Activities proposed for procurement (EGEP-1st Batch ) 1.RIMS V3 Prototype Development 2.Galileo 2G Phase A/B Satellite Studies 3.Electrical Propulsion.

Slides:



Advertisements
Similar presentations
- 1 - EPP-ED Public Hearing : 12 June 2008 The importance of GNSS (Galileo/EGNOS) Views from the forthcoming Council Presidency By Raymond ROSSO French.
Advertisements

GALILEO and EGNOS Fotis Karamitsos, European Commission
Technology Module: Technology Readiness Levels (TRLs) Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Satellite Communication
European GNSS Evolution Programme
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
EQUIPMENT VALIDATION.
1 Conference Call December 7 th h 30 Agenda 1.Concerns on wording and inclusion of glossary of terms; 2.Issues: 3.Scope of RFP equipment required;
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
GALILEO INTERIM SUPPORT STRUCTURE EUROPEAN COMMISSION International Civil Aviation Organization GALILEO CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9.
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
Project planning Lecture 1 6/10/20151Dr. Joshua Onono.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
Greg Baker © Part One The Foundations – A Model for TQM Chapter # 3 Design for quality.
VENUS (Vegetation and Environment New µ-Spacecraft) A demonstration space mission dedicated to land surface environment (Vegetation and Environment New.
Fundamentals of Information Systems, Second Edition
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
1 08 January 2015 Stephen Horan Cube Quest Kick-off: Communications Rules PI for Avionics Space Technology Mission Directorate.
Development Processes and Product Planning
The Double Diamond Design Process. Establish Project parameters; aims & objectives of project Recommendation of Client Confidentiality Agreement or Non-Disclosure.
→ Potential ESA- Roscosmos Cooperation in Education Activities.
Audit of Public Procurement
Petter Nielsen Information Systems/IFI/UiO 1 Software Prototyping.
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on finances Partner Search Forum Poznań, Poland 16 – 17 December 2008.
GLONASS Government Policy, Status and Modernization
Main Achievements in Public Procurement in Ministry of Finance of the Republic of Moldova Public Procurement Agency Batumi, 2015.
GLOBAL FOREST OBSERVATIONS INITIATIVE (GFOI) Per Erik Skrøvseth, CEOS-Plenary, Lucca, Italy.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
Research plan – LSRT Consortium. Targets Correctness approval Vs. Sybase database. Implementation of a validation scenario with TTI database. Demo preparations.
This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Implementation of EU Electronic Communication Directives.
Fundamentals of Project Management A complete flow.
Management & Development of Complex Projects Course Code MS Project Management Project Life Cycle & PM Process Groups Lecture # 4.
1 WP4 – System Testbed Trial 2 preparation Barcelona 3/03/05 Marco Bobbio Pallavicini - Carlo Gavazzi Space SpA.
1 Galileo Research and Development Activities GALILEO GALILEO 6 th Framework Programme Aeronautics & Space November 2003.
Governance and Financial Management Alyson Gerner.
Formulating a Simulation Project Proposal Chapter3.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
2 nd Design Update Presentation March 17, Overview Ground Segment Space Segment OBCTNCTransceiverAntenna PCTNCTransceiverAntenna Rx Tx Rx Tx Rx.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Rome, November 28 th 2003 Giancarlo Del Bufalo – Head of dept. for General Administration Ministry of Economy and Finance EU Public Procurement Learning.
System of science financing in Poland address: ul. Hoża 20 \ ul. Wspólna 1/3 \ Warszawa \ phone: +48 (22) \ fax: +48 (22) Data:
Designing a Communications System for Eagle Lisa Ferguson Dr. Gary Yale, Dr. Ed Post Arizona Statewide Symposium Announcements April 12, 2014.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
04/2007 THE EUROPEAN ENVIRONMENT POLICY & ITS INSTRUMENTS OF IMPLEMENTATION Preparation & Draft of environmental projects THE EUROPEAN ENVIRONMENT POLICY.
1 Galileo / EGNOS Status GNSS Regional Plan Workshop July 12 th Casablanca Morocco Dr. Cedric Seynat Technical Department European GNSS Supervisory.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
MeTA Phase I: Where are we? MeTA18/06/ MeTA2 The MeTA Phase I Proposal Purpose To pilot a new multi-stakeholder approach towards increasing transparency.
Department of Computer Science Introduction to Information Security Chapter 8 ISO/IEC Semester 1.
CARPE DIEM 2 nd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
QUALITY LIFE IMPROVEMENT IN EUROPEAN URBAN AREAS THROUGH AN INNOVATIVE GREEN TRANSPORT SOLUTION.
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
Process engineering Quality controls.
Telemetry system The telemetry, tracking, and command (TT&C) subsystem performs several routine functions abroad a spacecraft. The telemetry or "telemetering"
Preparations for a Lehman Review
Planning for success is critical
Planning is a critical success factor
Systems Engineering Management
Impact of Quality Control and Quality Assurance in Project Management
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
Presentation transcript:

Activities proposed for procurement (EGEP-1st Batch ) 1.RIMS V3 Prototype Development 2.Galileo 2G Phase A/B Satellite Studies 3.Electrical Propulsion subsystem Industrialisation and Thruster operational characterisation 4. Inter Satellite Link (ISL) Pre-development

1.RIMS V3 Prototype Development This activity comprises the pre-development of the future EGNOS V3 Ranging and Monitoring Stations (RIMS), which are intended to enter into operational service as of 2020 and will be based on the preliminary specification for the Data Collection Segment (DCS) currently being prepared in the frame of the running EGNOS V3 Phase AX+B contracts. It is proposed to cover this objective through parallel contracts. This activity is budgeted with up to 9.0 M€ for up to two parallel contracts awarded further to a Competitive Tendering (Art 21.1.c of the Procurement Regulations).

2.Galileo 2G Phase A/B Satellite Studies This activity will define and preliminary design the 2nd generation of the Galileo satellites, that will have increased payload capabilities. The activity will be based on feasibility studies carried out internally by the Agency during and will introduce a non-direct injection launch policy considered mandatory to comply with the requirement for increased payload capabilities and to avoid at the same time to increase launch costs for the next generation of the Galileo satellites. This activity is budgeted with up to 16.0 M€, and it is proposed to implement it through up to three parallel contracts to be awarded further to a Competitive Tendering (Art 21.1.c of the Procurement Regulations) and with a phased approach allowing to review and refine the activity requirements after phase A.

3.Electrical Propulsion subsystem Industrialisation and Thruster operational characterisation This technology preparation activity will include manufacturing, assembly and test of an Engineering Model of an electrical propulsion thruster and a bread-board of its power supply. The aim is to consolidate the capability of the current Electric Propulsion (EP) subsystems manufactured in Europe for achieving the performance envelope imposed by the foreseen evolution in requirements for the Galileo mission. The definition of this activity has been coordinated with other EP-related activities of the Agency for the purpose of synergy and assuring complementarity. It is proposed to cover this objective through parallel contracts. This activity is budgeted with up to 3.6 M€ to be allocated further to a Competitive Tendering for a maximum amount of 1.2 M€ each according to Art b) of the Procurement Regulations.

4. Inter Satellite Link (ISL) Pre-development This activity will include definition, design, manufacturing, assembly and test of an ISL payload model, including transponder and antenna, that will be demonstrated on ground for the validation of critical key performance parameters of ISL communication and ranging. This activity is budgeted with up to 8.0 M€ for a contract awarded further to Competitive Tendering (Art 21.1.c of the Procurement Regulations).