Transportation and Storage in Lääne-Viru County Lääne-Viru Development Center 2013 Investor consultant.

Slides:



Advertisements
Similar presentations
Stimulating Entrepreneurship in Rural Areas of Latvia.
Advertisements

2013. Invest in Finland focus areas 2013 Datacentres Green Building Hi-Tech Software Mining Research, Development and Innovation Travel Wind Energy.
New opportunities for regional development through cross-border cooperation Ministry of Environmental Protection and Regional Development November 16,
Wood Processing in Lääne-Viru County Lääne-Viru Development Center 2013 Investor consultant.
Role and potential small and medium-sized urban areas Latvia’s case
SILPORT Port of Sillamäe SILPORT Port of Sillamäe SILPORT – THE CLOSEST EU PORT TO RUSSIA.
WHAT CAN ESTONIA SOLVE FOR YOU?
Reasons to invest in Paraguay UK-Paraguay Trade & Investment Forum Nov German Rojas Irigoyen Minister of Finance - Paraguay.
Industrial park “Letnitsa”. Geographic situation IPL.
Construction Industry in Poland Halmstad University Construction management Piotr Mazur Adam Osiński Piotr Stolarski Paulina Wawryca Łukasz Piecyk Paweł.
An Opportunity for Sustainable Investment
Why Latvia? Baltic Renewable Energy – Latvia. Latvia is positioned for potential Baltic Renewable Energy – Latvia Population: Total EU Canada/US.
Categories of Industry Unit 6. Categories of Industry Primary sector ▫Extractive industries Secondary sector ▫Manufacturing and construction Tertiary.
A free economic zone is manufacturing area designated for business development with tax benefits established by law.
How to Revolutionize Exports? The Case of Estonia Anu-Mall Naarits General Manager Marketingi Instituut.
MANUFACTURE IN MOSCOW! LOCALISE YOUR PRODUCTION BASE!
INDUSTRIAL SPECIAL ECONOMIC ZONES IN RUSSIA STATE MANAGEMENT COMPANY «SPECIAL ECONOMIC ZONES» INDUSTRIAL SPECIAL ECONOMIC ZONES IN RUSSIA STATE MANAGEMENT.
F OREIGN INVESTMENTS IN THE BALTIC STATES UIA 58th conference in Florence, Italy October 29 – November 2, 2014 Yvonne Goldammer bnt attorneys-at-law.
Vinni-Pajusti Industrial areas In the region Vinni-Pajusti about 1,800 people accomodate, representing one third of the population in Vinni parish. So.
Central and East European Market for IT Outsourcing: Advantages and Impediments Valdis Lokenbahs, President, DATI Lithuania Roundtable Vilnius, December.
ESTONIAN TAXES AND TAX STRUCTURE. Population ( )1,339,662 Total area 45,227 km 2 Average salary (2010)792 EUR (2011 IV quarter)865 EUR Currency.
Kyiv, May 16, 2005 Business Environment in Slovakia and Potential Learnings.
Metal Industry In Lääne-Viru County Lääne-Viru Development Center 2013 Investor consultant.
Rakvere city Industrial area. Rakvere city is divided into 19 districts.Rakvere is based on three neighboring district – The old town, the city center.
Your Next Investment Destination? “Among top 10 European cities by FDI strategy”, - Financial Times.
Engineering Industries Association of Lithuania „Linpra“ 1 Riga 2014 December.
and Project  Outsource2Lithuania” Baltics ICT:  Lithuania – Aiming the Europe.
Wood Pellet Furnace Wood Pellets ? ?? ?? .....
IT Market Research Report on Latvia Tatiana Rikure Inga Bakane.
There are two industrial areas :  production and development zone near Kunda port, total area 130 ha;  development zone in Tööstuse Street, total area.
Development of Road Haulage market: challenges and opportunities author of the presentation Oskars Juhnevics.
Republic of Latvia Nexia Annual Conference, Delhi, October 2008.
International pharmaceutical cluster Pharma World Corporate Presentation.
Food Industry in Lääne – Viru County Lääne-Viru Development Centre 2013.
Belgrade Investment Days September 2015 Belgrade.
DEPARTMENT OF ENVIRONMENT & SUSTAINABLE DEVELOPMENT Konstadinos Konstadakopoulos Head of Department Lefteris Alexopoulos Environmental Consultant 2 nd.
