River Avenue Pittsburgh, Pennsylvania Michael J. Carroll Mechanical Option Primary Advisor: Dr. Bahnfleth H.J. Heinz Distribution Center.

Slides:



Advertisements
Similar presentations
The Dalles Middle School
Advertisements

Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Heating, Ventilating, and Air-Conditioning (HVAC)
Department of Energy Energy Savers PowerPoint: Heating and Cooling 4 of 12.
Backgroun d Redesign Analysis Office Airside CUP Analysis CHP Analysis Power Distributio n Outline Constructio n Impact Conclusion Backgr ound Jim Gawthrop.
The Three Tiered Philosophy
Direct solar radiation is both a powerful environmental stress & renewable energy resource. The sun’s energy is most concentrated on the roof (spring through.
Greenhouse and Aquaculture Design considerations John W. Lund Geo-Heat Center Oregon Institute of Technology Klamath Falls, OR
An Affordable Energy Efficient Home Utilizing Solar and Wind Power and Solar Hot Water John Gardner, PE.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
 Our rules of working are : Different knowledgeTogether on the same boat Have fun.
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
North Pocono High School
Conservation and Environmental Design and Construction
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
The New RLPS Architects Office Building Lancaster, PA Brice Ohl – Mechanical Option Presented on 4/10/13.
SENIOR THESIS PRESENTATION
Heating Systems.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
Energy Conservation February 8, Steve Wilson, MBA, CEM, CDSM, BEP The Energy Guy.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Medical Office Building Kale Mullikin Mechanical Option Advisor: Donghyun Rim.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
ID 320 – LIGHTING\ACOUSTIC\HVAC Done by: Amjad AlFawaz
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Solar Energy Home Tour A preview to our local field trip.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Electrics. Solar Energy Solar water heater Efficient way to heat water at no cost all year long. Work by running copper pipes through a solar panel on.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
ENERGY SYSTEMS LABORATORY ABOVE CODE ENERGY ENHANCEMENT PROJECT for The City of Arlington ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station.
Architecture Supported by:
An Affordable Energy Efficient Home Utilizing Solar and Wind Power and Solar Hot Water
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
Greenhouse Structures, Covering Materials, and Climate Controls
David Anderson Mechanical Option
Studying Geothermal Heat Pump in Palestine
Redesigning of a Primary school
Grunenwald Science and Technology Building
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Graduation Project – 2 Mini-Mall
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Project Background Type of building: Mixed-use residential building
Project: 250 West Street, Columbus, Ohio
Objectives Finish Lighting system design Daylighting.
Presentation transcript:

River Avenue Pittsburgh, Pennsylvania Michael J. Carroll Mechanical Option Primary Advisor: Dr. Bahnfleth H.J. Heinz Distribution Center

Michael J. CarrollMechanical Option Presentation Outline  Building Synopsis  Client Concerns  Goals of Project  Mechanical Systems  Mechanical System Selection  Daylight Addition  Roof Framing Redesign  Conclusions  Questions

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Building Synopsis  Total 150,000 ft 2  140,000 ft 2 Warehouse  3 Offices, 2 Break Rooms, 2 Sets of Rest Rooms  Built 8/2000  11/2001  $14 million cost  Addition to Prior Warehouse  Adjacent to Allegheny River

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option H.J. Heinz Distribution Center

Michael J. CarrollMechanical Option H.J. Heinz Distribution Center

Michael J. CarrollMechanical Option H.J. Heinz Distribution Center

Michael J. CarrollMechanical Option Client Concerns  Open Floor Space  Storage for Canned Food  Temperate Climate  Freezing of Cans Near Intake Louvers

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Client Concerns Freezing Cans

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Goals of Project  Provide Economical and Efficient Working Environment  Supply Zonal Air Conditioning  Impart Daylight into Warehouse  Design Roof Framing for Daylighting Clerestories

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical Systems Existing Mechanical:  3 Duct Heaters  12 Intake Air Louvers  13 Exhaust Fans  Air-to-Air Packaged Heat Pumps

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical Systems Existing Cooling:

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical Systems Existing Heating:

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical Systems Proposed Mechanical:  Geothermal Heat Exchanger  Ground Water Heat Pump System  Surface Water Heat Pump System  Zonal Heating and Cooling Control

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Zonal Heat Pump Sizes and Quantities ZoneRoomsDesign LoadUnit SizeQuantity of Units Zone 1East Office Area1 Ton 1 Zone 2West Office Area2 Tons 1 Zone 3Conveyor Hallway20 Tons10 Tons2 Zone 4Warehouse336 Tons25 Tons14 Mechanical Systems Proposed Heat Pump Locations:

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical Systems Geothermal Exchanger Heat Pump:

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Geothermal Heat Pump Equipment Pricing UnitQuantityMaterialInstallationUnit TotalTotal 25 Ton Heat Pump14$14,500.00$6,425.00$20,925.00$292, Ton Heat Pump1$1,325.00$1,100.00$2, Ton Heat Pump1$1,925.00$1,350.00$3, Ton Heat Pump2$9,200.00$2,800.00$12,000.00$24, /4" Polyethylene HX Pipe (in Linear Feet) 39,219$0.61$2.03$2.64$103, " Copper H2O Pipe (in Linear Feet)1,875$2.37$4.03$6.40$12, /2" Fiberglass with Jacket Insulation (LF)1,875$1.04$1.94$2.98$5, $443, Mechanical Systems Geothermal Exchanger Heat Pump:

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical Systems Ground Water Heat Pump

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Ground Water Heat Pump Equipment Pricing UnitQuantityMaterialInstallationUnit TotalTotal 25 Ton Heat Pump14$14,500.00$6,425.00$20,925.00$292, Ton Heat Pump1$1,325.00$1,100.00$2, Ton Heat Pump1$1,925.00$1,350.00$3, Ton Heat Pump2$9,200.00$2,800.00$12,000.00$24, GPM Plate & Frame Heat Exchanger1$7,360.00$590.00$7, HP GPM End-Suction Pump (each)2$4,340.54$2,336.88$6,677.42$13, /2" Sch. 40 Steel Pipe (LF)360$5.05$9.60$14.65$5, " Copper H2O Pipe (in Linear Feet)1,875$2.37$4.03$6.40$12, /2" Fiberglass with Jacket Insulation (LF)1,875$1.04$1.94$2.98$5, $366, Mechanical Systems Ground Water Heat Pump

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical Systems Surface Water Heat Pump

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Surface Water Heat Pump Equipment Pricing UnitQuantityMaterialInstallationUnit TotalTotal 25 Ton Heat Pump14$14,500.00$6,425.00$20,925.00$292, Ton Heat Pump1$1,325.00$1,100.00$2, Ton Heat Pump1$1,925.00$1,350.00$3, Ton Heat Pump2$9,200.00$2, $12, $24, /4" Polyethylene HX Pipe (in Linear Feet)109,885$2.37$4.03$6.40$703, " Copper H2O Pipe (in Linear Feet)1,875$2.37$4.03$6.40$12, /2" Fiberglass with Jacket Insulation (LF)1,875$1.04$1.94$2.98$5, $1,043, Mechanical Systems Surface Water Heat Pump:

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical System Selection Which is the Best Heat Pump Solution???

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Mechanical System Selection Ground Water Heat Pump Advantages:  Less Drilling for Wells than Geothermal Piping  Less Piping required than Surface Water or Geothermal  $76,960 savings over Geothermal  $676,685 savings over Water Source

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Daylighting Existing Warehouse Lighting:  Watt Metal Halide Fixtures  Watt Fluorescent T8’s = Total 101,750 Watts Installed Warehouse Daylighting:  3 Sets of 3’ high windows length of Warehouse  Visible Transmittance of 0.50  Window-to-wall Ratio = 0.36

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Daylighting

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Daylighting Summer / Clear Sky Illuminance  275 Fc on Floor  130 Fc on Can Sides

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Daylighting Winter / Overcast Sky Illuminance  30 Fc on Floor  22 Fc on Can Sides

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Daylighting Luminaire F01 (metal halide) F02 (fluorescent) F10 (fluorescent) F01 (metal halide) F01 (metal halide) Luminaires Lumens = 36,0005,9509,20036,000 CU = RSDD =0.96 LLD = BF = LDD =0.82 LFF = Illuminance (fc) = Total Illuminance (fc) =

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Daylighting Summer Month Peak Savings:  64 kilowatts  $186 Winter Month Peak Savings:  25.6 kilowatts  $75

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Structural Redesign Existing Roof Structure:  Pre-fabricated Wide-Flange Steel Beams Redesigned Structural Members:  New Joist-Girders  3 sets of 3’ high windows required (= 2 clerestories)  10’ opening for clerestory for length of warehouse (737’)

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Structural Redesign Joist SizeLocation 24K7North and South Exterior Walls 32LH06Roof Framing Throughout (excluding Clerestories) 36LH13Roof Framing Supporting Clerestories 60G12N13.4K Joist Girder on Interior with No Clerestories 60G12N6.7K Joist Girder on West/East Exterior Walls with No Clerestories Modified 60G12N13.4K Joist Girder on Interior with Clerestories Modified 60G12N6.7K Joist Girder on West/East Exterior with Clerestories

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Structural Redesign Modified Joist Girders

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Conclusions  Ground Water Heat Pumps are Economical for the Pittsburgh Environment  Heating and Cooling provided in all spaces  Daylight reduces Power Demand, and Provide Natural Sunlight  Joist Girders supply needed strength and span Warehouse requires

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Accolades The AE Department  Dr. William Bahnfleth  Dr. Jim Freihaut  Moses Ling  M. Kevin Parfit  Jonathan Dougherty LLI Technologies  James White, PE  Marjorie Conrad  Chuck Boyle Mosities Construction  Tom Edwards Star Electric  Bob Kalan AE Colleagues

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option ? Questions

H.J. Heinz Distribution CenterMichael J. CarrollMechanical Option Thank You!