The Rover Concept for the ESA ExoMars Mission

Slides:



Advertisements
Similar presentations
ESWW4, 5-9 th November 2007 Draft Proposal: Space Weather as part of an Optional Space Situational Awareness Programme A.Glover, E. Daly, R. Marsden, A.
Advertisements

1 1 Session 5: Focused DiscussionsMissions in Definition Possible Next Decade Major In-situ Exploration Missions: AFL and Deep Drill Andrew Steele, David.
ESA UNCLASSIFIED – For Official Use ExoMars ESWT#7 9 Dec ESWT # Rover science preparations (RSM, LS) Status, problems, and how we will solve.
6 th International Planetary Probe Workshop, Atlanta, Georgia Short Course on Extreme Environments Technologies 06/ Preliminary - For Discussion.
All rights reserved, 2007, Thales Alenia Space EXOMARS Industry Day Carrier Module Presentation Thales Alenia Space- Italia (Turin)
Mars Invasion: Spirit, Opportunity, Mars Express Meghan McGovern.
The ExoMars Program Marcello Coradini Head, Exploration Office and Coordinator Solar System Missions ESA NOTE ADDED BY JPL WEBMASTER: This document was.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
A Polar Volatiles Laboratory A. Smith, R. A. Gowen, I. A. Crawford Shackleton Crater ESA Smart-1.
Mars EDL CubeSat Mission Jekan Thanga 1, Jim Bell 1 Space and Terrestrial Robotic Exploration Laboratory School of Earth and Space Exploration (SESE) Arizona.
The Lunar Reconnaissance Orbiter (LRO) is the first mission in NASA's Vision for Space Exploration, a plan to return to the moon and then to travel to.
Settlement Site Selection and Exploration Through Hierarchical Roving Gregory Konesky SGK Nanostructures, Inc. Rutgers Symposium on Lunar Settlements Rutgers.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
START! next Today I will teach you about the types of parts I am made of and how I sense this Martian world around me! next Quiz Practice back START!
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
IPPW- 9 Royal Observatory of Belgium 20 June Von Karman Institute for Fluid Dynamics Obtaining atmospheric profiles during Mars entry Bart Van Hove.
Effective Methods for Software and Systems Integration
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
Introduction Low mass, high speed impacting projectiles, performing science investigations from below surface. Objectives: ground truth, unique science.
Dr. Jennifer Rochlis. Overview Build a technology testbed for future rover concepts Develop and demonstrate operations and mission concepts.
Modularly Adaptable Rover and Integrated Control System Mars Society International Conference 2003 – Eugene, Oregon.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Solar System Physics Group Open Day Manuel Grande Aberystwyth in Space – the Moon ExoMars Chandrayaan STEREO Bepi VEX Solar B SDO LoFAR IHY.
Automated Data Acquisition for an Infrared Spectrometer Lauren Foster 1, Obadiah Kegege 2, and Alan Mantooth 2,3 1 Manhattan College, Bronx, NY, 2 Arkansas.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Sample Fetching Rover All rights reserved, 2013, Thales Alenia Space Template reference : K-EN SAMPLE FETCHING ROVER (SFR) FOR MSR Andrea.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
LUNAR ROVER Concept proposal meeting Dr. Ashish Dutta Indian Institute of Technology Kanpur Kanpur, INDIA ( *** for private circulation only)
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
DOC-TAS-EN-002 ALTEC Auditorium - Torino - Italy December 9-10, 2014 Bruno MUSETTI ESWT#7 – ESWT#7.
Back to TITAN 24/06/2008 All rights reserved, 2007, Thales Alenia Space Template reference : K-EN TITAN probes following CASSINI - HUYGENS Denis.
