Newark Desalination Facility

Slides:



Advertisements
Similar presentations
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION – WATER RESOURCES May 19, 2005.
Advertisements

Zone 7 Water Agency Zone 7’s Salt Management Plan Past, Present & Future May 9, 2012 Kurt Arends, P.E. AGM Engineering and Operations Zone 7 Water Agency.
Borrego Valley Borrego Valley Integrated Regional Water Management Planning Integrated Regional Water Management Planning.
State of California Lahontan Water Quality Control Board Update on Salt & Nutrient Management Plans.
East San Gabriel valley watershed Group Watershed Management Program (WMP) Development Cities of claremont, La Verne, pomona, and san dimas.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
TMDL Implementation in the Calleguas Creek Watershed Ashli Desai Larry Walker Associates.
Capacitive Deionization for the Removal of Total Dissolved Solids from Waste Waters: High Water Recoveries Coupled with High Ion Removal Efficiency Gene.
Exploring Regional Desalination as a Water Supply Option in the Bay Area The Who, What, When, Where, Why and How of Regional Water Supply Planning May.
Kipp Scott, East Cherry Creek Valley Water and Sanitation District Doug Brown, P.E. CDM Navigating the Regulatory and Permitting Hurdles for Concentrate.
Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012.
Creating a Sustainability Index for Water Planning in Southern California Presented at: AWWA ACE-09 June 18, 2009 Dan Rodrigo Vice President CDM 523 West.
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project.
2 1)Familiarize State agency staff with Water Plan Update 2013 information, tools and resources 2)Identify opportunities for State agencies to derive.
American Society of Farm Managers & Rural Appraisers Kevin Morrison, P.G. Project Coordinator – Desalination Engineering Brackish Groundwater Desalination.
1 South Orange Coastal Ocean Desalination (SOCOD) Project, Ocean Desalination Costs and Recent Public Opinions November 2011 Status Update Karl Seckel,
1 Regional Report San Joaquin River Hydrologic Region.
WQBELs Karen Holligan May 6, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Freshwater Aquatic Organisms and Habitat ( ) Rick Palmer Senior Fisheries Biologist Sharleen Hamm Aquatic Ecologist.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Name of presenter Date of presentation.  To help preserve and protect Wisconsin’s over 15,000 lakes and 86,000 miles of rivers.
Jericho Aquatic Discharge Assessment Presented by: Bruce Ott, Senior Environmental Scientist, AMEC Earth & Environmental.
Lay-out of Proposed Scheme. Positives – Well located for integration into both NMBM Potable and Industrial supply infrastructure Can supplement either.
Water for Monterey County Regional Project Capital and O&M Cost Description 1 Lyndel Melton, P.E. RMC Water and Environment.
Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation A cooperative effort between: Trout Unlimited, Jackson Hole Chapter.
EPA REGION VI MINIMUM QUANTIFICATION LEVELS (MQLs) WHAT THE “L” IS GOING ON? 25 th EPA Annual Pretreatment Workshop Addison, TX 8/5/09 Allen Gilliam ADEQ.
Evaluation of Non-Traditional Sources of Cooling Water Sujoy Roy and Michael DiFilippo Tetra Tech Inc, Lafayette, CA and MND Consulting, Berkeley, CA EPRI.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
Eric Bergh Manager of Resources October 28 th, 2009 Climate Change and Water Supply An Urban Water Agency’s Perspective.
Figure 1. Location of the Palo Alto sampling station in South San Francisco Bay.
Decommissioned BCR Organic Media Characterization Standard Mine Superfund Site, Crested Butte, CO Neal Gallagher, Eric Blumenstein, Tom Rutkowski, John.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
The New Maximum Benefit Paradigm. Common Issues with Other Basins and Other RWQCBs TDS, N and other water quality constituent objectives are common impediments.
Western Delta Diversion Gary W. Darling Delta Stewardship Council September 22, 2011 Delta Diablo Sanitation District.
Produced Water Treatment For Recycle 22 nd IPEC – Denver, CO Dan Mueller, P.E.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February.
MSSC 2011 Annual Salinity Summit February 17 – 18, 2011 Thirty Years of Success in Implementing Desalination By Roger K. Noack, P.E. HDR Engineering, Inc.
Slide 1 Drinking Water Subcommittee Greg Gartrell, Chair CALFED Bay-Delta Public Advisory Committee SWRCB Periodic Review Presentation January 2005.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Connie Brower NC DENR Division of Water Resources.
WQBELs Karen Holligan September 23, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
Silicon Valley Advanced Water Purification Center And Future of Purified Water Use Tour Guides: Miguel Silva Tour Coordinators: Amy Fry, Michelle Pelayo-Osorio.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
1 How the Water Board Protects California’s Water Quality Kate Hart, Board Member Chair Central Valley Regional Water Quality Control Board.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
CHANNEL ISLANDS BEACH COMMUNITY SERVICES DISTRICT
Water Resource Management Planning Update
Highlights of the New NPDES Permit
Laura Hidas Alameda County Water District
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Water Resource Management Planning Update
Brackish Water Desalination Project
October 29, 2018 Terry Lauritsen, P.E.
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
California Water Commission
Presentation transcript:

