US CMS Collaboration Meeting: April 7-8, 20061 LHC Remote Operations Center Erik Gottschalk Fermilab.

Slides:



Advertisements
Similar presentations
Development of the System remote access real time (SRART) at JINR for monitoring and quality assessment of data from the ATLAS LHC experiment (Concept.
Advertisements

Recent Activities toward Worldwide Remote Operations of Accelerators N. Yamamoto, KEK ICALEPCS2003,Korea.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
L. Taylor 2 March CMS Centres Worldwide See paper (attached to agenda) “How to create a CMS My Institute” which addresses the questions:
09/06/2006F. Scuri - Remote CO shifts at CDF 1 CDF Remote Consumer Operator (CO) shifts in Pisa Motivations and project contour CDF online issues for remote.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Suzanne Gysin1 Software for the LHC Types of Software Current Prototyping Architecture Ideas Requirements Revisited WBS considerations.
LHC Accelerator Coordination Meeting: March 28, Remote Operations for CMS Erik Gottschalk.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
Brochure: Lucas Taylor CHEP 2009, Prague1CMS Centres Worldwide : A New Collaborative.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
Presentation to OHEP, OFES, OASCR: Nov 7, Remote Operations and Collaborative Technologies for Distributed Science --- HEP & FES --- Erik Gottschalk.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
Nov. 5th, 2007CMS Tier1 visit to FNAL, “Commissioning, Global Runs & ROC”, Kaori Maeshima 1 Commissioning, Global Runs & ROC CMS Tier1 visit to FNAL November.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Collaborating at a Distance: Operations Centers, Tools, and Trends, Erik Gottschalk 1 Collaborating at a Distance: Operations Centers, Tools, and Trends.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Fermilab Annual DOE Program Review May 16-18, 2005 JF1 CMS M&O at FNAL Jim Freeman US CMS M&O Manager May 17, 2006.
Lucas Taylor LHC Grid Fest CERN 3 rd Oct Collaborating at a distance 1 Collaborating at a Distance Lucas Taylor ▪ LHC Grid Fest ▪ 3 Oct 2008 ▪ CERN.
J. Mnich GDN Status and Plans Global DetectorNetwork Status and Plans Joachim Mnich DESY March 21 st, 2005 What is the Global Detector Network? Summary.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Accelerator Physics Department Meeting July 26, 2006 Jean slaughter1 Status Report APD Meeting July 26, 2007 Jean Slaughter.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
September 29, Trip to JLAB MCC September 27, 2005.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
Your-own-afs-password CMS Centre CMS System Login: Password: N.B. you must.
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
Visit to CERN/CMS Jan 2006 Patricia McBride Fermilab Slides taken from presentations by Hans Hoffmann and Werner Jank.
Committee – June 30, News from CERN Erik Gottschalk June 30, 2005.
Remote Operations Committee – May 12, Subgroups and Scenarios Erik Gottschalk May 12, 2005.
UEC Meeting: May 6, Remote Operations Center Erik Gottschalk.
CMS ROC Report Patricia McBride May 26, 2005.
CMS Centre Project - Green Light Meeting
Distributed Collaborations
LHC Science Goals & Objectives
Remote Operations Erik Gottschalk Fermilab
JRA3 Introduction Åke Edlund EGEE Security Head
Remote Operations For High Energy Physics
CMS Centres for Control, Monitoring, Offline Operations and Analysis
Erik Gottschalk for Jean Slaughter
Remote Operations Erik Gottschalk 5 October, 2005
Assessment of Our Status After 183 Days (6 months)
CMS Centres Worldwide CMS Centres Worldwide
Remote Operations for CMS & LHC Erik Gottschalk Fermilab
Remote Operations at Fermilab
Update Erik Gottschalk.
Remote Operations Erik Gottschalk 7 September, 2005
CMS Centres for Control, Monitoring, Offline Operations and Analysis
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Presentation transcript:

US CMS Collaboration Meeting: April 7-8, LHC Remote Operations Center Erik Gottschalk Fermilab

US CMS Collaboration Meeting: April 7-8, IntroductionIntroduction We have plans for a joint CMS & LHC remote operations center. Current status: ROC is ready for operations conceptual design is completed & funded for FY06 We are looking for feedback and help: What functionality and physical aspects are important to you? What are the needs of individual subdetector groups? How will remote shift activities be organized? Send feedback to or join us at the ROC meeting Tuesday’s at 4:00. Additional information is available: (ROC web page) web page) wiki)

