09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
TOF offline and calibration A. De Caro (University and INFN of Salerno)
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Susanne Kersten, Wuppertal University November 21/22, 2013.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
TOF code status report : raw data data visualization geometry A. De Caro for the TOF group.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
10/09/10FV 1 News and observations from Brussels' meeting.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
Compact data acquisition and power supply system designed for hostile environment condition concerning radiation and magnetic field A. Mati, S. Petrucci,
BaBar Transition: Computing/Monitoring
SPD DCS Overview & FED Server
ATLAS MDT HV – LV Detector Control System (DCS)
The IFR Online Detector Control at the BaBar experiment at SLAC
TPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Presentation transcript:

09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building 29, 9 December 2009

09/12/2009ALICE TOF General meeting 2 The Detector Control System (DCS) has to provide:  A full detector description and a direct access to devices (HV and LV power supplies, VME crates, electronics cards, …);  Finite State Machine (FSM) based mechanism to synchronize the state of the detector with the operation of the physics data acquisition system and with LHC state;  Online controls.

09/12/2009ALICE TOF General meeting 3 Online controls means:  Continuously monitoring of important parameters as: environmental parameters (Cavern temperature, pressure and humidity, magnets current and voltage, …) services (gas distribution, cooling water circulation, …) detector operational parameters (HV and LV channels current, readout status, …)  Archiving of most relevant parameter values (HV and LV channels current, boards temperature, …) to allow a further access to this information. At present 4520 parameters are being archived.  Alarm handling which provide a way to signal in real time any abnormal behavior with defined manual or automatic actions to be taken in order to recover it. More than 6480 alarms have been defined.

09/12/2009ALICE TOF General meeting 4 Services: Gas Distribution system Cooling system

09/12/2009ALICE TOF General meeting 5 Gas Distribution system TOF total gas flow  40 l/h per SM Ingoing and outgoing fluxes for each half of SM are monitored At present the SMs are fluxed with an 93% C 2 H 2 F 4 and 7% SF 6 gas mixture

09/12/2009ALICE TOF General meeting 6 Water temperature at the beginning of the cooling line Water temperature at the end of the cooling line Water Cooling system Cooling water fluxes for Read-out and Front-end electronics TOF startup on 25 September 2009 Day and time 14°C 15°C 16°C 17°C

09/12/2009ALICE TOF General meeting 7 TOF Operational parameters: TOF temperature Front-end cards online monitor Full TOF dark current

09/12/2009ALICE TOF General meeting 8 TOF Temperature The temperature of the TOF is continuously monitored by means of = 8640 temperature sensors. Average crate internal temperature ≈ 32°C Average temperature in the SM electronic volume ≈ 17°C

09/12/2009ALICE TOF General meeting 9 TOF Temperature TOF turned off The increase of L3 temperature due by the TOF is of the order of 0.6°C in a good agreement with the ALICE request.

09/12/2009ALICE TOF General meeting 10 TOF Temperature SuperModules Side C Side A Electronic cards off because of power supply failures A non uniformity has still to be completely understood.

09/12/2009ALICE TOF General meeting 11 Front-end cards online monitor The FEAC cards distribute the power supply and the threshold level to the FEAs and get back the OR signal of each couple of deasy-chained FEAs. The main Front-end card parameters are read back by the Local Trigger Module (LTM). There are 1 LTM and 8 FEA Controller cards for each quarter of SM. FEA Controller x8 LTM

09/12/2009ALICE TOF General meeting 12 Front-end cards online monitor macro-pad (48 pads) single rate ≈ 33.6 Hz  0.08 Hz/cm 2 FEA Controller x8 LTM

09/12/2009ALICE TOF General meeting 13 HV channels OFF, average current 1.7uA Average current drawn by full 13 kV is less than 1uA (1568 MRPCs in total  less then 1nA per MRPC). Full TOF Dark Current HV 1kV (safe condition with unstable beams)

09/12/2009ALICE TOF General meeting 14 Conclusions: All the environmental parameters, services and detector operational parameters are continuously monitored. Tools have been developed to signal in real time any dangerous or abnormal behavior and to automatically recover it. From an hardware point of view the TOF detector looks working fine.

09/12/2009ALICE TOF General meeting 15 RESERVE

09/12/2009ALICE TOF General meeting 16 Water temperature at the beginning of the line Water temperature at the end of the line 355 (l/min) * 1.5 kQ ≈ 2,23 MJ/min 47kW/sec ≈ 2.82 MJ/min Water Cooling system

09/12/2009ALICE TOF General meeting 17

09/12/2009ALICE TOF General meeting 18 pp collisions