Plan 2 – Dead-end Seal Chamber Optional Jacket

Slides:



Advertisements
Similar presentations
Steam and Water Accessories
Advertisements

Chapter 4 Air-Conditioning Components
START-UP AND OPERATION OF MECHANICALLY SEALED EQUIPMENT 1:13.
ADX 150 – Engine Repair ADX 170 – Climate Controls
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Refrigerators.
Unit 206: Domestic hot water systems
General System Maintenance BUS 4 COMPONENT FLOW.PPT
JET PROPULSION Part 5 Jet Engine Operation Oil Systems.
STEAM TRAPS.
Refrigeration Flow Control
Proposed Modifications in Boiler Feed Tank By: D K Singhal
Unit 206: Domestic hot water systems
Filling, purging and air removal
Glycol Pumps Operating Pressure: 100 to 1500 psi Circulation Rate: 3 to 450 gph.
Aero Engines 9.02 Oil & Fuel References: FTGU pages
Unit 206: Domestic hot water systems
2 July Turbine Condensate System
Pump Installation Vigyan Ashram, Pabal.
COMMERCIAL REFRIGERATION
What is going on inside a packed stuffing box?
Heat exchangers The device at which heat exchange between two fluids at different temperatures and separated by a solid wall occurs is called heat exchanger.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Hydronic Mechanical Controls
Air Compressors.
OZONE DRINKING WATER SYSTEM. CONTENTS Properties of Ozone Production of Ozone Water Treatment Plant – 25 m 3 /hr Ozone Generation System.
Hydraulics For The Long Term
Glycol Pumps Operating Pressure: 100 to 2000 psi Circulation Rate: 3 to 450 gph.
1 Fuel Pumps. 2 Pumps 1.All oil burners for residential heating have pumps A. They are connected to a motor through a coupling 2.Description A. An oil.
P&ID Design and Equipment Selection
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
INTRODUCTION Definition:
Unit 208: Central heating systems
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only.
WATER COOLING SYSTEM. 1.HEAT SOURCES  Burning of fuel  Heat developed by compression of air  Frictional heat.
LESSON THIRTEEN LUBRICATING OIL SYSTEM. 1.PRIMARY PURPOSE OF LUBRICATION To keep a clean layer of lubricating oil film / luboil film between the contacting.
1 Agricultural Power Systems Identifying Engine Systems and Their Components.
Introduction to Energy Management
OILGEAR PVV PUMPS PVV 200 Performance Curves.
Chapter 39 Cooling System Fundamentals.
Title VERTICAL SUMP PUMPS, CPXV or ECPJ
Purgers and Non-condensables “What are they and why should I care?” Refrigerating Specialties Division Parker Hannifin Corporation July 2004.
Air Compressors Capacity Horsepower Pressure Duty Cycle.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Plant & Reactor Design Passive Reactor Core Cooling System
CENTIFUGAL PUMP OPERATION
Temperature Test Allows monitoring of temperature changes.
Lesson 7 Steam Power Plant.
Chapter No-5 STEAM CONDENSERS AND COOLING TOWERS Marks-16
Condensate Management
Fluid Statics/Dynamics
System One Pumps S1-101 Construction and Features
EXECUTIVES & NON-EXECUTIVES
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
SB Packing Automatic Downpuller Power Unit
Hot Water Systems Cylinders and Systems.
STEAM CONDENSERS AND COOLING TOWERS Marks-16
BASIC PNEUMATICS.
System One Pumps Selecting Centrifugal Pumps S1-201
HAZOP Guidewords Base Set
Tracer Applications.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
AIR COMPRESOR Chapter-13.
Presentation transcript:

Plan 2 – Dead-end Seal Chamber Optional Jacket What Dead-ended seal chamber with no flush. Why Simplicity - no environmental controls. Where Large bore/open throat seal chambers in moderate temperature services. Cooling jacket seal chambers in high temperature services. Clean fluids. Top-entry mixers/agitators with dry seals. Preventative Maintenance Process must have adequate boiling point margin to avoid vaporization. Cooling fluid in seal chamber jacket may be needed at all times in hot services. Often used in combination with steam quench, Plan 62.

Plan 11 - Discharge Recirculation What Seal flush from pump discharge through orifice. Default single seal flush plan. Why Seal chamber heat removal. Seal chamber venting on horizontal pumps. Increase seal chamber pressure and fluid vapor margin. Where General applications with clean fluids. Clean, non-polymerizing fluids. Preventative Maintenance Use an orifice with a minimum 0.125" (3 mm) diameter. Calculate flow rates to size orifice for adequate seal chamber flow. Increase boiling point margin with proper orifice and throat bushing sizing. Flush should be directed over seal faces with piping at 12 O'clock position. Typical failure mode is a clogged orifice - check temperatures at pipe ends.

Plan 12 or 31 – ALTERNATE Traditional: Discharge Recirculation with Strainer or thru Cyclone What Seal chamber circulation created by Spiral Trac. Centrifuged solids are returned to pump suction. Why Solids removal from flush and seal chamber. Seal chamber heat removal. Where Dirty or contaminated fluids, water with sand or pipe slag. Non-polymerizing fluids. Preventative Maintenance Spiral Trac works best on solids with a specific gravity heavier than the process fluid. Seal chamber and application must be acceptable to flush-less Spiral Trac.