US CMS Collaboration Meeting: April 7-8, OverviewOverview CMS and LHC control rooms at CERN Remote operation of CMS Plans for ROC & 3D model of Summary

US CMS Collaboration Meeting: April 7-8, Control Rooms at CERN Temporary CMS control room for the Magnet Test Cosmic Challenge (MTCC) – “green barrack” CMS control room at Point 5  Under construction CMS Control & Analysis Room (CCAR)  Future remote operations (and control) center at Meyrin  Described as the “heartbeat” of CMS at CERN New LHC control room – CERN Control Centre The CCC combines all of the control rooms for the accelerators, cryogenic systems and technical infrastructure into one room. The CCC began operations on February 1 st, 2006.

S.C. CMS-TriDAS CCAR (possible) layout Secr.Office New printshop Visitors Control room Conference Technical Collaborative work Meeting Towards Main Building Space breakdown Control room m 2 Conference room m 2 Meeting/VRVS room 1 70 m 2 Technical room 1 80 m 2 Group work room m 2 Office space m 2 Available cooling power 110kW

US CMS Collaboration Meeting: April 7-8, CERN Control Centre (CCC)

US CMS Collaboration Meeting: April 7-8, Remote Operation of CMS How will CMS operate? This was discussed during CPT Week at CERN, Jan.-Feb

US CMS Collaboration Meeting: April 7-8, Remote Operation of CMS Why does CMS need remote operations at CERN? SX5 is ~13 km from Meyrin SX5 lacks “infrastructure” available at Meyrin CMS control room, currently under construction, is “tiny” CMS control room has a low ceiling SX5 does not have large and small meeting rooms that are necessary for daily/weekly meetings and expert space Paris Sphicas: Asymptotically, at sufficiently long times after startup, we will run CMS remotely This is not a question of whether this will happen – it’s a question of when.

US CMS Collaboration Meeting: April 7-8, Remote Operations in the U.S. The ROC (WH-11) is ready for operations!  Kaori Maeshima, Alan Stone & others Planning for remote operations for CMS commissioning and operations, and LHC beam commissioning and operations Transition from the 11 th floor to the 1 st floor of Wilson Hall by Spring 2007  More visibility for CMS  Joint effort for CMS & LARP (LHC Accelerator Research Program)  Combine commissioning & operations efforts

US CMS Collaboration Meeting: April 7-8, ROC (WH-11)

US CMS Collaboration Meeting: April 7-8, (WH-1) 1) Dedicated facility to support both CMS and LHC commissioning and operations. Remote shifts for CMS 2) Facilitate communication with CMS and LHC control rooms. Call center for US-CMS collaborators to access information about CMS and the LHC accelerator. Introduce collaboration tools to improve communication 3) Take advantage of a unique opportunity to have detector and accelerator experts working together to solve problems.

US CMS Collaboration Meeting: April 7-8, Task Force Erik Gottschalk – Chair (FNAL-PPD) Kurt Biery (FNAL-CD) Suzanne Gysin* (FNAL-CD) Elvin Harms* (FNAL-AD) Shuichi Kunori (U. of Maryland) Mike Lamm* (FNAL-TD) Mike Lamont* (CERN-AB) Kaori Maeshima (FNAL-PPD) Patty McBride (FNAL-CD) Elliott McCrory* (FNAL-AD) Andris Skuja (U. of Maryland) Jean Slaughter* (FNAL-AD) Al Thomas (FNAL-CD) The task force had its last meeting on March 29, * Accelerator Subgroup Task force was charged by the Fermilab Director in April, Task force wrote a requirements document and WBS. Work completed in March, 2006.

Requirements Review – July 21, Planning for The task force developed a plan with CMS collaborators. Most of our input came from CMS HCAL and tracker groups, with some input from CDF, D0, MINOS, and MiniBoone. We worked with CMS and US-CMS management, as well as members of LARP (LHC Accelerator Research Program) and LARP management at all steps in the process. A requirements document for was prepared and reviewed last summer. We visited 9 sites (e.g. Hubble, NIF, ESOC) to find out how other projects do remote operations. The goal is to have ready before the start of beam (end of 2006).

