2013 Southeast Region Mine Rescue Contest June 18 th – 20 th Judge’s Packet for Field Competition.

Slides:



Advertisements
Similar presentations
2011 Mine Rescue Contest 35 th May 18 th 2011 Judges Briefing.
Advertisements

2013 Nevada Mine Rescue Contest SPECTATORS PACKET.
2010 National Mine Rescue Contest Reno, Nevada
10 th Annual Nevada Mine Rescue Contest March 12 & 13, 2014 Winnemucca Events Center Winnemucca, NV.
2014 Central Mine Rescue Contest Kellogg, Idaho May 16 th & 17th.
Spectator 2014 Field Problem. The Blue Granite Mine is an underground, single level, aggregate, room and pillar operation. The mine has two adits that.
Have We Really Learned From Our Mistakes? Jon Montgomery Ken Heintz Kevin Jones.
2014 Pennsylvania State Mine Rescue Contest Team Statement Thank you for responding to this emergency to the Carmike Mine # 3. This mine had been an active.
FABFAB FABFAB Field layout. FABFAB D DD e1e2e3e4w4w3w2w1 N Team Map.
2013 Central Mine Rescue Spectator Information Idaho Mine Rescue Contest May 17 and 18, 2013 Kellogg, Idaho.
Rock Springs 2014 Problem Map Loose roof Supportable Loose Roof Supportable Rock Burst B Caved Air Tight Floor Bleeder Fire LHD LHD on Fire 3 Miners, One.
MINE RESCUE ACTIVITY BOOK – Section IV MSHA 2208 NOVEMBER 1981 JUNE 2005.
26 TH ANNUAL CONTEST JUNE 5 TH INDIANA STATE MINE RESCUE CONTEST.
MINE RESCUE Procedures: Establishment of surface control For dealing emergencies like explosions, fires, heating, outbursts at any mine, the first step.
Central Mine Rescue Regional Fairbanks 2015 Contest Field Solution Spectator Packet.
2011 Colorado Metal and Nonmetal Mine Rescue Contest July 12 th thru 14 th, 2011 Idaho Springs, Colorado.
2012 Contest Kellogg, IdahoMay 18 & 19, 2012 Chief Judges Packet.
Contestant Briefing Hello I am ______and this is ________. You are to conduct a Pre-shift examination of the Bee No. 1 head gate section, for the oncoming.
39 th Annual 2015 Day 2 Judges Book ACA DAY 2 PROBLEM GENTLEMEN, WE THANK YOU FOR ANSWERING OUR CALL FOR HELP……. Four people were working on the.
2014 A Skills Mine Rescue Problem. Mine Rescue Statement 2014 A Welcome to the Happy Go Lucky Mine. This is a high wall mine with a history of water and.
2014 SOUTHEAST REGION FAB MAP FRESH AIR BASE BC x 20 POST.
RESPONSIBLE PERSON TRAINING. Review of § Emergency Evacuations.
Mine Rescue Practice DK. STATEMENT PROBLEM GENTLEMEN, WE THANK YOU FOR ANSWERING OUR CALL FOR HELP! SEVEN PEOPLE WERE WORKING SATURDAY.
Colorado Mine Rescue May 2015
Cementation #1 Shaft Incident July 6th Incident overview Incident Timeline Incident Causation Recommendations Cementation #1 Shaft Incident.
2015 Post No.5 & West Virginia State Mine Rescue Contest Day 2 Problem Briefing.
On-Shift Examination Scenario Continuous Miner Section What you will need: Pencil and paper to take notes or perform calculations Calculator to calculate.
Aug 1 st 2014 Mine Rescue Practice Problem Ole Smokey # 9 mine.
2015 Post No.5 & West Virginia State Mine Rescue Contest Day 1 Problem Briefing.
2015 A Skills Mine Rescue Problem. Mine Rescue Statement 2015 A Welcome to the New View Mine. We have encountered a problem and your assistance is needed.
N FAB Maysville Map N FAB Front End Loader Smoke O2=16.5 % CO= 4,000 PPM No Response Maysville 2012 Field Set-up Response: Air Only For 15 Minutes.
2013 MTTC Pennsylvania Regional Skills Contest April 22-25, 2013.
D office decline east portal D Highway 1 Highway 2 Highway 3 Crosscut 4 Crosscut 3 Crosscut 2 Crosscut 1 TEAM AND FRESH AIR BASE MAP vent shaft sump D.
Problem Briefing 2013 Day 1 Problem Briefing ACA DAY 1 Statement You are located on the surface of RT #15 mine. This is a new highwall mine that.
STATEMENT Indiana Mine Rescue Contest June 7, 2012 Hello, thank you coming to help. My name is __________________________, the mine manager in charge of.
Mine Emergency Preparedness Training Mine Recovery.
Pre-Shift Examination Scenario Continuous Miner Section What you will need to complete this exercise: Pencil and paper to take notes or perform calculations.
FRESH AIR BASE Placard 1. INTAKE PORTAL Placard 2.
Ventilation Map N FAB Entry 1 Entry 2 Entry 3 D East Decline West Shaft (Intake) Door Closed Temporary Stopping A Temporary Stopping B Mine Fan ON/OFF.
MINE RESCUE ACTIVITY BOOK – Section II-b.1 MSHA 2208 NOVEMBER 1981 JUNE 2005.
Indiana Mine Rescue Statement 2013 Thank your for assisting us with our emergency at the Vincennes No. 1 Mine. You are located at the fresh air base established.
BO LC TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’ B X Battery Scoop X D Overcast Door Open X Battery Golf Cart RA Unconscious Live person x D 10’ Diameter.
N FAB Entry 1 Entry 2 Entry 3 #3 (Intake) Check Curtain Caved Tight #2 (Intake) #1 (exhaust) Bear E. Bill E. Continuous Miner T-4 Haul Truck W/bed up On.
2012 Mine Rescue Contest Day 1 36 th May 15 th 2012 Judge’s Briefing.
STATEMENT Welcome to the TG Mine and thank you for your help. We have a 5 person crew that was tagged in on the mine tag board. They were working an idle.
Rock Springs Mine Rescue June 2016 – Day 1
2013 Skills Mine Rescue Problem.
SAFE WORK INSTRUCTIONS
Who Wants to be a Miner? Sample Question You will work in groups
N N D D C Ventilation Map FAB Entry 1 Entry 2 Entry 3 Jim Swan 30-inch
38th 2014 Day 1 Problem Briefing Problem Briefing.
KCA Regional Skills Contest July 31, 2012 Mine Rescue Problem
Price 2016.
2016 KCA Regional Mine Rescue Skills April, 7th 2016
2013 Day 2 Problem Briefing Problem Briefing.
2015 KCA Regional Mine Rescue Skills April, 9th 2015
KCA Regional Skills Contest April 11, 2013 Mine Rescue Problem
2016 Post 5 & West Virginia State Mine Rescue Contest Day 2
Projected Development
2012 PA Regional Skills Contest
Day Two.
2012 Mine Rescue Contest Day 2
2014 MTTC Pennsylvania Regional Skills Contest
2014 KCA Regional Skills Contest
DAY ONE.
FRESH AIR BASE Placard 1.
2016 KCA Nationwide Skills Championship
Fresh Air Base Statement
2016 Illinois State Mine Rescue Contest
2016 Mine Rescue.
Presentation transcript:

2013 Southeast Region Mine Rescue Contest June 18 th – 20 th Judge’s Packet for Field Competition

Field No. 1Field No. 2Field No. 3 Field Manager:Field Manager Kevin Abel (NE)Sam Pierce (SE)Jim Croft (SE) Field 1 Judging Crew A:Field 2 Judging Crew A:Field 3 Judging Crew A: 1. Jeff Phillips (SE)1 Curtis Roth (SE)1. Joe Bosley (SE) 2. Bob Andrews (NE)2. Tom Galbreath (SE)2. Joe Norwood (SE) Field 1 Judging Crew B:Field 2 Judging Crew B:Field 3 Judging Crew B: 1. Dave Smith (SE)1. Brian Thompson (NE)1. Mike Evans (SE) 2 Kevin Hardester (NE)2. Mike Hollis (SE)2. Leroy Lockett(SE) Mine Attendants/Lifeline: 1. Shawn Sharp (SE)1. Randy Skaggs (ETD)1. Walter Deloach (SE) 2. Mark Schroeder (TS)2. Sonia Conway (SE)2. Vance Rumbaugh (TS) (Students) Scorecard/Testing Judges: Chief Judges: (review)Debriefing/Appeals:Mary Wagner (SE) Mike Davis (SE)Doniece Schlick (SE)Louise Santoro (NE) Don Foster (NE) Mike Hancher (HQ) Joe Denk (NE) Jeff Kravitz (HQ) Kelly Krause (CKMR) Film Crew: Eddie Walker, Jason Cox, Carol Richmond Isolation/Escorts: Contest DirectorMap Judge1. Oscar Fredrick (TN) Marvin LichtenfelsScott Johnson (SE)2. Michael Giddens (SE) 3. Students/Teachers FIELD ASSIGNMENTS

