Sligo County Council in Partnership with the Federation of Group Water Supply Schemes. ‘ Progress on the construction of the group water supply bundles.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

VISION & MISSION OF KeNHA VISION : Quality, safe and adequate National Road Network. MISSION : Provide quality National Road Network for sustainable social.
Interested in Neighbourhood Planning in Cotswold District?
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATION 19 OCTOBER 2010.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Development of the Wastewater Collection and Treatment System in Szombathely County Town Implementation of sewage-sludge Composting Plant 2003/HU/16/P/PE/021.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
Theme 7: Occupational Health and Safety Act 85 of 1993
Process Engineer’s Role in Project Management Dr Abdullah Malik.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
Valuations and interim certificates. Purpose Value the works taking account of: – the physical work done on site; – any extra work ordered by the client;
Risk Assessment – An Essential Standard
Understanding Financial Management
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
PORTFOLIO COMMITTEE PRESENTATION: PROGRESS REPORT ON KEY CONTROLS (MOVING TOWARDS UNQUALIFIED REPORT) TO MONITOR AND EVALUATE RELIABILITY OF FINANCIAL.
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Civil Works Progress ADB Loan No CAM(SF) / AusAID Grant No.0096-CAM 23 April 2012 GMS-SCCP Improvement of NR33 (15.83 Km Kg Trach to Preak Chak)
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
Thriving communities, affordable homes South East London Housing Partnership HCA apprenticeships & skills activities Liz Cowie 28/07/2010.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
COMPLIANCE WITH THE SIGNING AND FILING OF PERFORMANCE AGREEMENTS BY HEADS OF DEPARTMENT BRIEFING TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION.
A wide range of clients Housing associations 3 rd sector bodies Private companies supplying services to the public sector Colleges and government bodies.
SLIGO COUNTY COUNCIL RURAL WATER PROGRAMME. BACKGROUND Devolution of Responsibility for Group Water Schemes to Local AuthoritiesDevolution of Responsibility.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Copyright FDA Inspections: Where Do Things Go Wrong? Diana Naser RN, MS, CCRP Executive Director Clinical Research Administration Clinical Research.
Head Office Hannay House 39 Clarendon Road Watford Hertfordshire WD17 1JA UK Telephone: +44 (0) Facsimile: +44 (0)
Water Services National Training Group and National Federation of Group Water Schemes 7 th Annual Rural Water Services Conference 18 th September 2008.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
PRTR Project reporting Steering Committee Meeitng and Inception Workshop PRTR Project November 2015 UNITAR/GEF/PRTR2/SCM1 Pre 10.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Water Services National Training Group and National Federation of Group Water Schemes 7 th Annual Rural Water Services Conference 18 th September 2008.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Marketing to Main Contractors Winning Work from a Main Contractor Paul Clarkson Iain Flatters Construction Director Group Procurment Manager.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Developing a Local Authority Policy for Safety Audit Jo Horton - Road Safety Engineer Kent County Council
Roles and responsibilities PM
York, North Yorkshire & East Riding Local Enterprise Partnership Bio-economy Growth Fund Application process September 2016.
Internal Audit & Accounting Systems Review
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Temporary Works Co-ordination
Role & Responsibilities
Role & Responsibilities
DTF implementation Roles and responsibilities
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Introduction DEFINATION :-
BI-19 Process Improvement
Role of the External Examiner
Richland Creek Water Supply Program Program Update
Construction Management Services April 16, 2018
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
SADC PPP Network PPPs in SADC
Presentation transcript:

Sligo County Council in Partnership with the Federation of Group Water Supply Schemes. ‘ Progress on the construction of the group water supply bundles in Sligo’ ‘ Progress on the construction of the group water supply bundles in Sligo’ Pat Doyle,Project Engineer. Pat Doyle,Project Engineer. 8 June 06 8 June 06

Sligo d.b.o. bundles NORTH BUNDLE COST €2,545,749 1Ballintrillick gwss. 2 Benbulbin gwss10m/3/h. 3Castletown gwss.8m/3/h 4 Drum east gwss 20m/3/h. 5Beltra gwss.10m/3/h 6 Kellogoboy gwss 12m/3/h SOUTH BUNDLE COST €2.936,588 7Castlebalwin gwss.35m/3/h 7Castlebalwin gwss.35m/3/h 8Corrick gwss.10m/3/h 8Corrick gwss.10m/3/h 9 Culfadda gwss. 9 Culfadda gwss. 10 Geevagh Highwood gwss.52m/3/h 11 Keash gwss 12m/3/h CONTRACT SIGNED ON APRIL CONTRACT PERIOD 12 MONTHS CONTRACT PERIOD 12 MONTHS The contractor will maintain these plants for 20years. CONTRACTOR --TREATMENT SYSTEMS LTD. Kilkenny CONTRACTOR --TREATMENT SYSTEMS LTD. Kilkenny