US CMS Collaboration Meeting: April 7-8, ROC & Timetable ROC renovation started – June 2005 Requirements Review – July 2005 Preliminary requirements document completed – July 2005 ROC renovation completed – September 2005 plan developed – Fall 2005 WBS presented to FNAL Directorate – Feb Requirements document completed – March 2006 Engineering design start – March 2006  Looking for feedback and help now! (Phase 1) construction start – May 2006 (Phase 1) construction completed – October 2006 Move ROC operations to – Spring 2007

US CMS Collaboration Meeting: April 7-8, New Location & Layout Operations Center (Phase 1) Office Space (Phase 2) Conference Room (Phase 1)

US CMS Collaboration Meeting: April 7-8,

US CMS Collaboration Meeting: April 7-8,

US CMS Collaboration Meeting: April 7-8, ConsolesConsoles

US CMS Collaboration Meeting: April 7-8, Possible CMS Activities Operations Center: Online shifts (DQM, trigger monitoring) Offline shifts (data processing, data distribution, GRID) Miscellaneous (shift training, DB maintenance) Call center for US-CMS Conference Room (integrated with Ops. Center): Daily & weekly meetings Office Space: Two small meeting rooms (3 – 5 people each) Expert space Rest area for shifters

US CMS Collaboration Meeting: April 7-8, SummarySummary We have plans for a joint CMS and LHC remote operations center, and are looking for feedback and help. If you have questions or suggestions contact: (Alan Stone) (Erik Gottschalk) (Kaori Maeshima) (Patty McBride) Let us know what you think during the discussion session!!

US CMS Collaboration Meeting: April 7-8, Additional Slides

US CMS Collaboration Meeting: April 7-8, Current Status layout endorsed by Fermilab Director Funding secured Conceptual Design Report completed and reviewed Project Execution Plan written Project Managers Elvin Harms (FNAL-AD) – construction Erik Gottschalk (FNAL-PPD) – consoles Weekly meetings to prepare construction drawings Presentation to US-CMS Collaboration (early April) Presentation to LHC Accelerator Research Program (LARP) at its collaboration meeting (late April) Construction complete by end of FY06

US CMS Collaboration Meeting: April 7-8, AssumptionsAssumptions For CMS CMS will have a shift schedule, a run plan, and a protocol that defines responsibilities and roles of shift personnel. We assume that a shift leader is responsible for CMS shift activities. will have shift operators who will be able to assist US-CMS collaborators with CMS activities during commissioning and operations. will participate in CMS shifts. Neither the duration nor the frequency of the shifts has been determined. The CMS Collaboration will have a protocol for access to the CMS control system (PVSS), and a policy for how access to the control system will vary depending on the physical location of an individual user. The CMS Collaboration will have a policy that defines how DAQ resources are allocated. This includes allocation of DAQ resources to various detector groups for calibration and testing. The CMS Collaboration will have a protocol that defines how on-demand video conferencing will be used in CMS control rooms and The CMS Collaboration will provide web access to electronic logbook and monitoring information to collaborators worldwide The CMS Collaboration will maintain a call tree that lists on-call experts worldwide for each CMS subsystem during commissioning and operations For both CMS & LHC will comply with all CERN and Fermilab safety and security standards.

US CMS Collaboration Meeting: April 7-8, Site Visits Technology Research, Education, and Commercialization Center (TRECC) – West Chicago, Illinois (Aug. 25, 2005) Gemini Project remote control room – Hilo, Hawaii (Sept. 20, 2005) Jefferson Lab control room – Newport News, Virginia (Sept. 27, 2005) Hubble Space Telescope & STScI – Baltimore, Maryland (Oct. 25, 2005) National Ignition Facility – Livermore, California (Oct. 27, 2005) General Atomics – San Diego, California (Oct. 28, 2005) Spallation Neutron Source – Oak Ridge, Tennessee (Nov. 15, 2005) Advanced Photon Source – Argonne, Illinois (Nov. 17, 2005) European Space Operations Centre – Darmstadt, Germany (Dec. 7, 2005)

Baseline for LHC Remote Access Software Application Common Middle Wear (CMW) Software Application Front End subscribe publish Databases Timber Logging Timber Logging Timber Replicated/Backed up Logging DB Remote Desktop Terminal Server Technical Network

Preferred Model for Remote Access Software Application Common Middle Wear (CMW) Software Application Front End subscribe publish Databases Timber Trusted Host Logging Technical Network