LHC Experimental Areas Forum - 03/07/2006 1 ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.

Slides:



Advertisements
Similar presentations
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
Advertisements

Cryogenic Experts Meeting (19 ~ ) Helium distribution system for Super-FRS dipoles and multiplets MT/FAIR – Cryogenics and Magnets Y. Xiang,
Design pressure issues of Super-FRS dipole CrYogenic Department in Common System (CSCY), GSI, Darmstadt Yu Xiang, Hans Mueller* * Primay Beam Magnet Technology.
ESS Cryogenic System Design
ITER Cryoplant System Status
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
CRYOGENICS AND POWERING
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
N.Delruelle, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Design choices.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
TE-CRG Activities D. Delikaris, TE-CRG.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days U. Wagner, CERN.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
Internal review of superconductors and magnet laboratories 2nd part: SM 18 & b.163: current status, weak points, possible improvement Cryogenics Vladislav.
Refrigeration of Superconducting Solenoids T W Bradshaw Rutherford Appleton Laboratory Harwell Science and Innovation Campus Didcot, OX11 0QX, UK
Final Design Cryogenic and mechanical configurations
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
Study and Development of Large Cryogenic Systems in China
Process Simulation for the LCLS-II Cryogenic Systems
Z. W. Zhou, Q. Y. Zhang*, X. F. Lu, L. B. Hu and P. Zhu
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
Proximity Cryogenics P&IDs Meeting
Cryogenic behavior of the cryogenic system
HFM Test Station Main Cryostat
Innovative He cycle Francois Millet.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
on behalf of FCC cryogenic team
Mathew C. Wright October 2016
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
Hall D Cryogenic requirements
CTF Users’ Perspective
Cryogenic behavior of the magnet
Thermohydraulic behaviour of the cryogenic system
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group

LHC Experimental Areas Forum - 03/07/20062 Outline ► Introduction ► External & proximity cryogenics installed for ATLAS ► Next steps for the helium cryogenics

LHC Experimental Areas Forum - 03/07/20063 Introduction (1) ► The cryogenic system for a superconducting magnet can be divided into:  Internal cryo = cooling system of coils, thermal shields, feedthrough;  Proximity cryo = all auxiliary equipment necessary for magnet operation (e.g. current leads, liquid He pumps, distribution valves, buffer dewar, etc.);  External cryo = helium refrigerators / liquefiers producing helium from 300K to 4.5 K. ► Cryogenic tasks:  Magnets cool-down;  Magnets steady-state operation at 4.5 K (with current ramping up/down);  Thermal recovery after a fast dump.

LHC Experimental Areas Forum - 03/07/20064 Introduction (2)

LHC Experimental Areas Forum - 03/07/20065 Introduction (3) ► Why 2 helium fridges and not only 1 (like for CMS) ?  Main Refrigerator (Air Liquide) was existing at SM18 and could be re-used for ATLAS;  But insufficient to cope with the big thermal-shield loads between 40 K and 80 K and with magnets cool-down time; => we bought a new fridge solely dedicated to cope with the cool-down (with the help of LN 2 ) and with thermal shields. ► Advantages of this splitted solution:  Important cost reduction (we bought only 1 refrigerator);  The new one has been specified to have a simpler process than the existing one => higher reliability;  During winter shut-down, the new Shield Refrigerator can have a maintenance time twice shorter than the Main Refrigerator and keep ATLAS shields temperatures < 80 K.

LHC Experimental Areas Forum - 03/07/20066 Outline ► Introduction ► External & proximity cryogenics installed for ATLAS ► Next steps for the helium cryogenics

LHC Experimental Areas Forum - 03/07/20067 External & Proximity Cryo (1) ► Shield Refrigerator (Linde):  Functionalities: Cool-down from 300 K -> 100 K of all magnets (660 tons); 60 kW power required for 1 month => boosted by use of LN 2 ; Then, maintain thermal shields between 40 K and 80 K; 20 kW power required without LN 2 (i.e. only with turbines).  Components: 2 identical screw compressors: mass flow = 2 x 160 = 320 g/s; In normal shield cooling, 2 nd compressor in stand-by for redundancy; Cold box with 2 turbines in series + LN 2 precooler.

LHC Experimental Areas Forum - 03/07/20068 External & Proximity Cryo (2)

LHC Experimental Areas Forum - 03/07/20069

10 External & Proximity Cryo (3) ► Main Refrigerator (Air Liquide):  Functionalities: Cool-down from 100 K -> 4.5 K of all magnets (660 tons); Then, maintain the cold masses at 4.5 K and supply 11.2 g/s of liquid Helium for the current leads cooling; Equivalent power of K.  Components: 5 screw compressors: 4 boosters + 1 high-stage for a total mass flow = 500 g/s; Cold box with 3 turbines: 2 in series + 1 supercritical.

LHC Experimental Areas Forum - 03/07/ External & Proximity Cryo (4)

LHC Experimental Areas Forum - 03/07/ External & Proximity Cryo (5) ► 2 types of cooling principle for the toroids and for the solenoid => 2 independant Proximity Cryogenics  1 centrifugal pump providing 1.2 kg/s (≈ 10 L/s) of helium forced-flow to keep the toroids at 4.5 K;  Supercritical helium flow provided directly by the fridge at 2.6 bar for the solenoid having a simple cylindrical shape. (cooling in thermosiphon mode is also possible). ► Proximity cryogenics for the toroids (RAL collabor.)  Consists of: distribution valve box with its phase-separator, a current lead cryostat, a pump cryostat (with 2 pumps) and a 11’000 L buffer Dewar;  Each pump provides a mass flow of 1.2 kg/s with a pressure head of 400 mbar.

LHC Experimental Areas Forum - 03/07/200613

LHC Experimental Areas Forum - 03/07/ External & Proximity Cryo (6) ► Proximity cryogenics for the solenoid (KEK)  Consists of: control Dewar housing the 8 kA current leads and a valve unit with the instrumentation & control valves;  Control Dewar is placed in the cavern at the top of ATLAS detector (13 m from the central axis);  Complete system successfully tested in Point 1 in May 2006.

LHC Experimental Areas Forum - 03/07/200615

LHC Experimental Areas Forum - 03/07/ Distribution Valve Box Phase-separator & centrigufal pumps 11’000 liter buffer dewar

LHC Experimental Areas Forum - 03/07/ Outline ► Introduction ► External & proximity cryogenics installed for ATLAS ► Next steps for the helium cryogenics

LHC Experimental Areas Forum - 03/07/ Next steps for the He cryogenics ► Cool-down of the Barrel Toroid and the Solenoid (July 2006); ► Replacement of some faulty electrical heaters inside SR cold box after BT test (autumn 2006); ► Possible upgrade of Air Liquide turbines after BT test; ► Test at 4.5K of End-Cap ‘A’ alone in Point 1 (December 2006) after surface-test at 80 K in West Area; ► Test at 4.5K of End-Cap ‘C’ alone in Point 1 (March 2007) after surface-test at 80 K in West Area; ► First cool-down of the complete ATLAS detector in Point 1 during May-June 2007.