Estonian economy – implications of “smallness” Eve Parts (PhD) University of Tartu, Estonia NBSS Economic Workshop, Reykjavik, November 18, 2011.
COORDINATION OF INNOVATION STRATEGIES/SCHEMES IN METROPOLITAN AREAS. THE ROLE OF PUBLIC POLICIES. WHY OUR INNOVATION MANAGEMENT SCHEMES ARE APPOPRIATE.
22ha site suited for industry & logistics GUGESTI, ROMANIA:
Lithuania's ICT Potential. 2 GENERAL INFORMATION ABOUT LITHUANIA  Population: 3.5 mln.  Area: 65,300 sq. km  Language: Lithuanian  Neighbours:  Latvia.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
life better Municipality of Prokuplje.
INDUSTRIAL PARK MISSION Industrial Park mission is to create favorable conditions for the development of small and medium-sized companies Establishing.
Key data of Lithuania. Development of new business and administration centre in the City of Vilnius.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
Chapter 2 – Economy and Development Mr Wilson History 404 A Quick Overview…
Haljala municipality Industrial area Location: Location in the north of Estonia: Tallinn 55 min, 90 km Tallinn airport 60 min Tartu 130 km Narva 124.
EU Countries with Flat tax system Lithuania24% Latvia25% Estonia22% Slovakia19% Bulgaria(from 1 January)10% Romania16%
IGCSE®/O Level Economics
International pharmaceutical cluster Pharma World Corporate presentation.
Panevėžys your next business location. Panevėžys | your next business location Lithuania Delivery time in days 4 d 3 d 1 d 2 d Flight time in hours 4.
5.5 Location Chapter 34. Picking a Location  Location decisions have 3 characteristics:  They are strategic – they have a long term impact on the business.
Invest in Moscow Region. Moscow Region Development Corporation State Institute for the development of Moscow Region industrial parks infrastructure Agent.
SLOVENIA in brief Area: 20,273 sq. km Capital: Ljubljana Population of 2 million EU member state - May 2004 Euro zone - January 2007 OECD member - July.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
Doing Business in Estonia & Estonia's Economic Perspectives Siim Raie Director General Estonian Chamber of Commerce and Industry
BCCI Bulgaria - The Right Place for Investment. Positioning Bulgaria Why Bulgaria Macroeconomic indicators FDI inflow Business sectors of highest potential.
Investment Opportunities in Bosnia and Herzegovina Oct 27 th, 2009 Eldin Kajevic Consul General Consulate General of Bosnia and Herzegovina in Chicago.
1. 2 Right place, Right people for Your Business.
Ida- Virumaa Industrial Areas 2010 Teet Kuusmik – Foundation Ida- Virumaa Industrial Areas Development member of the board.
TAMSALU MUNICIPALITY. Tamsalu Municipality Situates in West-Wiru county. Situates in West-Wiru county. Belongs to Pandivere Region. Belongs to Pandivere.
Albania Trade and investment opportunities
Who we are: InvestBulgaria Agency is a government investment promotion arm, part of the Ministry of Economy IBA services: Macroeconomic data on Bulgaria.
Business Environment in Latvia
Export & investment potential of st. petersburg
NATIONAL COMPANY INDUSTRIAL ZONES
The Road Transport Village in Estonia
Energy Sector Overview
INVESTMENT ADVANTAGES
Presentation transcript:

Transportation and Storage in Lääne-Viru County Lääne-Viru Development Center 2013 Investor consultant

Sustainable competitiveness in business services Estonia offers distinctive opportunities for business service centres for both in-house and outsourced solutions. Estonia is the emerging Nordic location and an excellent gateway between Northern, Western and Eastern Europe and Russia. Estonia offers sustainable, high-quality, competitive costs and low risk solutions for BPO, IT and financial services shared service centres, customer and technical support centres. Enterprise Estonia is here to help you achieve and maintain these competitive advantages.