Plan 13 - Suction Recirculation What Recirculation from seal chamber to pump suction through orifice. Standard flush plan on vertical pumps. Why Continuous seal chamber venting on vertical pumps. Seal chamber heat removal. Where Vertical pumps. Seal chamber pressure is greater than suction pressure. Moderate temperature fluids with moderate solids. Non-polymerizing fluids. Preventative Maintenance Vent piping loop prior to starting vertical pumps. Use an orifice with a minimum 0.125" (3 mm) diameter. Calculate flow rates to size orifice for adequate seal chamber flow. Reduce seal chamber pressure with proper orifice and throat bushing sizing. Typical failure mode is a clogged orifice - check temperatures at pipe ends.

Plan 14 – Continuous Venting –Vertical Pumps What Seal flush from pump discharge and recirculation to pump suction with orifices. Combination of Plan 11 and Plan 13. Why Continuous seal chamber venting on vertical pumps. Seal chamber heat removal. Increase seal chamber pressure and fluid vapor margin. Where Vertical pumps. Clean, non-polymerizing fluids at moderate temperatures. Preventative Maintenance Use an orifice with a minimum 0.125" (3 mm) diameter. Calculate flow rates to size orifice for adequate seal chamber flow. Increase boiling point margin with proper orifice and throat bushing sizing. Flush should be directed over seal faces. Vent piping loop prior to starting vertical pumps. Typical failure mode is a clogged orifice - check temperatures at pipe ends.

Plan 21 - Cooled Discharge Recirculation What Seal flush from pump discharge through orifice and cooler. Cooler in Plan 11 flush increases heat removal. Why Seal cooling. Reduce fluid temperature to increase fluid vapor margin. Reduce gasket damage. Where High temperature service, typically less than 350° F (177° C). Hot water over 180° F (80° C). Clean, non-polymerizing fluids. Preventative Maintenance Seal cooler and piping must have air vents at highest elevation - vent before starting. Use an orifice with a minimum 1/8" (3 mm) diameter. Calculate flow rates to size orifice for adequate seal chamber flow. Increase boiling point margin with proper orifice and throat bushing sizing. Regularly monitor device inlet and outlet temperatures for signs of clogging or fouling.

Plan 23 - Cooled Seal Recirculation What Seal flush from internal pumping device through cooler. Standard flush plan in hot water services. Why Efficient seal cooling with low cooler duty. Increase fluid vapor margin. Improve water lubricity. Preferred. Most cost effective. Where High temperature service, hot hydrocarbons. Boiler feed water and hot water over 180° F (80° C). Clean, non-polymerizing fluids. Preventative Maintenance - Reference Appendix A Seal cooler and piping must have air vents at highest elevation - vent before starting. Seal chamber requires close clearance throat bushing to isolate process fluid. Regularly monitor cooler inlet and outlet temperatures for signs of plugging or fouling. Process fluids with iron should flow through magnetic separator before cooler.

Plan 32 - Clean Flush What Seal flush from an external clean source. Why Seal chamber heat removal. Process and solids removal from seal chamber. Increase seal chamber pressure and fluid vapor margin. Where Dirty or contaminated fluids, raw water, condensate, chemical treatment. High temperature service. Polymerizing and/or oxidizing fluids. Preventative Maintenance Use throat bushing sized to hold pressure or maintain flow velocity. To restrict dirty process fluid, regulate injection flow rate. To increase fluid vapor margin, regulate injection pressure Injection fluid must be compatible with process fluid. Regularly monitor control system for closed valves or signs of plugging

Plan 53 - Circulation with External Barrier Fluid Tank What Pressurized barrier fluid circulation through reservoir. Fluid is circulated by a pumping ring in the dual seal assembly. Why Isolate process fluid. Zero process emissions. Where Used with dual pressurized seals ("double"). Condensate Dirty/abrasive or polymerizing fluids-Ash handling Mixers/agitators and vacuum service. Preventative Maintenance – Piping loop must self-vent to reservoir located at highest elevation. Pressurize reservoir at all times, maximum gas charge 150 - 200 psi (10 -14 bar). Barrier fluid must be compatible with process. Reservoir level gage indicates both inboard and outboard seal leakage.

Plan 54 - Circulation with External Barrier Fluid and Flowmeter What Pressurized barrier fluid circulation by external system. Why Isolate process fluid. Zero process emissions. Seal cannot induce circulation. Where Used with dual pressurized seals ("double"). High vapor pressure fluids, condensate. Dirty/abrasive or polymerizing fluids-Ash handling. Mixers/agitators. Preventative Maintenance Piping loop must be fully vented before starting. Circulating system must be pressurized and energized at all times. Barrier fluid must be compatible with process. Circulating system level gage indicates both inboard and outboard seal leakage.

Plan 62 - Quench What External quench on atmospheric side of seal. Quench fluids typically steam, nitrogen, or water. Why Prevent solids buildup on atmospheric side of seal. Prevent icing. Where Used with single seals. Oxidizing fluids or fluids that coke, hot hydrocarbons. Crystallizing fluids or fluids that salt out. Caustic. Chemical treatment. Cold fluids less than 32° F (0° C). Preventative Maintenance Quench inlet should be on top of gland with outlet/drain on bottom. Quench pressure should be limited to 3 psi (0.2 bar) or less. Steam to 1 scfm. Use throttle bushing on atmospheric side of seal to direct quench flow to seal drain. Monitor regularly, checking for closed valves, blocked lines, and steam trap condition.