Easkey Lough Easkey Lough Talt Lough Gill Sligo Grange Lough Na Labe North West Group 1.Drum East (250 Houses) 2.Benbulben (53 Houses) 3.Ballintrillick (112 Houses) 4.Castletown (58 Houses) 5.Keelogyboy (92 Houses) 6.Beltra (81 Houses) Ballymote Lough Bo Lough Arrow South East Group 7.Geevagh Highwood (388 Houses) 8.Castlebaldwin (280 Houses) 9.Carrownadorgny (25 Houses) 10.Keash (130 Houses) 11.Culfadda 11.Culfadda (162 Houses) 12.Corrick / Ballinafad (86 Houses)

BALLINTRILLICK BALLINTRILLICK

Construction process Once the contractor was appointed,they ware allowed a specific period to prepare the design.This design was then submitted to the clients rep. for consideration and approval. (CONSTRUCTION DOCUMENT REVIEW) Once the contractor was appointed,they ware allowed a specific period to prepare the design.This design was then submitted to the clients rep. for consideration and approval. (CONSTRUCTION DOCUMENT REVIEW) Drawings were made available for part 8 planning to co. co. Drawings were made available for part 8 planning to co. co. Once the process of design was agreed,drawings were issued to the project engineer for recording and comment as work progressed. Once the process of design was agreed,drawings were issued to the project engineer for recording and comment as work progressed.

PROGRESS DESIGN COMMENCED IN NOVEMBER 2004 DESIGN COMMENCED IN NOVEMBER 2004 PART 8 PLANNING PART 8 PLANNING CONTRACT SIGNED ON APRIL CONTRACT SIGNED ON APRIL PROJECT PROGRAMME PROJECT PROGRAMME PAYMENT PROFILE SUBMITTED PAYMENT PROFILE SUBMITTED CIVIL CONSTRUCTION COMMENCED IN AUGUST 2005 CIVIL CONSTRUCTION COMMENCED IN AUGUST 2005 MECHANICAL CONSTRUCTION BEGAN IN DECEMBER2005 MECHANICAL CONSTRUCTION BEGAN IN DECEMBER2005 PROCESS PROVING MAY/JUNE 2006 PROCESS PROVING MAY/JUNE 2006

BENBULBIN T.PLANT

Replacement of existing reservoir at Ballintrillick GWS N. Sligo

Newly replaced reservoir and treatment plant Ballintrillick GWS N. Sligo

Design demand Design year = Design year = Design period = 20years. Design period = 20years. Per Capita Consumption (PCC) = 180 litres per person per day consistent with the Per Capita Consumption (PCC) = 180 litres per person per day consistent with the Department of Environment and Local Government guideline figures for GWSs Department of Environment and Local Government guideline figures for GWSs Agricultural Demand = 814 litres per connection, based upon W.S Atkins National Agricultural Demand = 814 litres per connection, based upon W.S Atkins National Water Study Report, Water Study Report, Other connections = 1000 litres per connection assumed. Other connections = 1000 litres per connection assumed.

PRESSURE VESSEL AND INSTRUMENT PANEL

BENBULBIN

Project management-construction Project inception Project Review Design and Planning Procurement Development Delivery Project Management Contract Management

ESB JOB TRACKER FOR SLIGO COUNTY COUNCIL WATER SCHEMES 2005/06 Job IDLocationContractorPaymentMICStageComments Cert in BallintrillickYes€26, ConnectedCompleted 11/01/06Yes KeelogyboyYes€46,98925DesigningDesign to be handed to Contractor ws 23/01 for build FebruaryNo BenbulbenYes€7,51925ConstructionLine outages in progress ws 23/01 for completion end Jan 06.power team on siteNo CastletownYes€15,29615ConstructionAs per Benbulben above power team to mobilize next weekNo Drum EastYes€6,30225ConstructionAs per Benbulben & Castletown {ducting S Campbell}No BeltraNo€3,53625ConstructionAlteration and Linework Done 8/12/05 can be connected when cert in.No CorrickYes€8,48015ConstructionContractor finished linework 23rd Dec. Can be connected when cert in.No KeashNo€19,47015DesigningDuchas approval rec'd with conditions (Area of Conservation). Line isNo now being designed on site with Duchas representative input & to minimise risk of damage ESB Crews will do construction rather than Contractors. Probably construct in March subject to agreements KeashNo€4,11020DesigningAs per above (Shared line) esb to meet Duchas again this week on siteNo

E.S.B. crews at work at Castletown GWS,Benbulbin N.Sligo

CASTLETOWN

BELTRA

BELTRA

Castlebaldwin intake CASTLEBALWIN INTAKE

CASTLEBALWIN INTAKE ON LOUGH ARROW

ADSORPTION CLARIFIER ADSORPTION CLARIFIER

CORRICK BEFORE CONSTRUCTION

CORRICK TREATMENT WORKS OVERLOOKING LOUGH ARROW

KEASH

KEASH, BRICKLIEVE

Projects construction management Water Services,Sligo co.co. Personnel: 1no.Project Engineer, 2no. SRE, 2no. SRE, 2no.RE, 2no.RE, 2no. A/RE, 2no. A/RE, 1no G1 technician 1no G1 technician Working closely with the employers representative and main line staff to help deliver projects.