Video Team Briefing Thank you for responding to our call for help. My name is Nick Saban and I am in charge of the Crimson Tide National Championship Mine. There has been an event at the mine and at this time a crew of miners are unaccounted for. We are preparing plans to send Mine Rescue Teams underground to locate these miners. Federal and State Officials are on site working with us on these plans. We will keep you updated on these activities. I want to give you some information about the Crimson Tide National Championship Mine. We have had Production and Safety records back to back for the past two years and have received National recognition for this Championship accomplishment 15 times! We are very proud of our Safety record! This is a multi-level mine accessed by vertical shafts and a drive-in slope. The main shaft is constructed with steel sets and is equipped with a 5 ton ore skip below the man cage. The mine phones and utilities are run down the shaft. The slope is the primary way out for miners. The man hoist has a certified hoist man on duty and has been inspected by State and Federal inspectors recently. The zinc ore is mined by room and pillar method and the pillars are 40 feet x 40 feet with heading widths of 50 feet. The initial heading heights are normally 25 feet. Benching is done in the ore body areas of the mine and the height in those areas is much higher. The geology in this mine has some weak bedding plains and we have recently experienced some adverse conditions in the Southeast area of the mine. Ground control is maintained using 8 foot expansion shell bolts and 8 to 10 foot steel mats where needed. Shot Crete and chain link wire are used to control loose ground on the ribs and in some shop areas. A combination of timber, Shot Crete and steel is used in some areas where the office and shop is located. The mine works 7 days a week; day and evening shifts only. Production shifts work Monday through Friday with maintenance performed on the weekends. The average crew is 4 miners and a mechanic, but this varies with production demands and schedules. Fresh air is forced into the mine with a 300 HP Joy single pitch non reversible blowing fan creating approximately 250,000 cubic feet of air per minute. After fresh air ventilates the headings exhaust air travels out several upcasting shafts located in different areas in the mine. Explosives are stored and transported underground, usually just enough for a one week period. Damaged explosives are stored in the powder magazine and taken out of the mine once a week or when necessary. All underground repairs of drills, pumps and maintenance of mobile equipment are done in the underground shop. The shop is fully equipped to handle any kind of equipment overhaul. It has an overhead 15 ton crane, welding and cutting supplies, lube bay, and small ware house with needed equipment and supplies. The shop is equipped with fire doors in both entrances and has ample fire fighting equipment inside the shop. The shop is ventilated by leaving shop doors open during working hours. Power centers underground are identified and power sources range from 7200/480 volt, AC, three phase. Some 110 volt single phase current is available in the shops and office and shaft stations. All underground mobile equipment is rubber tire and diesel powered. The underground mine has two CAT Front End Loaders, two CAT haul trucks, two pick up trucks, one CAT Excavator with a rotary head scaler, Oldenburg Cannon drill, and a Powder truck. Bolting is done by a hydraulic carousel Fletcher rock bolting machine using 8 foot expansion shell bolts. The mine map is up to date and should be accurate. The local sheriffs department is providing security. A guard is posted at the front gate and a site has been designated for family and press. The only people allowed on the mine site are authorized and screened by the sheriffs department. The mine is very wet and produces a lot of water. Eight 480 volt 50 HP submergible pumps are located throughout the mine that pump water to the main sump located near the slope bottom. Two 150 HP Johnson centrifugal vertical pumps are located in the main sump and pump water to the surface. We will keep you updated on the plan approval process and let you know when mine rescue teams are approved to go underground. Once again, thanks for your help!

Mine Manager Statement Hello, my name is Paul Bryant, and I am the mine manager of the Crimson Tide National Championship Mine. Your judges are_______(introduces Judges) Thank you for answering our call for assistance. You are located underground at the Fresh Air Base established by the previous mine rescue team. Last night 8 men entered the mine on the night shift to do maintenance and repair work. Four men went to the underground shop and a 4 man maintenance crew went to the Southeast area of the mine to work on equipment and setup a water pump. Around 4:00 a.m., Joe Namath, the outside shop man, heard a loud noise coming from underground and the blowing fan stalled for a short period and recovered. Joe tried to contact the miners underground and did not get a response. All State and Federal authorities have been notified and have representatives on site. The previous mine rescue teams have explored and ventilated up to this area, setting up this Fresh Air Base. The teams have confirmed that there are still 4 miners missing. The rest of the mine outby this location has been explored. This mine has a history of hydrogen sulfide concentrations, water accumulations, and challenging geological conditions. The mine fan is on and is being monitored and guarded. Air quality samples are being taken every 15 minutes at locations where air exits the mine. Ventilation to this point has fresh air coming from the east of the (#3 Heading) and exiting west across the (#1 Heading.) The Fan cannot be stopped or reversed. Electrical power has been restored to the pump switch at the fresh air base, but all electrical power inby the fresh air base is off. Back-up mine rescue teams are available should you require their assistance. A life-line person is provided to receive your signals. Good Luck!

2013 Southeast Region Mine Rescue Contest Problem/Written Instructions Account for all missing miners if it can be done safely. Explore all areas of the mine that can be safely accessed and bring survivors to the Fresh Air Base. Map all conditions found in the mine and any changes you make. The Fan cannot be stopped or reversed. Seal or extinguish all fires. You have 110 minutes to work the problem (after the clock has been started). Thank You and Good Luck!

6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT FAB FAB MAP x x PUMP CABLE PUMP SWITCH OFF 2013 Maysville

6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT FAB TEAM MAP x x PUMP CABLE PUMP SWITCH OFF 2013 Maysville

XXXXXX CAVED 6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 B B 6.9% H 2 S 16.1% O 2 2.9% H 2 S 16.6% O 2 3 TIMBERS DRILL MACHINE HAUL TRUCK 36 INCH VENTILATION SHAFT UPCAST WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT LUNCH BOX HELP I AM BARRICADED IN #2 FACE FRONT END LOADER FAB 6% H 2 S 19.9% O 2 6.9% H2S 19.9% O2 1% H2S 19.9% O2 FACE FIELD MAP GT DI RR DI GT RR DI GT GT DI RR GT DI GT GT RR DI GT GT RR DI GT GT DI GT GT RR DI RR GT DI GT DI GT A B C D 12 3 x x x x x x x x x x x x x x x x x PUMP CABLE PUMP SWITCH OFF GAS TEST STATION PUMP CABLE FIRE HOSE UNSAFE RIB OIL CAN PUMP WATER OVER KNEE DEEP HARD HAT MINE PHONE SAFETY GLASSES Person Kenny Stabler #2640 Person Trent Richardson #2141 Person Jay Barker #9876 Person Johnny Musso #1356 TEMPORARY STOPING INTACT UNSAFE ROOF 2013 Maysville 1% H2S 19.9% O2

XXXXXX CAVED 6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 B B 6.9% H 2 S 16.1% O 2 2.9% H 2 S 16.6% O 2 3 TIMBERS DRILL MACHINE HAUL TRUCK 36 INCH VENTILATION SHAFT UPCAST WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT LUNCH BOX HELP I AM BARRICADED IN #2 FACE GET ME OUT FIRST FRONT END LOADER FAB 6% H 2 S 19.9% O 2 6.9% H 2 S 19.9% O 2 1% H 2 S 19.9% O 2 FACE TEAM STOP GT DI RR DI GT RR DI GT GT DI RR GT DI GT GT RR DI GT GT RR DI GT GT DI GT GT RR DI RR GT DI GT DI GT 11 GT TIME Clock Start _________ 50ft. AP Check _________ 2 nd AP Check _________ 3 rd AP Check __________ 4 th AP Check __________ 5 th AP Check __________ 6 th AP Check __________ 7 th AP Check __________ 8 th AP Check __________ Clock Stop ___________ TEAM # _________ JUDGE NAME _______________. A B C D 12 3 DURING EXPLORATION THE TEAM MUST TIE ACROSS INTO #3 HEADING WHEN IN THE D CROSSCUTS TO AVOID BREAKING THE 2 X 3 RULE IN HEADING #1 AND #2. HEADING #3 AT BARRICADE WILL NOT FALL UNDER THE 2 X 3 RULE DUE TO LONG PILLAR CONFIGURATION x x x x x x x x x x x x x x x x x PUMP CABLE PUMP SWITCH OFF GAS TEST STATION PUMP CABLE FIRE HOSE UNSAFE RIB OIL CAN PUMP WATER OVER KNEE DEEP HARD HAT MINE PHONE SAFETY GLASSES GAS TEST READINGS _________________ _________________. Person Kenny Stabler #2640 Person Trent Richardson #2141 Person Jay Barker #9876 Person Johnny Musso # Maysville 1% H 2 S 19.9% O 2

SOUTHEAST REGION MINE RESCUE CONTEST JUNE 18 th thru the 20 th JUDGE’S BRIEFING Exploration The mine manager will read statement and give it to the team. When the captain is ready, he will start the clock. Judges must give him the maps. Exploration of Mine Openings: Teams will examine both openings, conduct gas tests (GT), the captain will date & initial (D&I) the temporary stopping in both headings built by previous mine rescue team. The team can travel inby the fresh air base in the entry of their choice. Team must build an airlock into mine to travel to team stop #1. This solution assumes that the teams will begin their exploration in the #1 entry.

Exploration Team Stop #1 After team breaches airlock, a gas test inby the temporary stopping must be made. If no gas test is made, dock them 1 x each gas, each omission, under Underground Judge #2, Item 1. If team does not make a 50’ apparatus check, dock them 4 total, under Underground Judge #1, Item 3. The team will advance to 1A intersection. The 50’ apparatus check (AP) must be conducted at team stop #1. The team will find a caved area in the crosscut to the east, and unsafe roof in the heading to the north. The captain will do a RR test and must DI at both areas, and a GT must be made inby each of the two openings. If the captain does not verbally indicate - checking the back, or roof dock them 5 x each omission, under Underground Judge #1, Item 8(b). If the captain does not DI the caved area and unsafe roof, dock them 2 docks x each omission, under Underground Judge #1, Item 9. If no gas test is made, dock them 1 dock x each gas, each omission, under Underground Judge #2, Item 1.

Exploration Team Stop #2 Teams must retreat and airlock back out to the FAB, and air-lock into the #2 heading. Once the temporary stopping is breached, the captain must take a GT. The team will advance to 2A intersection. The team will find an explosive mixture in the intersection, and caved area to the west. If they don’t notify the FAB of the explosive mixture, dock them under Underground Judge 1, Item 14. The captain will RR test and must DI at the caved area, and a GT must be made in all three openings from the intersection. Team will tie across to the 3A intersection and will find the gas testing station and test the equipment. The team must have the “hood” for the detector and put the gas on the detector. The captain will give the readings from the detector to the head judge who will write the readings down on the judge’s map. If team does not make the “ hooded” gas check on the detector, dock them under Underground Judge #2, Item 4 for each incorrect reading. 15 docks X 4 = 60 docks.

Exploration Team Stop #3 The team will advance to 3A intersection, a GT must be made north of the intersection. If no gas test is made, dock them 1 x each gas, each omission, under Underground Judge #2, Item 1. Team Stop #4 The team will probably advance up the #3 heading to the 3B intersection. Team must take a GT to the west and north of the intersection. If no gas test is made, dock them 1 x each gas, each omission, under Underground Judge #2, Item 1. Team will travel by unsafe rib. If team members contact/cross the unsafe rib, dock them 15 docks each member endangered, under Underground Judge #1, Item 10(a)(1). Team Stop #5 The team wil travel across to the 2B intersection. Team will find an explosive mixture in the intersection, and water over knee deep to the north. The captain must DI the water over knee deep. A gas check must be made north, west and south of intersection. If the team does not notify the fresh air base of the explosive mixture, dock them 10 x each omission, under Underground Judge #1, Item 14. If the captain does not DI the water over knee deep, dock them 2 docks x each omission, under Underground Judge #1, Item 9. If no gas test is made, dock them 1 dock x each gas, each omission, under Underground Judge #2, Item 1. If team members travels beyond the “water knee deep”, dock them 15 docks each member endangered, under Underground Judge #1, Item 10(a)(2).

Exploration Team Stop #6 Team will travel/tie across to the 1B intersection. The team will find a lunch box and inside a note (HELP I AM BARRICADED IN #2 FACE, GET ME OUT FIRST). Team will find the unsafe roof south of the intersection. Captain will do a RR and must DI at the unsafe roof and a GT must be made north and south. NOTE: The placard for the body will be facedown. The team cannot consider the location of the body in the unsafe roof as being known, since the captain has not explored into the unsafe roof yet. If the captain does not verbally indicate – checking the back, or roof dock them 5 x each omission, under Underground Judge #1, Item 8(b). If the captain does not DI the caved area and unsafe roof, dock them 2 docks x each omission, under Underground Judge #1, Item 9. Team Stop #7 Team can advance any heading but will probably travel up the # 1 heading to the 1C intersection. A GT must be made both north and east of the intersection. Team Stop #8 Team will tie across to the 2C intersection. The team will find the water over knee deep south of the intersection. The captain must DI at the water over knee keep. A GT must be made north and south. NOTE: The placard for the body will be facedown. The team cannot consider the location of the body in the water over knee deep as being known, since the captain has not explored the area yet.

Exploration Team Stop #9 Team will advance to the 2D intersection. The team will find an irrespirable mixture in the intersection outby the barricade. A GT must be made in all three openings north, east and west. The team must not go more than three feet inby the intersection because of the 2 by 3 rule. (Barricade is located 5 foot inby intersection. If captain or team member goes 3 feet beyond x-cut without being tied in, dock them 4 under Underground Judge #1, Item 11. (Make sure team ties back in #3 heading) Team stop 10 Team will tie across to the intersection in the 3D intersection. Team will find an explosive mixture in the intersection. A GT must be made north and south. If the team does not notify the fresh air base of the explosive mixture, dock them 10 x each omission, under Underground Judge #1, Item 14. Note: Team can advance all the way to the barricade because the 2 by 3 rule does not apply in this heading. When the barricade is knocked on, there is no response from behind the barricade and must DI the barricade. The team will tie back in the #3 heading by traveling south in this heading.

Exploration Team Stop #11 The team can now travel to the barricade inby 2D intersection. When the barricade is knocked on the conscious live person inside the barricade will start yelling (HELP, HELP, GET ME OUT, ITS GETTING HARD TO BREATH, I HAVE A SOLID FACE BEHIND ME). The captain must DI at the barricade and a GT must be made at the barricade. (Make sure the (3 TIMBERS) placard is turned over so the team can’t read until barricade is breached. Team Stop #12 The team will advance / tie across to the 1D intersection. A GT must be made north and south of the intersection. The team will find a 36 INCH VENTILATION SHAFT some equipment and a face the captain must DI at the face and a GT must be made at the face. Note: If team advances to the 1D intersection from team stop #7. The team will find a 36 INCH VENTILATION SHAFT some equipment. The team must not go more than three feet inby the intersection because of the 2 by 3 rule. If captain or team member goes 3 feet beyond x-cut without being tied in, dock them 4 under Underground Judge #1, Item 11. (Make sure team ties back in #3 heading) Exploration is done.

Ventilation #1. Note: The team must be careful not to push the explosive mixture over the equipment. At this time, if the team has explored as discussed, the barricade in #2 heading can be ventilated (See Ventilation #1). NOTE: Team must build temporary stoppings: 1.) between #1 and #2 heading in Crosscut A; 2.) between #1 and #2 heading in Crosscut B; and 3.) in #1 heading between Crosscuts C and D. After these ventilation controls are completed, the team can open the temporary stopping in #1 heading immediately inby the FAB. Then the team will build temporary stopping west of FAB. To direct air toward the barricade, the team must also erect a “wing curtian” in Crosscut D. After the team has ventilated the barricade, the barricade can be breached. No air lock is required since the live person provided adequate information. The captain must make a GT after the barricade is breached. Inside the barricade, the team will find a conscious live person, three timbers, and a face. The captain must DI at the patient. A patient assessment must be conducted on the conscious live person. If the team fails to adequately examine and assess patient. Dock 4, Underground Judge #2, Item 14b. The captain must do a RR at the face and DI at the face, and GT must be made at the face. The team must now bring the patient to the FAB.

