NASUCA Baltimore Meeting November 11-14, 2012 Mark Schuling, Iowa Consumer Advocate.

Slides:



Advertisements
Similar presentations
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Advertisements

Tariff. The rate at which electrical energy is supplied to a consumer The rate at which electrical energy is supplied to a consumer Therefore tariff naturally.
Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
Infrastructure Replacement Programs Cheryl Norton President Kentucky American Water Lexington, Kentucky.
Rate Setting in New York Case Study: Con Edison Electric Rate Proceeding Thomas Dvorsky Director, Office of Electric, Gas and Water New York State Public.
Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
Pipeline Replacement Programs Presentation By Frank Radigan Hudson River Energy Group June 26, 2012.
MOSS ADAMS LLP | 1 Tribal Telecom 2013 Federal Telecommunications Regulatory Updates.
Hawaii Clean Energy Incentive Based Regulation Western Clean Energy Advocates Remarks of Ron Binz San Francisco, CA January 8, 2015.
Breaking Down Barriers to Energy Efficiency Utility Revenue Decoupling and other Revenue Stabilization Tools Jim Lazar, RAP Senior Advisor Presented to:
Let’s Talk Energy Savings: The City of Norwalk partners with Conservation & Load Management (C&LM) Mayor Alex Knopp November 18, 2004.
Revenue Decoupling: A proposed solution to the utilities’ traditional incentive to encourage wasteful energy use Christopher Grubb
Non-Utility Costs in Utility Bills M. Sarafolean J. Kaman Iowa Industrial Energy Group Meeting April 9, 2013.
Chapter 1 Infrastructure Management System. Managers and engineers need clear guidelines for life- cycle management of infrastructure systems for water,
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Incentive Regulation Topics Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
NASUCA 2015 MID-YEAR MEETING The Utility Push To Increase Customer Charge: What’s Wrong With It and How To Respond To It. Glenn A. Watkins, CRRA Senior.
File & Suspend Rate Cases Water & Wastewater Reference Manual1.
1 THE RATE CASE PROCESS A Blend of Science and Superstition Presentation to the Mongolian Energy Regulatory Board By Burl Haar Executive Secretary Minnesota.
Innovative Methods to Extend Service to New Natural Gas Customers NASUCA 2015 – Philadelphia, PA David C. Weaver Vice President, Regulatory Affairs.
Working together. Achieving results. CPUC Recycled Water OIR (R ) Workshop 3: Recycled Water Costs/Rates Water IOU Panel General Principles January.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Economic Development Dan Murphy, Commercial Customer Meeting.
Methods of Regulation Rate of return Incentive systems –Rate freeze –Rate bands or ranges –Price Caps.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Limited Proceedings Water & Wastewater Reference Manual1.
Realigning Utility Incentives Commissioner Wayne E. Gardner Pennsylvania Public Utility Commission Keystone Energy Efficiency Alliance Sept. 20, 2011.
The Utility Push to Increase Customer Charge: What’s Wrong With It and How to Respond to It NASUCA Midyear Meeting Philadelphia, PA June 7-9, 2015 Kira.
EDUCATION NEEDS TO BE VIEWED AS AN INVESTMENT NOT AN EXPENSE.
Public Water and Sewer Affordability Meg Neafsey American Water April 30, 2015.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
R OCKY M OUNTAIN P OWER C OMPANY DSM OPT-OUT PROPOSAL Utah Industrial Energy Consumers (UIEC) November 3, 2009.
The strategy for improved electricity distribution maintenance 9 June 2008.
Overview of a Water Action Plan: California Public Utilities Commission Paul G. Townsley, President Arizona American Water January 18, 2011.
Presentation to WIEG August 7, 2008 Energy Efficiency Carol Stemrich Assistant Administrator Gas and Energy Division.
NARUC SUMMER COMMITTEE MEETINGS Committee on Water Agenda California Regulatory Initiatives Case History – California American Water B. Kent Turner – President.
Smart Bet? Illinois Courts and Smart Meters Orijit Ghoshal Energy Law 2010.
CALIFORNIA PUBLIC UTILITIES COMMISSION BALANCED RATES RULEMAKING R California Water Association’s Restatement of Goals and Objectives for the.
Who Pays for Safety? Who Should? November 19, 2015.
Paula M. Carmody People’s Counsel Maryland Office of People’s Counsel.
Payment amounts for prescribed assets Presentation to Ontario Energy Board September 15, 2006.
Conservation Cal Water’s Approach with the California Public Utilities Commission Darin Duncan, Bear Gulch District Manager Low-Income Oversight Board.
Natural Gas Utility Distribution Pipeline Infrastructure Replacement Programs R ATE R ECOVERY I SSUES NASUCA Mid-Year Meeting Charlestown, South Carolina.
June 15, 2009 Pipeline Safety & Efficiency. Pipeline Safety & Efficiency Our aging infrastructure not only poses significant safety hazards, but can impact.
Arizona Water Issues Arizona Water Issues Setting Rates for Regulated Water Utilities Nancy Scott Utilities Division ARIZONA CORPORATION COMMISSION June.
1 Indiana Utility Regulatory Commission Report of the Indiana Utility Regulatory Commission to the Water Resources Study Committee of the Indiana General.
Canadian Electricity Association Post CAMPUT Workshop Performance Based Regulation in Alberta.
Staff Assistance In Alternate Rate Setting Water & Wastewater Reference Manual1.
1 RORB Return on Rate Base. Legal Basis  Section 43, (f) of Republic Act No Section 43. Functions of the ERC – x x x (a) x x x (f) x x x “The rates.
Uses of Rate of Return Method For regulatory commissions –At the state level, used as the basis for rate cases: carriers’ requests for a rate increase.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Energy Regulatory Authority (ERA) of Mongolia Mr.Tumentsogt Tsevegmid, MSc, MPA Regulator, Energy Regulatory Authority University Street 2A, Ulaanbaatar.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
May 9 th, 2016 California Public Utilities Commission Power Charge Indifference Adjustment (PCIA) Workshop.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
2017 Mid Year Meeting Denver, CO
New Reporting Annual ETC Reporting One-time items
Quality Framework Proposal
REVISED UNIFORM REPORTORIAL REQUIREMENT (URR)
Natural Gas Infrastructure Improvements
Roger Colton Presented to: NASUCA Annual Meeting November 2017
2016 National Conference of Regulatory Attorneys
Regulatory Accounting Issues for Replacing Lead Water Pipes
Retail Rate Design & Administration
The New Mexico Rural Universal Service Fund
Presentation transcript:

NASUCA Baltimore Meeting November 11-14, 2012 Mark Schuling, Iowa Consumer Advocate

 First implemented in PA to allow for rate increase outside of a general rate proceeding.  For non-revenue producing investments to replace aging infrastructure.  Eleven states now have DSIC.

 Iowa has available an electric energy automatic adjustment clause. 199 I.A.C. Section  It does not cover capital infrastructure investment.

 In 2011 the Iowa Utilities Board promulgated a rule creating a capital infrastructure investment adjustment clause for rate- regulated natural gas facilities.  The recovery sunsets in four years.

 To be eligible for recovery through the capital infrastructure investment automatic adjustment mechanism, the costs shall either:  a.Meet the following criteria:  (1)The costs are beyond the direct control of management;  (2)The costs are subject to sudden, important change in level;  (3)The costs are an important factor in determining the total cost of capital infrastructure investment to serve customers; and  (4)The costs are readily, precisely, and continuously segregated in the accounts of the utility; or

 b.Be costs for a capital infrastructure investment which:  (1)Does not serve to increase revenues by directly connecting the infrastructure replacement to new customers;  (2)Is in service but was not included in the gas utility’s rate base in its most recent general rate case; and  (3)Replaces or modifies existing infrastructure required by state or local government action or is required to meet state or federal natural gas pipeline safety regulations.

 There is no water utility adjustment clause.  In Iowa there is only one regulated water utility–Iowa American Water.  The IUB could create an adjustment clause in a rate proceeding.

 In 2011, Iowa American Water (IAW) filed a rate proceeding. IAW files every two years.  IAW requested two adjustment clauses - 1. The qualified infrastructure plant replacement surcharge (the “QIP” Surcharge), designed to allow the Company to earn a return of and return on its investments in qualified infrastructure replacement on a timely basis;

2. The revenue adjustment clause (“RAC”), designed to adjust the Company’s revenues on an automatic basis, in the event that they fall below or rise above the levels approved in this case. This issue was dropped before trial.

 Aging infrastructure that needs accelerated replacement.  Replacement will come at a substantial cost.  Will only apply to qualified non-revenue investment.  Allows IAW to earn a return on a timely basis.  The surcharge will be calculated every six months and added to base rates at next rate case.  Capped at 5% of revenue and subject to true- up.

 Enhanced service.  Reduction of water loss.  Smaller rate increases.

 Insufficient proof that the surcharge is needed.  Would allow continuous rate increases every 6 months between rate cases up to 5%.  Eliminates matching of all revenues and costs, and lacks detailed review of charges.  The time between rate cases is a substitute for competition and provides the incentive for cost control.  Reduced risk requires a reduced rate of return.

 IAW proposed QIP does not meet the traditional factors recognized by the IUB.  Regulatory lag and infrastructure replacement are not justifications.  Management practices for maintenance and replacement are not adequate.  No benefit to public in reduced rate of return or increased time periods between rate cases.  Insufficient factual support.