Employers requirements To Provide for the Construction of a new Water Treatment Works in Accordance with the EU (Drinking Water) Regulations, 2000 S.I. No439 To Provide for the Construction of a new Water Treatment Works in Accordance with the EU (Drinking Water) Regulations, 2000 S.I. No439 To ensure compliance with the maximum admissible concentrations (MAC) for colour, manganese and iron and to eliminate the threat from concentrations of trihalomethanes (THMs) To ensure compliance with the maximum admissible concentrations (MAC) for colour, manganese and iron and to eliminate the threat from concentrations of trihalomethanes (THMs)

Table 3.3.4:- Estimated Unaccounted For Water (UFW) GWS Theor. Domestic Theor. Agric. Theor. Other 2005 Total Theor. Demands 2005 Existing Consumption Estimated 2005 UFW Esti m a t e d UF W Unit m 3 /day % Geevagh/High , Keash Culfadda Corrick Castlebaldwin Doongeela

SUMMARY OF DUTIES circularlL7/ To supervise the construction, completion and maintenance of the contract works on the scheme to ensure that they are executed fully in accordance with the Contract Documents. 1.1 To supervise the construction, completion and maintenance of the contract works on the scheme to ensure that they are executed fully in accordance with the Contract Documents. 1.2 To ensure that all materials used in the works are in accordance with the Specification. 1.2 To ensure that all materials used in the works are in accordance with the Specification. 1.3 To execute or supervise tests carried out on site and to inspect materials and manufacture at source other than that which may be carried out by the Consulting Engineer's Head Office Staff. 1.3 To execute or supervise tests carried out on site and to inspect materials and manufacture at source other than that which may be carried out by the Consulting Engineer's Head Office Staff.

Duties continued. To record and check the progress of the work against the programme including regular monthly updating of the programme and of the cash flow statements. To record and check the progress of the work against the programme including regular monthly updating of the programme and of the cash flow statements. To keep a comprehensive diary constituting a detailed history of the work of construction and of significant happenings at the site and submit regular progress reports to the Consulting Engineer. To keep a comprehensive diary constituting a detailed history of the work of construction and of significant happenings at the site and submit regular progress reports to the Consulting Engineer. To record with particular detail information relating to delays, adverse physical conditions, disputes with landowners, and all Contractor's plant and labour and all Sub-Contractors' plant and labour. To record with particular detail information relating to delays, adverse physical conditions, disputes with landowners, and all Contractor's plant and labour and all Sub-Contractors' plant and labour.

To measure in agreement with the Contractor's staff on a monthly basis. To measure in agreement with the Contractor's staff on a monthly basis. To check all interim valuations and submit report to employers representative with recommendation. To check all interim valuations and submit report to employers representative with recommendation. attend regular measurement meetings with Consulting Engineer where any difficulties with interim measurement are to be discussed. attend regular measurement meetings with Consulting Engineer where any difficulties with interim measurement are to be discussed. examine in detail any claims submitted by the Contractor and to make written reports on same. examine in detail any claims submitted by the Contractor and to make written reports on same. Ensure compliance with Safety, Health and Welfare at Work. Ensure compliance with Safety, Health and Welfare at Work. for regular photographic records of the progress of the works for regular photographic records of the progress of the works

To carry out inspections at regular intervals to ensure that the Contractors are meeting their obligations with regard to the payment of P.A. Y.E., P.R.S.I., and Pension Fund/Sick Pay Contributions on behalf of their employees. To carry out inspections at regular intervals to ensure that the Contractors are meeting their obligations with regard to the payment of P.A. Y.E., P.R.S.I., and Pension Fund/Sick Pay Contributions on behalf of their employees. Surveillance of testing and commissioning during process proving period. Surveillance of testing and commissioning during process proving period. To assist in the preparation of all Final Accounts To assist in the preparation of all Final Accounts Assist with reporting on the PMS Assist with reporting on the PMS

Benbulbin GWS new reservoir and treatment plant, N. Sligo

KEELOGOBOY

DRUM EAST

ADSORPTION CLARIFIER ADSORPTION CLARIFIER