ASME – WORK SHOP - KUALA LUMPUR 2003 By:

Slides:



Advertisements
Similar presentations
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
Advertisements

M. J. Haigh Well Design Differentiators CO 2 Sequestration in Depleted Reservoirs SPE Presented at Offshore Europe 2009 Conference.
E-petroleumservices.com 1 Business Benefits Delivered through True Valve Performance Yvonne Roberts Edinburgh Petroleum Services.
Real-Time Gas Lift Optimization
GAS LIFT OPERATION By : Ubet Khoirudin TOTAL E&P INDONESIE.
Flow Behavior of Gas-Condensate Wells - the impact of composition
1 Product Flow Model May 2008 Product Flow Model Overview.
Feb. 6, ASME/API Gas-Lift Workshop1 Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation.
WELL PERFORMANCE ANALYSIS
Completion Object Overview June 2013 WITSML/PRODML Standards.
Liquid Loading Current Status, New Models and Unresolved Questions
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
Foam Flow Meeting, Jul.9th, New Comprehensive Equation to Predict Liquid Loading Shu Luo The University of Tulsa.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
Trouble Shooting Lynn Rowlan Beam Pumping Workshop Houston, Texas October 4 - 7, 2005.
NOT AN OFFICIAL UNCTAD RECORD. 2 Defining the Reservoir Defining the Reservoir WesternGeco Reserve Definition ( SPE & WPC) “ Proved reserves are those.
INFLATABLE DST EQUIPMENT
PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l
Preliminary Reservoir Model MC252 6-July DRAFT Outline Modelling approach & purpose Input Data & Model −Rock & Fluid Properties −Layering −Aquifer.
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Lesson 25 Well Control, cont’d
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
Downhole Pressure Monitors Halliburton Pressure Transmission Systems (PTS) have been in use at SYU since 1984 (Hondo) & 1993 (Harmony & Heritage) Have.
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
Optimum Performance in Dual Gas-Lift Wells ASME/API/ISO Spring 2004 Gas-Lift Workshop February 10-11, 2004.
By: Gatut Widianoko Weatherford Artificial Lift Systems
PECTEN CAMEROON COMPANY Subsidiary of SHELL E&P Int’l
Gas Lift Design Philosophy for Chevron’s Subsea Developments
DYNAMIC UNDERBALANCE PERFORATIONS BRING HIGHER PRODUCTIVITIES THAN CONVENTIONAL PERFORATIONS A large scale comparative review from the Tunu Gas Field (Indonesia)
Gas Lift Redesign in Dual Strings Completion
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
Smart Automation Well Venting Lessons Learned from Natural Gas STAR Producers Technology Transfer Workshop ExxonMobil Production Company, American Petroleum.
© Copyright 2006 POSC1 Gas Lift Scenario Flow Network Construction.
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
Gaslift Management in PDO Northern Directorate
Characterising Gas-lift Instabilities with OLGA2000
ASME Gas Lift Workshop Spring 2004 Dual Gas Lift Breakout Session Dual Gas Lift Breakout Session February 10, 2004.
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
How to Maintain High Producing Efficiency in Sucker Rod Lift Operations Lynn Rowlan.
Analysis of Gas Lift Transient Effects Henry Nickens Adam Ballard BP - Houston.
Nov. 12, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology.
SURVEILLANCE & OPTIMIZATION PROCESSES ASME/API GAS LIFT WORKSHOP ASME/API Gas Lift Workshop ExxonMobil Production Organization U. S. West Artificial Lift.
© Copyright 2006 POSC1 Production Reporting Overview.
Automating Continuous Gas Lift
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
Installing Plunger Lift in Gas Wells Lessons Learned from Natural Gas STAR from Natural Gas STAR Exploration & Production, Gulf Coast Environmental Affairs.
SURGE Compressor surge is an unstable phenomenon where the gas flow forward and backward across the machine alternatively. This phenomenon occurs at certain.
LAFAYETTE, LA NEW ORLEANS, LA HOUSTON, TX.
© Copyright 2005 POSC Volume Reports and Flow Networks Overview.
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
Advanced Artificial Lift Methods Prepared by Dr. Nguyen Advanced Artificial Lift Methods – PE 571 Introduction.
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
“Perspectives on Montana’s Petroleum Industry” MREA-MPA-MONTAX “Bridges to the Future” Conference October 15, 2009 Dave Ballard President Ballard Petroleum.
Lecture 10 Production Engineering
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
EGLV – ELECTRIC GAS LIFT VALVE (Field Trial at S181) - THE OPERATOR’S PERSPECTIVE.
Schlumberger Artificial Lift Engineering
Analysis of Heading in Artificially Lifted Wells
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Continuous Flow (IPO) Valves
Flow Network Construction
Gas-Lift Design Outline
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Gas-Lift Breakout Session Report Out Fall 2003 Gas-Lift Workshop
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Presentation transcript:

CASING HEAD PRESSURE FINE TUNING in Dual String Gas Lift Well With Injection Pressure Operated Valve ASME – WORK SHOP - KUALA LUMPUR 2003 By: Gatut Widianoko ( Weatherford ) Herry Subekti ( BP – Indonesia ) Wahyu Jatmiko ( BP – Indonesia )

Abstract After two ( 2 ) years gas lift optimization performed with concentrated in gas lift change out, starting this year 2003, Bp -Indonesia begin to focus on Casing Head Pressure Tuning. The first year, the gas lift optimization had made 3500 bopd oil gain, and the second year had made 4000 bopd oil gains. This year, up-to the second quarter 2003, BP had made 4500 bopd oil gains. This total gains is came from 40 % gas lift change out, and 60 % from Casing Head Pressure Tuning. Today we are going to talk about the steps of casing head pressure tuning of the BP-Indonesia gas lift optimization on dual string gas lift well as follow : 1) Identify the gas lift well problems ; 2) Nodal analyzing to determine the well potential ; 3) Optimize point of injection of both string by gas lift change out ; 4) Perform Tuning Casing Head Pressure to optimize both string.

Offshore North West Java Oil Field JAKARTA BIMA ARDJUNA AV AVS AA MX MQ MR MM MB LL L BZZ B K U E F ZU P 25 50 KM X KLX KLY KNA KL KK APN O CILAMAYA KALIMANTAN SULAWESI SUMATERA J A V A GG GG Gas Accumulation “O” AREA POD ARIMBI CIREBON

BP Wells General Conditions Old Oil Field with more than 30 years old High FGOR with 1000 : 1 or more Low PI with only about 1 – 3 blpd / psi Low Production with about 200 - 500 blpd Low Static Pressure with average ~ 600 psi Limited Casing Pressure with ~ 600 psi only Flowing Tubing Pressure is about 180 psi Shallow well - reservoir depth ~ 3000 ft TVD Limited data (SBHP and PI is normally unknown) Old wells - may have leaking valve or tubing Some gas lift valves installed 5-10 years ago Some gas lift header choke stuck open/close

Dual Completion ECHO - WELLs Adjust CHP , Reduce / increase COMPLETION DIAGRAM NOT TO SCALE 9-5/8” Shoe @ 4285’ MD 2-7/8” SSSV @ 286’ Packer @ 3111’ MD Packer @ 3504’ EZ-27 ( 4016’ - 4021’ ) ( 4025’ – 4031’ ) ( 4035’ – 4043’ ) ( 4050’ – 4062’ ) 1050’ 3032’ 2-7/8” SPM 1012’ 2625’ 3007’ 2-7/8” WB-1D SSD @ 3383’ 2-7/8” WB-1D SSD @ 3183’ 2-7/8” SSSV @ 248’ EZ-22B ( Squeezed-Off ) Packer @ 3340’ 2-7/8” WB-1D SSD @ 3584’ 2-7/8” WB-1D SSD @ 3100’ EZ-23 ( 3389’ - 3406’ ) EZ-24B ( 3590’ - 3609’ ) PBTD @ 4205’ MD Packer @ 3900’ 2-7/8” WB-1D SSD @ 3164’ 1898’ 2652’ 1866’ Find CHP problems Adjust CHP , Reduce / increase Slowly until get best production rate. Repeat it if needed. Keep best this CHP as operating pres. Great savings of time & efforts Dual Completion

CHP Fine Tuning Candidates Wells ( Gas Lift Optimization ) Suddenly production rate drop Suddenly the well dead Casing Head Pressure unstable Suddenly gas injection rate increase/decrease Inaccurate gas rate measure Robbing, and cause one (1) string dead or drop The well shutdown under maintenance The well shut-in while service status Gas lift Change out is being perform Suddenly Casing Head Pressure Increase Suddenly Casing Head Pressure decrease Suddenly Flowing Tubing Head Pressure increase

Casing Head Pressure Tuning Steps in Dual Gas Lift well Use graphical method to construct the well condition. Draw the static and flowing pressure gradient, etc. Select Kick Off and best Operating pressure available. Use 90% (max) off Kick Off as Operating pressure. Select best point of injection of both string ( close or same depth ) and operating port size (close or same size). Use same surface opening and closing pressure for both string valve. Perform gas lift well performance by software on each string to determine optimum condition . Perform CHP tuning by open the Gas Lift Header Choke and set at the kick off pressure selected. Adjusts the CHP slowly to reach the Best Surface Operating Pressure selected. Record the Rates. Select the best rate and keep best CHP.

Graphical Method (To determine best Point of Injection, KO and OP) Echo- Wells PRESSURE (p s i) 500 1000 1500 FTP CHP D E P T H Ft V 0.1 p s I / ft Casing Pressure FL 1000 #1 Tubing Pressure #2 2000 #3 0.45 p s i / ft #7 3000 Mid Perforation FBHP 1200 p s i 4000 Operating Pres. Kick Off

Gas Lift Well Performance Gas Injection Rate Vs Production Rate Optimum Point Q l Q i Q I : Gas in Rate mscfd Q l : Prod. Rate blpd

Why Do instead of Casing Head Pressure tuning Gas Injection Rate Tuning ?

Gas Measurement Problems Not each platform has a good measurement facilities Some Gas Measuring inaccurate Gas Injection rate not recorded Gas in VS CHP does not make sense We Decided Using CHP as parameter to optimize gas injection Adjust CHP to find a best production rate of both String Measure Gas In, after best CHP reached / selected Record and keep best CHP of each Well

WHAT IS BEST CHP Back to The Original Operating Pressure Design Where is the existing CHP ? Is it too high ? Any un-loader valve reopen? Is the existing gas in too much ? Do We need to decrease it ? OR Is it too low ? Is the existing gas in too low ? Can the existing CHP pressure reach the operating valve ? Do we need to Increase it ? Any actions needs to be done ?

Decreasing CHP (To determine Best Operating Pressure) Existing CHP Too High Echo- Wells PRESSURE (p s i) 1500 FTP 500 CHP 1000 D E P T H Ft V 0.1 p s I / ft Casing Pressure FL 1000 #1 Tubing Pressure #2 2000 #3 0.45 p s i / ft #7 3000 Mid Perforation 1200 p s i FBHP 4000 Best Operating Pres. Kick Off

Increasing CHP (To determine Best Operating Pressure) Existing CHP Too Low Echo- Wells PRESSURE (p s i) 500 1000 1500 FTP CHP D E P T H Ft V 0.1 p s I / ft Casing Pressure FL 1000 #1 Tubing Pressure #2 2000 #3 0.45 p s i / ft #7 3000 Mid Perforation FBHP 1200 p s i 4000 Operating Pres. Kick Off

Some Wells Sample of CHP tuning at BP-Indonesia Best CHP Oil Gains : 250 b o p d Best CHP : 520 p s i Sample : A

Some Wells Sample of CHP tuning at BP-Indonesia 440 Best CHP Oil Gains : 70 b o p d Sample : B

Some Wells Sample of CHP tuning at BP-Indonesia Best CHP Oil Gains : 80 b o p d Sample : C Best CHP : 590 p s i

Sample of One Platform CHP Tuning Results * Total Gains for one platform by CHP tuning : 150 b o p d * Gas gains is not recorded * Working Days : 10 days.

Total Oil Gains by CHP Tuning YTD up to 2nd Qtr

Total Oil Gains by Gas Lift Change Out YTD up to 2nd Qtr’ 03

Total Oil Gains After Gas Lift Optimization YTD up to 2nd Qtr’ 03

Tuning Results VS Gas Lift Change Out Results up to 2nd Qtr’ 03

Well Work Percentage TOTAL GAS LIFT JOB YTD UP TO 2nd Qtr’ 03 Total Wells analyzes : 190 wells Completed by Wire line : 31 wells : 87 Wells potential : 18 Wells had optimum : 5 New wells : 44 Wells CHP Tuning : 36 Wells Needs FGS & SBHP survey

Total Oil Gains After Gas Lift Optimization YTD Up to 2nd Qtr’ 03

CHP Tuning – Lessons Learned ( With Injection Pressure Valve ) Enough Kick Off (KO) and Operating (OP) Pressure to reach deepest point of injection is required Differential pressure between KO and OP is ~10% of casing pressure, (or at least 50psi). Use graphical method to select best point of injection and best draw down of both (200 – 500 psi) strings. Surface opening pressure of both string are same. Use at least 10 psi less than the CHP available. Surface closing pressure of both strings must be at least 20 psi above OP, and 30 psi less than KO To avoid “gas robbing” - depth point of injection of both strings must be close or equal; same thing in the port size Perform CHP tuning to reach Optimum Conditions Watch the CHP performance and Keep it at best CHP.