. The team will have to ventilate the explosive/irrespirable atmosphere in front of the barricade in #3 heading. The team will have to set timbers through the unsafe roof in the #1 heading. Here the team will find a body. The captain must DI at the body, then finish timbering through the area. (See Ventilation #2). NOTE: Team must build additional temporary stoppings: 1.) between #1 and #2 heading in Crosscut D; and 2.) build south of the “water over knee deep” in #2 heading and 3.) between #1 and #2 heading immediately to the west of the FAB (build Last). After theses ventilation controls are completed, the team can open the temporary stopping in the #2 heading immediately inby the FAB. To direct air toward the barricade, The team must also erect a “wing curtain” in Crosscut D. After the team has ventilated the barricade in #3 heading, before breaching the barricade, an air lock must be constructed since there was no response behind the barricade. The captain must make a GT after the barricade is breached. Inside the barricade, the team will find a unconscious live person and a face. The captain must DI at the unconscious person. A patient assessment must be conducted on the unconscious live person. The unconscious person must be placed on a stretcher and brought to the FAB that way. If the team does not properly secure the survivor to stretcher; failure to cover survivor with blanket. Dock 4, Underground Judge #2, Item 13. Once the team is at the FAB. The team must insure the explosive mixture is cleared and then the pump can be energized. After the water over knee deep is pumped down, the captain must explore through the area. Here they will find a body. The captain must DI at the body. The team can now return to the FAB and the captain can stop the clock. If the team does locate the body, dock 50, Underground Judge #1, Item 16. Ventilation #2

X PUMP SWITCH OFF X X X X X X X X X PUMP CABLE XXXXXX CAVED 6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 B B 6.9% H 2 S 16.1% O 2 UNCONSCIOUS LIVE PERSON 3 TIMBERS DRILL MACHINE CONSCIOUS LIVE PERSON HAUL TRUCK 36 INCH VENTILATION SHAFT UPCAST WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT LUNCH BOX FRONT END LOADER FAB X GAS TEST STATION X X X X X X X X PUMP CABLE X PUMP X OIL CAN HARD HAT WATER OVER KNEE DEEP X 6% H 2 S 19.9% O 2 6.9% H 2 S 19.9% O 2 1% H 2 S 19.9% O 2 FACE VENTILATION #1 BUILD LAST REMOVE BUILD HANG 2.9% H 2 S 16.6% O Maysville

X PUMP SWITCH X X X X X X X X PUMP CABLE X XXXXXX CAVED 6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 B AIR CLEAR UNCONSCIOUS LIVE PERSON AIR CLEAR 3 TIMBERS DRILL MACHINE CONSCIOUS LIVE PERSON HAUL TRUCK 36 INCH VENTILATION SHAFT UPCAST WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT LUNCH BOX FRONT END LOADER FAB PUMP SWITCH OFF X X X X X X X X PUMP CABLE X PUMP X OIL CAN HARD HAT WATER OVER KNEE DEEP GAS TEST STATION AIR CLEAR 1% H 2 S 19.9% 0 2 FACE VENTILATION #2 REMOVE BUILD LAST BUILD REMOVE BUILD HANG AIR CLEAR 2013 Maysville

XXXXXX CAVED 6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 B B 6.9% H 2 S 16.1% O 2 2.9% H 2 S 16.6% O 2 3 TIMBERS DRILL MACHINE HAUL TRUCK 36 INCH VENTILATION SHAFT UPCAST WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT LUNCH BOX HELP I AM BARRICADED IN #2 FACE GET ME OUT FIRST FRONT END LOADER FAB 6% H 2 S 19.9% O 2 6.9% H 2 S 19.9% O 2 1% H 2 S 19.9% O 2 FACE Field Map GT DI RR DI GT RR DI GT GT DI RR GT DI GT GT RR DI GT GT RR DI GT GT DI GT GT RR DI RR GT DI GT DI GT 11 GT A B C D 2 3 x x x x x x x x x x x x x x x x x PUMP CABLE PUMP SWITCH OFF GAS TEST STATION PUMP CABLE FIRE HOSE UNSAFE RIB OIL CAN PUMP WATER OVER KNEE DEEP HARD HAT MINE PHONE SAFETY GLASSES Person Kenny Stabler #2640 Person Trent Richardson #2141 Person Jay Barker #9876 Person Johnny Musso # Help, Help, get me out. Its getting hard to breath. I have a solid face behind me 2013 Maysville

6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT FAB Ventilating for #1 x x PUMP CABLE PUMP SWITCH OFF 2013 Maysville Team must air lock into and out of #2 heading every time during #1 ventilation B B BUILD LAST

6% H 2 S 19.9% O 2 6.9% H 2 S 20.1% O 2 WATER OVER KNEE DEEP BUCKET OF OIL HARD HAT FAB Ventilating for #2 x x PUMP CABLE PUMP SWITCH OFF 2013 Maysville B B Team must air lock into and out of #2 heading during ventilation #2. Once these stoppings are established air locking will not cause team to be docked. Team must air lock into barricade