Mars Exploration Rovers (MER) Entry, Descent, Landing, and Deployment.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
NETwork studies of MARS climate and interior A.V.Rodin, V.M.Linkin, A.N.Lipatov, V.N.Zharkov, T.V.Gudkova, R.O.Kuzmin.
Lunar Drilling and Driving Carnegie Mellon December 2007 Red Whittaker.
Titan Saturn System Mission Workshop - Paris, Mar 17-19, 2008 MSSL/UCL UK Penetrators for Enceladus Titan Saturn System Mission Workshop - Paris, Mar 17-19,
ESWT # Rover operations concept
Minimalist Mars Mission Establishing a Human Toehold on the Red Planet Executive Summary DevelopSpace MinMars Team.
On-board Timeline Validation and Repair: A Feasibility Study Maria Fox, Derek Long University of Strathclyde, Glasgow, UK Les Baldwin, Graham Wilson, Mark.
Intelligent Distributed Spacecraft Infrastructure Earth Science Vision Session IGARSS 2002 Toronto, CA June 25, Needs for an Intelligent Distributed.
Universal Chassis for Modular Ground Vehicles University of Michigan Mars Rover Team Presented by Eric Nytko August 6, 2005 The 2 nd Mars Expedition Planning.
The Mars Exploration Program
Seeker kick-off workshop “State of the art” Simon Lacroix Laboratoire d’Analyse et d’Architecture des Systèmes CNRS, Toulouse.
Human Exploration of Mars Design Reference Architecture 5
Mars Exploration Rover Science Goals Determine whether Life ever arose on Mars Characterize the Climate of Mars Characterize the Geology of Mars Prepare.
Turin. ALTEC. DESCENT MODULE AND SURFACE PLATFORM ExoMars Science Working Team
Goals for this Meeting: Day 1 Day 2 Update the community on progress in the exploration of Mars, including NASA and the European Space Agency (missions.
Software used: ArcMap , MatLab R2015b, Google Earth 7.1.5
Science investigations in the framework of expedition to Europa
Astrium ‘Robotics and Autonomy’ Test facilities - hardware and software verification - for 28 Feb 2012 Harwell meeting. Tony Jorden Elie Allouis.
Crew Mobility for Lunar Surface Exploration Dr. Rob Ambrose NASA-JSC May 2008.
Enabling Capabilities A Robotic Field Geologist Access to a site mapped from orbit Long life, mobility, capability to explore a local region Remote sensing.
ESA Harwell Robotics & Autonomy Facility Study Workshop Autonomous Software Verification Presented By: Rick Blake.
A&AE 450 – Senior Design Un-pressurized Surface Vehicles, Local Science Issues and Robotic Exploration February 13, 2000 Christopher Burnside.
MARS EXPLORATION PROGRAM NSTA Robotics E-Class MARS EXPLORATION PROGRAM NSTA Robotics E-Class Sheri Klug Mars Space Flight Facility Arizona State University.
Rover and Instrument Capabilities Life in the Atacama 2004 Science & Technology Workshop Michael Wagner, James Teza, Stuart Heys Robotics Institute, Carnegie.
Robotics and Autonomy Test Facility - Hardware Verification needs Elie Allouis HRAF Workshop – 28/02/2012.
[Date] Dr. Yang Gao Robotics & Autonomy Test Facilities: In Support Micro Space Vehicle Research.
Pre-decisional – for Planning and Discussion Purposes Only 1 Technology Planning for Future Mars Missions Samad Hayati Manager, Mars Technology Program.
Scarab Autonomous Traverse Carnegie Mellon December 2007 David Wettergreen.
11/03/2016.
JUpiter Icy Moons Explorer (JUICE)
Planetary Lander PDR Team Name
ECSS-E-ST-50-15C Adoption Notice
Rover Components.
International Civil Aviation Organization
Advance Exploration Programs, Thales Alenia Space in Italy
Natural Sciences and Technology Grade 6
IEEE ICRA 2005 Planetary Rover Workshop April 22, 2005
Presentation transcript:

The Rover Concept for the ESA ExoMars Mission G. Gianfiglio, M. van Winnendael, J. Vago, P. Baglioni (European Space Agency) F. Ravera (Alcatel Alenia Space Italia) L. Waugh - EADS Astrium Ltd (UK) IEEE-ICRA 2007 workshop on Space Robotics Rome, 14 April 2007 14th April 2007 Space Robotics Workshop ICRA07

The Rover Concept for the ESA ExoMars Mission Automation and Robotics Section (TEC-MMA) The Rover Concept for the ESA ExoMars Mission Complementary Remarks By L. Joudrier ESA-Robotics Section 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Forewords Presentation of Rover – see proceedings for the mission details All material presented is subject to change due to the on-going and coming industrial studies. Additional pieces of information aiming to be potential seeds for discussions during this workshop. Search for life on Mars a European key priority First mission combines scientific and technological objectives First autonomous European mission will pave the way for a significant European role in Mars exploration 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Presentation Outline Forewords ExoMars Mission Objectives Status Overview ExoMars Rover Current baseline Vehicle overview Payload Support Equipment Pasteur Payload Surface Operations RHUs & Planetary Protection Considerations about the ExoMars Rover Locomotion subsystem Navigation Autonomy Planetary Protection 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Presentation Outline Forewords ExoMars Mission Objectives Status Overview ExoMars Rover Current baseline Vehicle overview Payload Support Equipment Pasteur Payload Surface Operations RHUs & Planetary Protection Considerations about the ExoMars Rover Locomotion subsystem Navigation Autonomy Planetary Protection 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Mission Objectives ExoMars is the first ESA led robotic mission of the Aurora Exploration Programme, combining demonstration of key enabling exploration technologies with major scientific investigations Main technology demonstration objectives: Safe Entry, Descent and Landing of a large size payload (Descent Module) Surface mobility (Rover) and access to the subsurface (Drill) Main scientific objectives: Search for traces of past and present life and characterize Martian chemistry and water distribution Improve the knowledge on Martian environment and identify surface hazards to future human missions Search for life on Mars a European key priority First mission combines scientific and technological objectives First autonomous European mission will pave the way for a significant European role in Mars exploration 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Mission Status Phase B1 on-going Started in October 2005 with AAS-I as Prime Contractor Extended to consider several options. Selection of Major sub-contractors is completed. ASTRIUM UK responsible for the rover Selection of sub-contractors completed soon SRR just completed Implementation Review is next (May 2007) Phase B1 to be completed by end of 2007 Integrated Locomotion-Navigation Rover Prototype Launch date: 2011 unlikely so target is 2013 with back up 2015/2016 launch opportunity. Search for life on Mars a European key priority First mission combines scientific and technological objectives First autonomous European mission will pave the way for a significant European role in Mars exploration 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Mission Overview Launch a Descent Module to Mars with supporting spacecraft infrastructure for LEOP and Cruise Phase Baseline: (Carrier + DM + Rover) Soyuz from Kourou + MRO Option 1: additional Soyuz for a relay orbiter (MRO back-up) Option 2: Ariane5 for ExoMars + carrier upgraded as orbiter (MRO back-up) Release Descent Module into Mars atmosphere for automatic Entry, Descent and Landing (EDL) on Mars surface Latitudes between –15º and +45º, all longitudes / Altitude ≤ 0 m relative to the MOLA zero level Option: vented / non-vented airbag landing system Egress of the Rover from the landed module Accomplish Rover surface operations 180 sols minimum, 10 experiment cycles, ~1km distance between experiment locations Search for life on Mars a European key priority First mission combines scientific and technological objectives First autonomous European mission will pave the way for a significant European role in Mars exploration 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Presentation Outline Forewords ExoMars Mission Objectives Status Overview ExoMars Rover Current baseline Vehicle overview Payload Support Equipment Pasteur Payload Surface Operations RHUs & Planetary Protection Considerations about the ExoMars Rover Locomotion subsystem Navigation Autonomy Planetary Protection 14th April 2007 Space Robotics Workshop ICRA07

Rover Current Baseline Mass ~ 180 kg (including Drill, SPDS and ~8kg Pasteur Payload) Average Power ~ 120 W (by Solar Array assuming RHUs availability) X-band communication link for DTE and UHF band for Proxi-link with MRO Two Thermal Control solutions still under trade-off: with and without RHU’s Concept with RHUs Concept without RHUs 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Rover Vehicle Locomotion 6 wheels chassis TTC X-band for DTE 2 redundant transponders 2 redundant SSPA 1 RFDN 1 Small HGA (30cm dish, 24dBi gain) UHF band for data relay with MRO Internal redundant Proximity-1 compliant transponder 1 LGA (quad helix) Power Solar Arrays Battery (Rechargeable, Li-Ion) PCDU Thermal Control System (TCS) Two options under trade-off (with and without RHUs) Loop Heat pipes, Radiators, Passive Thermal Switches Navigation Cameras (Nav. Cam, Haz. Cams) Navigation sensors Navigation Software (CNES) Structure Integrated units Deployable mast for Cameras, IR Spectrometer and sensors SA support and mechanisms 14th April 2007 Space Robotics Workshop ICRA07

Payload Support Equipment Sample Acquisition System – To obtain surface and subsurface samples for analysis; includes a subsurface drill with rod exchange and positioning mechanism & a sample delivery mechanism, plus a surface rock corer (TBC) SPDS – To prepare and present samples to all analytical lab instruments; includes distribution mechanisms and a milling station Subsurface drill includes a miniaturised IR spectrometer for borehole investigations (Ma_Miss DIBS) 14th April 2007 Space Robotics Workshop ICRA07

Rover Scientific Payload: Pasteur CONTEXT - PanCam - IR Spectrometer - Ground Penetrating Radar - Close-up Imager - Mössbauer - Raman-LIBS external optical heads - Microscope IR - Raman - LIBS Spectrometers - XRD The instruments development is under the responsibility of relevant National Agencies The current total mass of the Pasteur Payload Instruments exceeds the 8 kg allocation: if necessary instruments de-scoping will be implemented in line with the available resources (Payload Confirmation Review) INSTRUMENTS SUPPORT EQUIPMENT Drill System (Surface and 2 m depth) Includes Borehole IRS Sample Preparation & Distribution System (SPDS) ORGANICS/LIFE - MOD/MOI - GC-MS - Life Marker Chip ENVIRONMENT - Dust & H2O Vapour Suite - Ionising Radiation - UV Spectrometer - Meteo Package To be accommodated into GEP 14th April 2007 Space Robotics Workshop ICRA07

