April 22, 2002David Finley to TD HQ Slide 1 RF Technology Development Group Mission The mission of the.

Slides:



Advertisements
Similar presentations
F October 4, 2001David Finley to FARDOG at FermilabSlide 1 Status of X-Band Structures Fabrication Our First X-Band Structure Progress of RF Factory at.
Advertisements

NLC - The Next Linear Collider Paul Czarapata Engineering Test Facility What is it and what does it do?
Cockcroft Institute LC-ABD plenary April 2007 ILC Crab Cavity Collaboration Cockcroft Institute : –Richard Carter (Lancaster University) –Amos Dexter (Lancaster.
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Euclid TechLabs LLC, founded in 1999 is a company specializing in the development of advanced designs and new dielectric materials for particle accelerator.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
May 9, 2002David Finley to NLC Fermilab Slide 1 Linear Collider R&D at Fermilab David Finley NLC MAC.
F D. Finley / Fermilab FARDOG / January 4, FARDOG 04JAN01 Discussion of FY01 Budget and Goals for RF Structures.
1 Charged Kaons at the Main-Injector Measuring |V td | with K +   + Peter Cooper, Fermilab March 26th, 2003 P5 Review. I.Experimental Technique. II.Activities.
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
October 25, 2001David Finley to NLC SLACSlide 1 Status of X-Band Structure Fabrication at Fermilab Our First X-Band Structure Progress of RF Factory.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
Tuesday, April 22, 2014MAT 312. Tuesday, April 22, 2014MAT 312.
MCTF Fermilab’s Muon Collider Task Force. MCTF - Shiltsev 2MCTF The need Charge/deliverables Current activities Research Directions/Org Structure First.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Fermilab April 5, 2002 Fermilab/NICADD Photoinjector Laboratory (FNPL): Collaborative R&D Gerald C. Blazey Northern Illinois Center for Accelerator and.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
F March 31, 2001David Finley / Fermilab Saturday Morning Physics Slide 2.1 Saturday Morning Physics - Accelerators Accelerators What’s Up Now? What’s Up.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
Proton Driver Status Bob Kephart August 25, 2004.
June 15, 2002David Finley to Aspen PAC Slide 1 Report on 132 nsec Operation Report to the Fermilab.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
Project X goals and organization Sergei Nagaitsev October 4, 2011.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
O. Kester, NuSTAR annual meeting, 27/02/2013
LCLS-II Prototype Cryomodule FDR J. Blowers, C.M. Ginsburg, T. Peterson, R. Stanek, J. Theilacker (FNAL) 21 – 22 January 2015 Homework Responses.
N. Dhanaraj 1 Single Cell Program - Status Single Cell Program - Status March 1, 2007 Thursday.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
District Test Coordinator
ILC R&D Board Meeting: SRF Cavities Status and Plans
Preparations for a Lehman Review
CEPC RF Power Sources System
Collaboration Board Meeting Closing Hasan Padamsee
District Test Coordinator
ERL2015 WG4: RF & superconducting RF for ERL
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Thoughts on Energy Reach
LINAC OPS Budget Review
ILC Main Linac Superconducting Splittable Quadrupole
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

April 22, 2002David Finley to TD HQ Slide 1 RF Technology Development Group Mission The mission of the Technical Division: "The development, design, fabrication or procurement, and testing of accelerator and detector components.” The mission of the RF Technology Development Group: "The development, design, fabrication or procurement, and testing of RF cavities and structures for future accelerators.”

April 22, 2002David Finley to TD HQ Slide 2 RF Technology Development Group Activities Present Activities XBand and NLC Main Linac Beam Line Units* * includes adjustable permanent magnets Superconducting RF Group has four teams XBand, SRF, Physics, RF Engineering Finley: Carter, Terechkine, Solyak, Romanov Physics and RF Engineering support XBand and SRF

April 22, 2002David Finley to TD HQ Slide 3 People and Teams D. Finley / Group Leader N. Solyak / Physics G. Romanov / RF Engineering T. Khabiboulline I. Gonin H. Carter / XBand T. Arkan C. Boffo E. Borrisov Brian Smith Future Technician I. Terechkine / SRF Connections to others* These support these * Most XBand members support SRF

April 22, 2002David Finley to TD HQ Slide 4 TD Administrative Items Team Leader Meeting 2nd and 4th Tuesday 9AM Club 157 Starting April 23, 2002 Charging time correctly Performance Reviews Training determined by supervisor TD Signature Authority (soon to be completely true, I hope) Yarba / Finley to $20K; Kephart to budget limit RAT (NLC): Carter and Arkan (if OK w/ Carter) to $5K MAT (NLC): Kashikhin to $5K GAT (NLC): Carter to $5K DRF: Terechkine to $5K TRF: Peterson / Lamm to $5K

April 22, 2002David Finley to TD HQ Slide 5 Other Connections / Features Finley: also $5K on all BD NLC codes NLB (RF), NLD (magnets), NLx (dormant) Solyak: Run II TEL, 3 rd harmonic Terechkine: No one directly reports to him Good = fewer admin duties, Bad = no direct support Helen Edwards has determined srf program I believe she intends to obligate DRF M&S in FY02 on a 3.9 GHz Powerstation at A0 How to get non-TD connections to RF R&D? Commit to $50K / year for 805 MHz RF R&D Collaborate with JLab and Argonne (at least) Photoinjector III is “next big deal”

April 22, 2002David Finley to TD HQ Slide 6 FY02 Budget and Obligations thru March 31, 2002 Fermilab LC R&D $4.7M Total Fermilab $2.5M NLC capped $2.2M SRF ~24.5 FTEs $2.26M M&S

April 22, 2002David Finley to TD HQ Slide 7 FY02 Budget and Obligations thru March 31, 2002 TD LC R&DBD LC R&D Note: BD SRF is: $0.9M for support of operation of FNPL Photoinjector at A0 plus $0.15M for CKM cavities

April 22, 2002David Finley to TD HQ Slide 8 FY02 Budget and Obligations thru March 31, 2002 These are Costs “zero” in 1Q and 100% 1 FTE in Dec A couple of choices to obligate quickly RAT overcharged; See DRF DRF Under reported by about 1.5FTE in Feb & Mar; 3.9 GHz in the wings 8 GeV srf under reported in Feb & Mar