone Number for quick help for solving the Problems. Dial the Alienware support Phone Number for Quick solutions for Dell.
Malwarebytes Support Service Number
Reinstallation or Repairing Software
Support for Malwarebytes Updation Issues
Malwarebytes Update Problem Number
Welcome Hp printer tech support number
ITMI Computer Lab Renewal GBA 573 Summer 2004 Jeffrey Preston
Library Status Updates and Request
Adobe Connect: Web Conferencing, Collaboration, and Teaching Online
Digital Commons Furniture Proposals for Single, Dual, Group, and Collaborative Arrangements in the ULM Library.
Measure E Technology Update
Network Models, Hardware, Protocols and number systems
How Computers Work.
Configuration Of A Pull Network.
John Thomas Dimitropoulos Team and website: Lostoneprodigy.com
Park Place Wesleyan Gala 2019
Washburn School District Technology 2012
What about our Network!? Brainstorm 2019
AKSUM UNIVERSITY ICT Directorate Oct 10, 2018 Axum, Tigray, Ethiopia
Presentation transcript:

Summer 2010 Technology Projects

K-6 Pods 88 Pod Rooms Computers unboxed/imaged and installed in classrooms 88 Pod Rooms Computers unboxed/imaged and installed in classrooms Installed/Cabled network connections in all 88 classrooms Installed/Cabled network connections in all 88 classrooms Configured network switching for all classrooms as well as at the building level for both pods and IP Phones. Configured network switching for all classrooms as well as at the building level for both pods and IP Phones.

Voice Upgrades Installed over 400 New IP Phones at K-6 Installed over 400 New IP Phones at K-6 Updated Cisco CallManager (Phone System) and Cisco Unity(voice mail) servers Updated Cisco CallManager (Phone System) and Cisco Unity(voice mail) servers

MHS Labs Setup 5 business labs in MHS, 1 Adult Ed lab, 1 World Language lab, Math/Science Lab Setup 5 business labs in MHS, 1 Adult Ed lab, 1 World Language lab, Math/Science Lab Cabled for new connections and for changes in classroom layouts Cabled for new connections and for changes in classroom layouts Installed computers and tables in all rooms (256 computers,136 Tables) Installed computers and tables in all rooms (256 computers,136 Tables) Imaged computers with appropriate lab software Imaged computers with appropriate lab software Setup projectors and screens in MHS D106, D108, D110, D112, D114, CD102N, CD101S Setup projectors and screens in MHS D106, D108, D110, D112, D114, CD102N, CD101S

MHS B104, B110, B112, B114, A109, A111 Removed all computers and old tables Removed all computers and old tables New Carpet was installed in rooms and new computer tables were then installed (68 Tables) New Carpet was installed in rooms and new computer tables were then installed (68 Tables) Computers were re-installed into rooms, network connections were repaired and computers have been re- imaged with new updates. Computers were re-installed into rooms, network connections were repaired and computers have been re- imaged with new updates.

Moving around at Iddings and Miller All labs at Iddings and all classrooms with existing pods needed to be dismantled for installation of new carpet. All labs at Iddings and all classrooms with existing pods needed to be dismantled for installation of new carpet. Rooms at Miller needed to be dismantled in order for new carpet to be installed. Rooms are back together at this time. Rooms at Miller needed to be dismantled in order for new carpet to be installed. Rooms are back together at this time.

Software Updates and Installations All staff computers in K-6 have been updated with IE 8 and other needed updates to allow for operations of new software purchased for pods. The remaining buildings will be updated in the very near future. All staff computers in K-6 have been updated with IE 8 and other needed updates to allow for operations of new software purchased for pods. The remaining buildings will be updated in the very near future. Installation of Compass Odyssey servers and software Installation of Compass Odyssey servers and software Installation of FastMath software for pods Installation of FastMath software for pods Installation of Academy of Reading software for pods Installation of Academy of Reading software for pods

MHS Freshmen Center Labs updated with needed software for access to Plato PLE 2.0 updated with needed software for access to Plato PLE 2.0

Items planned for completion before the start of school Iddings is being worked on at this time and will be completed before the start of school. Pods, Phones, etc… Iddings is being worked on at this time and will be completed before the start of school. Pods, Phones, etc… Pierce Labs updated with needed software for access to Plato PLE 2.0 Pierce Labs updated with needed software for access to Plato PLE 2.0 Re-Image K-6 Labs Re-Image K-6 Labs Read 180 Rooms at MIS moved to new classrooms upstairs Read 180 Rooms at MIS moved to new classrooms upstairs

Upcoming Projects MIS Lab 101 New computers and furniture MIS Lab 101 New computers and furniture Kindergarten pod installation 19 Rooms Kindergarten pod installation 19 Rooms Freshmen Center Science lab computers (40) Freshmen Center Science lab computers (40) Projector/Document Camera install for grades 1-6 Projector/Document Camera install for grades 1-6 MCSC website upgrades MCSC website upgrades Incompatibility with old and new Plato at MHS Incompatibility with old and new Plato at MHS