Why Estonia?  Quality technical skills  Foreign language skills  Competitive costs and taxes  Cutting-edge ICT infrastructure  Strategic location and global vision  Easy to do business  Low risk: economic & political stability  Room for growth: a sustainable solution  Supporting your investment

Why should you set up business in Lääne-Viru County ? Closeness to important markets: the largest Estonian market in Tallinn and Harju County, the largest Finnish market in Helsinki region, one of the largest Russian markets in St. Petersburg region; Closeness to important business areas: the largest Estonian business areas in Tallinn, Harju County and Ida-Viru County; Helsinki region ; Closeness to the largest sources of Estonian labour force: Tallinn, Harju County and Ida-Viru County ; A good transport network ; Existing business areas that offer various services (including electricity and gas supply); Various existing companies: building materials, wood processing, food industry, metal and engineering industry, electronic industry; A good living environment with a normal social infrastructure and recreation opportunities

Business enviroment in Estonia Estonia's economy offers key opportunities for companies in a number of sectors including ICT, electronics, machinery and metalworking, wood processing, logistics/transport and food. The R&D elements of these activities are supported by the country's 10 universities and 25 higher education colleges, which collectively provide a source of graduates, often fluent in English, Swedish, Russian, Finnish and German.ICTelectronicsmachinery and metalworking wood processinglogistics/transportfood Estonia has been ranked 16th in the Index of Economic Freedom (2012, Wall Street Journal/The Heritage Foundation), 24th in the Ease of Doing Business Report (2012, World Bank), and 33th in the Global Competitiveness Report (2012, World Economic Forum). Estonia has some of the highest credit ratings in the region (Fitch IBCA, Standard & Poor's, Moody's).

Business enviroment in Estonia Estonia is a member of euro area as of January 1, % corporate income tax is imposed on all reinvested earnings in Estonia. The Estonian cost level is still significantly lower than that of neighboring Scandinavian countries. In Estonia, all capital is treated equally, foreign or domestic. Estonia is a member of the International Center for the Settlement of Investment Disputes, the Multilateral Investment Guarantee Agency, and the New York Convention. Estonia is the leading country in Central and Eastern Europe in terms of attracting foreign direct investments. Estonia is one of the leading countries in the world in creating and implementing e-government solutions and cyber security

Location Situated in northern Estonia. Bounded by Ida-Viru County on the east, south and west of Jõgeva, Järva and Harju counties. Bounded on the north by Gulf of Finland Fifth most populated county in Estonia, with the population of people Territory is 3609 sq km and we are the third largest county in Estonia. Divided into 15 municipalities (13 rural municipalities and 2 towns). Rural population is 55% The largest municipality is town Rakvere with inhabitants, being the county center as well

Connections

Transport and logistics Lääne-Viru County has a very favourable logistic location by the sea, between Tallinn on one side and Ida-Viru County on the other side. Rail link with St.Petersburg and Pskov (Russia) and Riga (the Baltic States, Belarus, the Ukraine) Port of Kunda – located 26 kilometres from Rakvere Close to Tallinn-Narva highway (Rakvere – Tallinn 98 km, Rakvere – Narva 120 km) Rakvere-Väike-Maarja- Vägeva highway (Rakvere – Tartu 135 km) Sõmeru- Rakvere –Pärnu highway (Rakvere – Pärnu 178 km) International road transport companies: transport operations all over Europe as well in Russia and in the Ukraine Storage terminals for chemical and oil products Airport in Tallinn – 98 km

