Maximizing ISS Utilization for Small Satellite Deployments and External Hardware/Sensor Testing Photo credit: NASA.

Slides:



Advertisements
Similar presentations
2013 Key Issues Review: Enabling Sustained Deep Space Exploration with a Broad Vision Congressional Visits Day Preparatory Briefing Teleconferences February.
Advertisements

Simulating Ground Support Capability for NASAs Reusable Launch Vehicle Program Kathryn E. Caggiano Peter L. Jackson John A. Muckstadt Cornell University.
AMSAT-NA FOX Satellite Program Review, Status, and Future JERRY BUXTON, NØJY AMSAT VP-ENGINEERING.
Concept Overview for 2 mt Case “2 mt case”: integrated payloads of no more than 2 mt can be landed on the surface of Mars; extension of current Mars EDL.
The Space Logistics Company
What is a U Class Payload?
1 Architecture and Planning Strategies for Addressing Radiation, Space Weather, and Space Climatology Impact on NASA Missions Study Sponsor - NASA Office.
GSFC/Wallops Flight Facility 1 Small Satellite Opportunities at Wallops Flight Facility Dr. John Campbell Director, Wallops Flight Facility.
Formation Flying - T.Sugano Orbital Decay Perturbation in LEO is mainly due to atmospheric drag Orbital decay of space probes (e.g. Space Shuttle, ISS,
1 ESAIL proof of concept mission Juha-Pekka Luntama Pekka Janhunen Petri Toivanen.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
C2V2 Technical Requirements and Constraints
Section 17.0 Propulsion Subsystem Michael S. Rhee Propulsion Lead 5 Space Technology “Tomorrow’s Technology Today” GSFC ST5 PDR June 19-20, 2001.
Spacecraft Structure Development - Vibration Test - (60 minutes)
Launch Opportunities for Standardized Payloads kg The 17th Annual Small Payload Rideshare Symposium June 9-11, 2015 Johns Hopkins University Applied.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
THE OPTIMAL STRUCTURAL DESIGN OF QSAT FM (Flight Model)
→ Potential ESA- Roscosmos Cooperation in Education Activities.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
2 ISS Expansion Utilizing Bigelow Modules Earth Station: Global ISS Marketing – Future of Human Spaceflight Krystal Puga
1 wp4 – Technical Issues for payload integration within the Nacelle for High Altitude flight Budapest 24/11/04 Marco Bobbio Pallavicini Carlo Gavazzi Space.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
1 Formation Flying Project Proposal 2/5/07 Rachel Winters (Team Lead) Aziatun Burhan Tsutomu Hasegawa Shunsuke Hirayama Matt Mueller Masao Shimada Shelby.
Futron Corporation 7315 Wisconsin Avenue, Suite 900W Bethesda, Maryland Phone Fax ISO 9001 Registered Better.
Verification by test and quality assurance
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Air-launched Earth-observing Ground Information System Carleton University’s 4 th Satellite Design Team Introduction to AEGIS.
1 SpaceX proprietary data constituting “Confidential Information” under applicable agreements. Tim Hughes Vice President & Chief Counsel.
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
Preliminary Design of NEA Detection Array Contractor 2 Kim Ellsworth Brigid Flood Nick Gawloski James Kim Lisa Malone Clay Matcek Brian Musslewhite Randall.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
Kayser Italia S.r.l March 2006 INFN LNF - Frascati Kayser Italia’s Experience on payload developments and flight opportunities for space research.
1 Structure (STR) Subsystem Overview Jonah White – STR Co-Lead.
May 17NSF Small Satellite Workshop 1 Student Space Experiment Access - A National Imperative David Yoel & Gil Moore Vanguard.
STRATEGIES FOR MARS NETWORK MISSIONS VIA AN ALTERNATIVE ENTRY, DESCENT, AND LANDING ARCHITECTURE 10 TH INTERNATIONAL PLANETARY PROBE WORKSHOP June,
RASC-AL 2010 Topics. TECHNOLOGY-ENABLED HUMAN MARS MISSION NASA is interested in eventual human mission to the Martian surface. Current Mars design reference.
Minimalist Mars Mission Establishing a Human Toehold on the Red Planet Executive Summary DevelopSpace MinMars Team.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
FEDERAL SPACE AGENCY OF RUSSIAN FEDERATION LAVOCHKIN ASSOCIATION "PHOBOS-GRUNT" PROJECT MISSION CONCEPT & CURRENT STATUS OF DEVELOPMENT IKI, 13 October.
Human Exploration of Mars Design Reference Architecture 5
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
CRICOS No J a university for the world real R ENB443: Launcher Systems Image Credit: ESA Caption: The generic Ariane-5 (Ariane Flight 162) lifting.
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
NanoRacks, LLC Michael D. Johnson (832) Page No. 1 NanoRacks, LLC Cube Lab Cube Lab Ops TIM – Cube Lab Introduction 11/19/2009 Michael D. Johnson.
POIWG 1/26/2015 Mana Vautier This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI)
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Flight Hardware. Flight Profile - STS Flight Profile - SLS Earth Mars 34,600,000 mi International Space Station 220 mi Near-Earth Asteroid ~3,100,000.
 From SmallSat to CubeSat: Reducing Mass Size and Cost Jeremy Straub 1, Ronald Fevig 2, Todd Borzych 2, Chris Church 2, Curt Holmer 2, Martin Hynes 2,
Proprietary & Confidential Information of StratoComm Corporation Bridging The Divide A Blueprint For Creating A New Standard For Equitable Wireless Telecommunications.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Technical Resource Allocations
Future In-Space Operations (FISO) Telecon Colloquium
An Introduction to the NanoRack Platform and CubeLab Modules
Vice President, Business Development
Key Benchmarks in a LEO Economy Robert L. Curbeam Jr.
Main information on the «WORLD SPACE OBSERVATORY» project
Jeff Dutton/NASA COR August 26, 2019
GOLD-2 – Anticipating Customer Needs
Presentation transcript:

Maximizing ISS Utilization for Small Satellite Deployments and External Hardware/Sensor Testing Photo credit: NASA

Sampling of Our ISS Customers

NanoRacks Satellite Deployments Size: 1 U (nanosat) to ~75 kg (microsat) Low-cost 51.6 degree inclination, 385-420 KM Orbit lifetime: 6-12 months (no propulsion) Frequent Launch: Multiple times per year Rapid Launch: Typically 9-14 months from contract to launch Deployment: Typically 1-3 months after berthing to ISS Soft stowage internal ride Easy Contracting Photo credit: NASA

Satellite Deployment Track Record To date, NanoRacks has successfully launched 86 spacecraft to ISS 64 satellites deployed from ISS 16 satellites at ISS awaiting deployment 6 satellites returned to Earth In Pipeline (on contract): 99 Nanosats 3 Microsats (40-50 kg) to be deployed via KABER Photo credit: NASA

2. Launched by ISS visiting vehicle 3. Deployers installed by ISS Crew 6. Deployers positioned by arm 1. Deployers transported in CTBs 4. JEM Air Lock depress 5. Grappled by robotic arm

7. Deploy 8. Robotic arm returns deployer to JEM airlock, retracts and pressurizes 9. ISS Crew un-install first deployer; repeat install/deploy for second set (if necessary)

NanoRacks CubeSat Deployer (NRCSD) Each NRCSD can deploy up to 6U of CubeSats 8 NRCSD’s per airlock cycle, for a total of 48U deployment capability ~2 Air Lock cycles per mission Photo credit: NASA

Introduction to Kaber for Microsats NanoRacks Microsatellite Deployer System Up to ~75 kg microsatellites Within specific volume constraints Kaber uses JEM airlock and ISS robotic infrastructure as deployment platform SPDM for microsatellite-class payloads Kaber Status Hardware delivered for payload integration on April 14, 2015 Successfully passed 2 of 3 safety reviews Initial Flight: Microsatellite manifested on SpaceX-8 (Sep. 2015) 2 Microsatellites on contract for future flights Photo credit: NASA

Kaber Payload Mass & Volume Constraints Max VOLUME: Shown Below Envelope shown is JEM Airlock static envelope. Mission-specific envelope reductions to accommodate tolerance accumulations and micro-G disturbances are TBD. Additional envelope available for other form factors (e.g., a reduction in width allows an increase in length.) Mass: 75 kg Payloads may go over 75 kilograms in some cases. However, center of mass of s/c must be within margin, and ballistic co-efficient of s/c must be less than 91.24 kg/m2 assuming Cd = 2. Length 98.00 cm Width 66.00 cm Height 41.00 cm Length 78.00 cm Width 81.00 cm Height 56.00 cm

Microsat (Kaber) Developer Timeline Keep for CM

Random Vibration Comparison & Flight Acceptance Launch environment to ISS has significant advantages compared to rides on alternative LVs Being wrapped in bubble wrap and soft cargo bags significantly attenuates vibration experienced by s/c About 2 Grms (actual) Testing Required for ISS Flight Safety Certification Flight acceptance testing requires the Satellite be subjected to random vibration along each axis using the profile shown. The test period for each axis shall be 60 seconds. [1] Can take test wrapped in bubble wrap Frequency (Hz) Maximum Flight Envelope (g2/Hz) 20 0.057 (g2/Hz) 20-153 0 (dB/oct) 153 153-190 +7.67 (dB/oct) 190 0.099 (g2/Hz) 190-250 250 250-750 -1.61 (dB/oct) 750 0.055 (g2/Hz) 750-2000 -3.43 (dB/oct) 2000 0.018 (g2/Hz) OA (grms) 9.47 Table 1 Random Vibration Test Profile [1] NASA SSP 50835, Rev C, TABLE 4.3.1.1.2.1.2.3.1-1 SUMMARY OF THE TEST CONDITIONS FOR FOAM PACKED ITEMS FOR QUALIFICATION, PROTOFLIGHT, AND ACCEPTANCE TESTING

Other Satellite Program Requirements Battery flight acceptance test Electrical: 3 inhibits minimum Customer responsible for spectrum & remote sensing licensing Fault-tolerance for deployables Non/low toxicity materials Secondary locking features

External Payload Platform on JEM-EF External Platform Up to 9 4U cubesat size payloads outside the ISS Standard mission duration 15 weeks Excellent viewing conditions for Earth observation Full end-to-end mission service 17 February 2015

External Platform Payload Configurations 58 cm 57 cm 60 cm 1 2 3 4 5 6 7 8 9 10 cm 40 cm EPP-P standard 4U size payload package Unique payload configuration 17 February 2015

External Platform System Design WiFi interface Standard payload provisions Voltage 28 Vdc ± 2 V or 120 Vdc as option Total power 30 W at 28 Vdc Maximum current 2 A USB 2.0 bus 5 Vdc / 500 mA, non-switchable Total payload data rate up to 8 Mbit/s Avionics Grapple fixture for robotic arm operations EP provides all functions of the conventional spacecraft bus Ideal platform for small size hosted payloads No further subsystems necessary Improved anomaly resolution by human in the loop Experiment packages baseplate External Platform – Flight Unit

ISS Manifest Status* Orb-5 3/30/16 SpX-11 6/2/16 Orb-6 6/30/16 HTV-6 NET 11/1/16 SpX-13 2/7/17 * Subject to change