0000000000000000 No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs.194.54 croresWorks under.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

CONSULTING ENGINEERS LIMITED PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERAGE SYSTEM OF DISTRICT- I FOR KANPUR CITY UNDER.
Presented by: Ronald O. Nichols LADWP General Manager
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
CONTRACTOR OUTREACH PROGRAM September 25, Disaster Recovery Program  $5.08 Billion HUD Funds to Mississippi in form of Community Development Block.
1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International.
Pulivendula 1.  construction area of 1.32 Lakhs Sq.ft comprising Laboratory Animal House, Community center, Shopping Complex, Primary School, Auditorium,
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Mid Day Meal Scheme PAB-MDM Meeting – Manipur Ministry of HRD Government of India.
2006 Technical Affairs Water Projects Department.
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
Pumps applications water Water intake Water treatment Water distribution Wastewater operations In irrigation concrete pumping discharging oil pumpingdischarging.
Mysore City Corporation Mysore JnNURM. Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW 15 th January 2009 Projects State : Karnataka.
TADIPUDI LIFT IRRIGATION SCHEME
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore.
Projectsunder JnNURM Scheme Construction of traffic transit management centres Procurement of buses.
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
GANGA ACTION PLAN Union Government Scientific Departments 5A of 2000.
Project No 2005/LV/16/C/PE/003 Development of water services in Riga, stage III This project helps to reduce economical and social disparities among the.
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
The scheme for Modernization of State Police Forces (MPF), a non-plan scheme of Government of India (MHA), towards capacity building of State Police Forces,
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
GREATER VISAKHAPATNAM MUNICIPAL CORPORATION
ICDS Systems Strengthening & Nutrition Improvement Project (ISSNIP) (Credit No IN) Joint DEA-World Bank Tripartite Portfolio Review Meeting (TPRM)
On 20 th & 21 st Nov, 2015 at Hyderabad SLNA, KERALA.
ISPA Measure 2002 BG 16 P PE 016 Varna Integrated Water Project Transformationof Transformation of WWTP Asparuhovo Reconstruction of WWTP Varna ReconstructionofWS&
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
National Food Security Mission Uttar Pradesh. 4.a Review of Implementation of Kharif-2011, NFSM Programme. CropLast Year Target Target 2011 Likely Achievement.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
Review: Implementation of Smart Cities Mission
# of Human resources appointed
SPMU Details Sl. No. Post under NHP Name Designation 1.
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Nunavut Water Board Public Hearing
Hyderabad city water supply system
Review : Implementation of Smart Cities Mission
An-Najah National University Faculty Of Engineering
January 2016 December 2017 July 2015 June October 2014 Commencement of first contracts and site construction December 2017 Grand openning.
City:- Corporation of City of Panaji
Review of CADWM Projects Under PMKSY
Presentation transcript:

No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under progress. b.Augmentation of WSS with Kabini river source Rs croresFinal approval accorded by GOI. DTS under preparation. Acquiring of land in progress. IIProjects submitted for approval. aDPR of comprehensive Sewer Network for uncovered – missing links in Mysore city. Rs croresProposal submitted to GOI. STATUS OF WORKS UNDER JnNURM PROJECTS FOR MYSORE CITY

Progress of works under Remodeling of Water supply distribution network to Mysore city under JNNURM (Est Cost Rs crores) Sl. No Name of Package Est. Cost (in Crores) ComponentsStatus 1Package tender - Feeder mains, OHTs, pumphouse & sumps 65.56MS mtrs DI mtrs Over Head Tanks - 25 Nos. Clear water sump - 4 Nos. Construction of pumping station - 8 Nos. Work is awarded to M/s. NCC, Hyderabad on (Contract period - 24months) * Out of Km M.S pipes, Km pipes procured, 15.5 Km laid. *DI pipes Km (total qty), Valves & specials procured. Laying of Km DI pipeline completed. * Out of 25 tanks 24 OHT's works are under progress at different stages. Work of one OHT will commence by 15/01/09

15LL, 18 M Staging MDT & CSR Premises 10LL, 15 M Staging Bogadi (Sharadadevi Nagara) 10LL, 18 M Staging MDT & Devanoor Premises 15LL, 15 M Staging Siddhartha Nagara

610, 508 mm dia MS CSR Zone 508 mm dia MS Kvp Zone 610 mm dia MS CSR Zone 1118 mm dia MS Trunk Main from GP to Ballal Circle

Trenching for 559 mm dia MS CSR Zone 1118 mm dia MS Trunk Line from GP to Ballal. Trenching for 350 mm dia DI CSR Zone Concreting for Raft of Gayathripuram.

Hydro test of 1118mm dia M.S Pipes Stacking of Mortar Lined M.S Pipes

Curing Pond of Lined M.S Pipes External Guniting of M.S Pipes

406mm dia MS pipeline Hyd CSR Zone 508 mm dia MS pipeline UT GPZone Field Tests

Sl. No Name of Package Est. Cost (in Crores) ComponentsStatus 2SCADA and communi cation system. 6.43Head Works at Melapura, WTP at Rammanahalli, Pump house at Hongalli & IPS near Vikranth tyres and all MBRs Process of procurement is in progress & will be completed by June 2009

Telemetry Tower at Master Control Station at VVWW Premises

Sl. No Name of Package Est. Cost (in Crores) ComponentsStatus 24x7 distribution system in different Zones. 3West Zone86.99CSR, Kuvempunagar zones & part of HLR zone MS mtrs DI - 29,903 mtrs. HDPE – 4,92,753 Mtrs. HSC - 63,435 Tripartiate Agreement signed on The agency is in the process of mobilization 4East Zone74.90German Press, Devanoor, Ballal circle Zones & part of HLR zone MS mtrs DI mtrs. HDPE – 4,08,412 Mtrs. HSC - 66,565 Tripartiate Agreement signed on The agency is in the process of mobilization

Sl. No Name of Package Est. Cost (in Crores) ComponentsStatus 5Electrical Works 1.32Express Feeder Line - All pumping stations Power sanction obtained for Devnoor, German Press. Other stations correspondence is under progress. This work will be taken up only after 75% civil works are completed.

Funds Utilization for the project upto the end of Approval from GoI: Approval from GoK: Events of Funds released: Amount in Rs. lakhs Sl noSourcesCommitment based on approved project cost (Rs. in Lakhs) DateActual released Balance 1GOI GOK M.C.C Total Tender Package No. Actual amount utilized in the project Upto end of last month (December 2008) During the current month being reported ( ) Total to date (2+3) (1)(2)(3)(4)