Power network Electric power reaches Estonian households and companies with the help of Eesti Energia Jaotusvõrk OÜ which provides services for 87,7 % of Estonian electricity consumers. Lääne-Viru County is supplied by a network of power lines with a total length of 5235 kilometres, 4520 kilometres of it is made up by overhead transmission lines. In the financial year 2010, over 2.58 million € was invested by the distribution network in the renovation of the power network of Lääne-Viru County. Nearly half of that sum was spent on the installation of underground cable lines. In 2011 the focus was on replacing overhead transmission lines with underground cable lines, the company replaced 80 km of lines with underground cable lines. The distribution company invested about 2.88 million € in 2011 in Lääne-Viru County for the construction and renovation of networks. In addition, maintenance and repair work necessary for sustaining the operating reliability is carried out.

Regional workforce skills and costs Estonia has relatively low taxes and a simple tax system. Currently there is no corporation tax ( tax is not imposed on reinvested profit) Income tax on dividends forms 21/79 of the dividends received. Value added tax is 20 per cent with just a few exceptions. The average labor cost per hour worked in transport sector was 5,98 eur ( year 2008) Educational level in Lääne-Viru County Statistics 2011 (people, thousands) Primary education or lower 5.2 Secondary, post secondary and pre tertiary education 17.3 Tertiary education9.2 Education after secondary education2.7 Higher education, mater`s doctoral degree 5.5

Taxes and duties Rate of tax on income 21%. Additional tax-exemption income when accidents at work or occupational disease benefit is 64 euros monthly Social security tax is 33%. The minimum obligation base monthly rate for social security tax is 290,00 euros, which means that the minimum obligation social security tax is 95,70 euros monthly. Unemployment tax for the worker is 2%, for the employer it is 1%.

Taxes and duties The company must be registered as a VAT payer when from the beginning of the calendar year, turnover is in excess of 16,000 euros, on a voluntary basis can be registered also earlier. When the company is registered VAT payer in Estonia and starts to use the imported (equipment, goods) for goods under VAT too, it can deduct VAT paid at customs on these good from its taxable supplies VAT. Each month for the 20 th is needed to present a tax return when registered VAT payer, VAT return form KMD. VAT payer can read from the registration requirement of § 19 VAT law (law is also available in English). When the company will make special payments or other distributions paid in Estonia, and the company already is registered in Estonia, then you may re-turn to the specific tax questions also directly at

Labor costs The average wages in Estonia in 2011 was EUR 839. The monthly minimum wage for full-time work is EUR 290. Approximately three to four times lower labour costs, compared to Scandinavian countries, in miscellaneous business activities sectors. More than three times lower labour costs in the computer related services sector compared to the EU27 average. Accountant – 15 Credit control officer – 4 Head of finance and administration – 1 Junior accountant – 28 Senior accountant – 9 Customer service manager – 5 Computer operator – 2 Data entry clerk – 9 Office services specialist – 2 Secretary – 4 Source: fDiBenchmark.com, spring 2012

Transportation and storage in Lääne- Viru County Traditional and advanced sector Logistically good location and road network, equal distance to all big cities, Kunda port, Russia`s neighborhood Opportunities for professional and additional training to the staff Good location for establish the terminals Industrial areas (Kunda, Rakvere, Kadrina, Tamsalu, Tapa) 189 companies 971 employees Revenue EUR Export EUR Profit EUR

Industrial areas in the Region Rakvere Industrial Area Reconstructed infrastructure Good logistical position of the highway (Tallinn-Narva), railroad and port of Kunda Good labor force potential in urban and in near rural municipalities Perspective of bringing one of railway line to industrial park Perspective of developing airport for serving enterprises Existing neighborhood of the Estonian energy and natural gas distribution network Possibility of developing the industrial park area existing residential areas and residential land to allow the relocation of labor The business environment in addition to a quality living environment Opportunity to provide affordable and cheaper production costs, while logistically well-located plots (eg Harju county companies)