Rover Surface Operations The Surface Mission is composed of a sequence of Experiment Cycles (up to 10) An Experiment Cycle consists of: Identifying the location at which to perform the Measurement Cycle (from Ground Control) Traveling to the new location (distance about 1 km between locations) Performing a full Measurement Cycle using all instruments Transmitting scientific, housekeeping and navigation data to the Relay Orbiter/Earth (Data volume ~ 1Gbit per Experiment Cycle) During night the Rover goes into a sleep mode and resumes operations the following day 14th April 2007 Space Robotics Workshop ICRA07

Planetary Protection & Radio-isotope Heating Units RHUs: Accommodation/location inside the internal enclosure is subject to trade-off between easy late access, proper heat distribution and interfaces with the Rover TCS Planetary Protection: ExoMars is a class IVc mission allowing to search for past life and organic molecules in “special regions”. This is a major driver of the mission design, AIV, especially considering possible need of late access due to RHUs. The sterilization concept is under study. The PP mission class may be revised into IVb class (TBC). 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Presentation Outline Forewords ExoMars Mission Objectives Status Overview ExoMars Rover Current baseline Vehicle overview Payload Support Equipment Pasteur Payload Surface Operations RHUs & Planetary Protection Considerations about the ExoMars Rover Locomotion subsystem Navigation Autonomy Planetary Protection 14th April 2007 Space Robotics Workshop ICRA07

Locomotion Subsystem 1/2 ExoMars current baseline is the RCL-type E with formula 6*6*4+4W  Simple and light weight design passive articulated suspension  No internal averaging mechanism  Wheel-walking/peristaltic mode possible allowing highest mobility (Reuse of the motors necessary for deployment) BUT  Static stability issue depending of CoG (40 deg requirement)  Eventually less performing compared to other concepts (Type D, Crab, R-bogie) Possible improvements: Formula 6*6*6+4W or 6*6*6+6W RCL Type-D RCL Type-E 14th April 2007 Space Robotics Workshop ICRA07

Locomotion Subsystem 2/2 ExoMars mobility requirements: 25 cm step obstacle 25 deg slope on specific soil 40deg stability any direction Improvement of traction & obstacle crossing capabilities: Use of terramechanics to define optimum wheel design (Single Wheel Testbed built within R&D activity “Rover Chassis Evaluation Tools”) Possible use of flexible wheels [Richter ASTRA06] Improved design of articulated suspension via simulation tools and prototyping. Optimising the mass and power requirements remains a challenge at the expense of the scientific payload and desirable higher locomotion capabilities. Locomotion risks due to unknown rough terrain are mitigated by high locomotion capabilities and (conservative) navigation. 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Navigation Baseline is the use of the CNES Autonomous Navigation Software. Accurate localisation is key. Visual Odometry & target tracking are required. Solutions to definition target coordinates on ground by PIs to be experimented. 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Autonomy ExoMars will require high degree of autonomy : Ground Control Staffing, amount of Telemetry to download, large distance traverses. At least level E3 on the ECSS E70 autonomy scale (event driven reactive systems with some re-planning). ESA Relevant R&D Activities (non exhaustive): ESA Functional Reference Model (FRM) based on a 3-layered controller architecture (Mission-Task-Actions) equivalent to deliberative-executive-functional layers. MUROCO: Formal specification and verification Tool [Kapellos-ASTRA06]. Use ESTEREL formal language to specify/Verify the rover behaviour (state machine composing the actions and tasks). MMOPS: On-board planning/re-planning and scheduling tool [Woods-ASTRA06] On-board model checking (just started) will allow advanced FDIR. 3DROV (on-going): full planetary rover simulator 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Planetary Protection Based on the facts that: During AIV process, 80 % of the bio-burden is brought by the AIV operators. Sterilisation “kills the spores but does not remove the bodies” that may trigger organic molecule sensitive sensors designed to detect traces of past life. ESA has initiated a feasibility study on Robotized AIV that would allow to reduce to the minimum the number of operators in the AIV clean rooms. Robotized AIV is very challenging activity where space robotics and Earth state of the art robotics would be joined. 14th April 2007 Space Robotics Workshop ICRA07

Space Robotics Workshop ICRA07 Conclusion ExoMars mission and rover current baselines have been briefly presented. They will evolve along with the industry work. Some relevant ESA R&D activities about rover have been presented to provide inputs to the discussion Questions ? 14th April 2007 Space Robotics Workshop ICRA07