Newark Desalination Facility

ACWD Service Area Union City South Bay Aqueduct (DWR) Fremont Newark HWY 92 C Well Fields Union City CREEK HAYWARD FAULT DRY Hetch-Hetchy (SFPUC) ALAMEDA South Bay Aqueduct (DWR) San Francisco Bay CREEK COYOTE I-680 HILLS Alameda County Water District currently utilize 3 sources of supply 1. ACWD purchases water from the Department of Water Resources. Water is conveyed via the South Bay Aqueduct, shown here in GREEN. South Bay Aqueduct Water is treated at two water treatment plants shown here in PURPLE. 2. ACWD is a suburban customer of San Francisco Public Utilities Commission Water is conveyed via the Hetch-Hetchy system, shown here in RED. The remaining supply consists of local groundwater. This water is pumped from two wellfields shown here in BLACK. In summary, the District imports approx. 55% of its supply from DWR, 30% from Hetch Hetchy and 15% from local runoff. Fremont HWY 84 I-880 Water Treatment Plants San Jose San Francisco Oakland Walnut Creek San Francisco Bay Location Map Fremont Newark miles 0.5 1

ACWD Water Supply Planning ACWD Integrated Resources Planning Study (1995) identified key issues for ACWD: Dry year water supply reliability System production capacity Water quality (hardness)

IRP Recommended Strategy and Implementation Status Item Status Water Conservation All cost-effective BMPs are being implemented Off-site Water Storage 150,000 AF of groundwater banking secured at Semitropic (1996, 2001) Enhanced Local Conjunctive Use Quarry Lakes recharge pits rehabilitation completed (1996) Recycled Water Joint ACWD/Union Sanitary District feasibility studies completed Brackish GW Desalination Phase 1 (5 MGD) facility in operation (2003)

Niles Cone Groundwater Basin and Aquifer Reclamation Program

Niles Cone Groundwater Basin

Brackish Groundwater Desalination Concept

Brackish Groundwater Desalination Benefits Water Supply New source of supply Firm source of supply Water Production Provides new source of production to distribution system Water Quality High quality water Helps meet district’s hardness goals Reliability of Local Control Provides water source west of Hayward Fault Does not rely on outside sources

1998 - Pilot Tests Performed Findings ARP water has low membrane fouling potential & requires minimal pretreatment Low pressure membranes performed well and will meet WQ Objectives RO Concentrate met NPDES discharge requirements

DESALINATION FACILITY 2001 – Designs Finalized ACWD Service Area HWY 92 C Union City CREEK HAYWARD FAULT DRY San Francisco Bay ALAMEDA DARVON WELLFIELD CEDAR WELLFIELD CREEK COYOTE Fremont I-680 HILLS Desal Facility $12.2 M HWY 84 I-880 Well Upgrades $ 1.3 M DESALINATION FACILITY Newark Supply and Discharge Pipelines $ 6.7 M Total : $20.2 M miles 0.5 1

Concentrate Discharge Final Discharge Location Flood control channel discharges to San Francisco Bay (approximately 2500 ft from Desal, 20,000 ft from San Francisco Bay) Discharge Monitoring is conducted regularly to ensure that the concentrate stream is not negatively impacting the environment SHOW MAP OF WHERE PLUMMER CREEK IS.. FOR A SENSE OF HOW FAR AWAY FROM THE BAY IT IS BEING DISCHARGED

Projected Annual Operating Cost: $ 241/Ac-Ft LABEL CHART WITH CATEGORY NAME

Summary – What Have We Learned? Desalination provides ACWD cost-effective local supply Improved water quality Public acceptance – favorably received Cost comparable with other supplies Most challenging aspects included: Discharge permit Construction in an urbanized area Future challenges include: Regulatory changes regarding discharge Future energy costs uncertain

End of Presentation

NPDES Permit Requirements for Desal Conduct Self-Monitoring Program: On a monthly basis: Perform Acute Toxicity Testing on Concentrate– static renewal bioassay using 2 test species: three-spine stickleback and either rainbow trout or fathead minnow. Sample Concentrate for - Total Dissolved Solids, Dissolved Oxygen, Chlorides, Conductivity, pH, Temperature, Salinity and Total Metals (i.e., Arsenic, Cadmium, Chromium, Copper, Lead, Magnesium, Mercury, Nickel, Selenium, Silver and Zinc).

Flood Control Channel Discharge Issues Concentrate Water Quality Salinity Trace Metal Concentrations Habitat Impacts Sensitive Species Vegetation Permit Acquisition Regional Water Quality Control Board NPDES Permit to Discharge Calif Dept of Fish & Game Streambed Alteration Permit to Construct Outfall

Permit Acquisition Approach Identify Major Stakeholders and their concerns California Regional Water Control Board (RWQCB) United States Fish and Wildlife Services (USFWS) California Department of Fish and Game (CDF) Conduct feasibility & technical studies (i.e., pilot work & water quality analysis) Conduct vegetative biotic surveys to confirm habitat species

Projected Concentrate Discharge Water Quality Specific Constituents of Concern RWQCB Fresh Water Quality Objectives (ug/L)2 Projected Concentrate Discharge (ug/L) Selenium 5 2.8 – 4.6 Copper 38.7 19.9 – 32.8 Chromium VI 11 ND1 Nickel 509 3.3 – 5.5 Zinc 343 24.2 – 40.1 1 Non Detect (Chromium VI is not naturally occurring and typically present when total chromium values are elevated. Projected total chromium = 14.9 -24.6 ug/l) 2 Calculated values assuming a hardness = 400 mg/l

Water Quality Objectives RO Permeate (Potable) Water Quality TDS <100 mg/l Hardness < 10 mg/l Finished Water Quality Hardness <150 mg/l Non-corrosive Good Tasting Water Concentrate Water Quality pH 6-9 Non-toxic Meet NPDES Permit Requirements

Future Related Projects Wellfield Treatment Facility Purpose: Demineralize well water and reblend w/ well and SFPUC Water Impact: Lower hardness, improve protection and operating flexibility Date: 2006 Newark Desal Facility Expansion Purpose: Additional production; blended with well water Impact: Lower, more uniform hardness, increase reliability Date: 2009 CUT – INSERT CONCENTRATE DISPOSAL ALTERNATIVES PRESENTATION HERE ..FORMAT TO LOOK LIKE THIS PRESENTATION!