Industrial areas in the region Tapa Industrial Area The industrial park is located in the south- western part of Tapa. The area has access to a railway line owned by the town and a good entrance road. A water and sewerage network was built on the territory of the industrial park. A new high voltage line and two new substations supply the area with electricity. Total area: 50 ha Distances: Tallinn 100 km, 70 km by railway Rakvere 30 km, Technical networks: Electricity 2*1000 KVA,substation and 2*630 KVA substation. Heating can be purchased from the boiler- house of a timber-processing enterprise. Communications cable available in the centre of the industrial park, water and sewerage available. The area of business is expected to: - wood products manufacturing industry; - cluster companies servicing companies (wood cluster, metal cluster); - companies related with logistics - production must be environmental friendly; - production should not be labour intensive. The area of business is expected to: - wood products manufacturing industry; - cluster companies servicing companies (wood cluster, metal cluster); - companies related with logistics - production must be environmental friendly;

Industrial area in the region Kunda Industrial Area Total area: 130 ha Vacant area: 113 ha Location: in the northern part of Kunda Buildings: none Tehnical networks: road access, port Neighbours: AS Port Kunda, AS Baltic Tank Restrictions: production area borders the Gulf of Finland in the north, therefore relevant restrictions under the Law on Nature Protection apply. Desired use: production area, storage area Kunda PORT - The port of Kunda belongs to AS Kunda Nordic Tsement. At the moment liquid- and dry products’ terminals are operating, in addition to exporting Estonian Cell’s products. Also around a 5000 m2 hangar is being built for weather-sensitive cargo. The port’s territory is 14 hectares and the circulation of products more than 1,7 million tonnes. Railroad - Kunda-Rakvere railroad belongs to AS Kunda Trans and is used for transporting cargo. Truck transport - Truck transport in Kunda is organised by Lajos, Kunda Auto etc Traditional branches of economy: production of construction materials logistics - railway- and motor transport port metallurgical industry wood production industry

The biggest suppliers in the region AS Lajos AS Lajos is a 100% private capital based company that will celebrate its 20th birthday in In 1992 AS Lajos started its business in Kunda Lääne-Virumaa by offering national transport services. The truck and trailer service area was enlarged in the autumn of 1995, which enabled to offer services to different clients. The spare parts shop was opened in 1997 in Kunda. A new branch, SIA Lajos LV, was opened in 2008 in Latvia. The new office and service building was completed in the summer on 2009 in Kunda. In 2010 a new sub company was opened in Lithuania, UAB Lajos LT. In 2010 the sales turnover of AS Lajos was about 6 million Euros and AS Lajos had 63 employees. The 32 trucks of AS Lajos’ fleet guarantees the client a fast and operative transport service. We offer the following services: National and international transport Car accessories and spare parts sales Car and truck repairs Carwash for cars and trucks

Biggest suppliers in the regions Kunda Trans AS Main occupation: railway transport, road freight transport, storage. Estableshed at Basic capital: EUR. Turnover: (2011) EUR, (2010) EUR Profit: (2011) EUR; (2010) EUR Export turnover: (2011) EUR; (2010 ) EUR; Kunda Auto AS Main occupation: road fright transport. Established at1990. Kunda-Auto AS has international trucking license, International Road Carriers Association license, 18 employees. Turnover: (2011) EUR; (2010) EUR Profit: (2011) EUR; (2010) EUR Kunda Mobil AS AS Kunda Mobil oestablished at1995. Main occupation: domestic trucking with tipper semi-trailers. Teostame ka rahvusvahelisi autovedusid. AS Kunda Mobil has been member of International Road Carriers Association since1996. Turnover: (2011) EUR; (2010) EUR Profit/loss: (2011) EUR; (2010) EUR

Foundation Lääne -Viru Development Centre Investor consultant Phone nr: