The Stage 2 Disinfection By-Products Rule DoD/EPA State Conference Compliance Track DoD/EPA State Conference Compliance Track Atlanta, GA Atlanta, GA June.

Slides:



Advertisements
Similar presentations
Systems Working Together to Comply with New LT2/Stage 2 M/DBPRs KY & TN Wholesale.
Advertisements

Regulatory Review Presented by: Joe Munson. Outline  New Employee/Office  Lead and Copper Reminder  Stage 2 Disinfection Byproduct Rule.
The Stage 1 Disinfectants/Disinfection Byproduct Rule.
Electronic Consumer Confidence Report (CCR) Rule AWWA Alabama-Mississippi Section ADEM Regulation Update May 30, 2013 Laura A. Taylor (334)
Maine Laboratory Certification Program June 20, 2013 Jennifer Jamison Laboratory Certification Officer Phone: (207)
Ground Water Rule Review, Updates and Compliance Plans MSDH – Bureau of Public Water Supply Spring 2012.
Tim Stefanich - Environmental Engineer Sioux Falls Water Purification Cryptosporidium Monitoring for Compliance with the LT2 Rule.
Surface Water Treatment Rule Bob Clement Drinking Water Program U.S. EPA Region 8.
Slide 1 Delta Water Quality: Implications for Utility Compliance with the Safe Drinking Water Act Edward G. Means III Sr. Vice President McGuire Environmental.
Planning for and Collecting Valid and Meaningful Drinking Water Samples 1 James Latimer Environmental Program Specialist Drinking Water Program AK Dept.
1 If you do not have a copy of the Stage 1 DBPR handouts, a copy can be downloaded from the Encounter Collaborative meeting page:
Sustained Compliance Workshop - Anchorage, AK September 23-24, 2010 Eric Burg Kenai Peninsula & Southeast Alaska – Compliance & Monitoring Section DEC.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Sustained Compliance for Public Water Systems, Chapter 2 Workshop The Significant Non-Complier List.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Combined Ozonation-Nanofiltration for Drinking Water Treatment B. S
1 Filter Backwash Recycling Rule FBRR Final: June 8, 2001.
Drinking Water Technical Assistance Water Treatment Plant and Distribution System KY Water and Wastewater Operators Association 57 th Annual Conference.
Stage 2 DBP Plan Workshop May 2013 Janice Thomas, CDPH Sonoma District, Drinking Water Field Operations Branch.
1 Long Term 2 Enhanced Surface Water Treatment Rule – LT2 Mark McIntire Drinking Water Program SDWWA Water Seminar February 7, 2006 Please ask questions.
Revised July 2015 Safe Drinking Water Program.
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
Massachusetts Department of Environmental Protection Drinking Water Program.
Leah A. Guzman Environmental Program Specialist Drinking Water Program Alaska Department of Environmental Conservation Sustained Compliance—What It Means.
Monitoring Plan Template
Stage 1 and 2 Disinfection Byproduct Rule presented by: Joseph Munson.
Overview of the Microbial and Disinfection By Products Rules in Alaska Presented by: Jeanine Oakland Statewide Compliance/Enforcement Coordinator Drinking.
Stage 2 Disinfectants and Disinfection Byproducts Rule Bruce Macler USEPA Region H Br Cl Bromodichloromethane.
MassDEP Drinking Water Program 2014 An Overview Yvette DePeiza, Director Drinking Water Program CERO - 7/29/2014.
Mississippi State Department of Health
Regulatory Update Silver Falls Conference 2006 DHS Drinking Water Program.
To Protect and Enhance Kentucky’s Environment Revised Total Coliform Rule RTCR Kentucky Implementation January 1 st, 2016.
The Radionuclides Rule Monitoring, Compliance, and Substitution.
Ground Water Rule Workshop Department of Environmental Conservation September 22-23, 2009 Dan Weber & Gloria Collins Regulations Team DEC Drinking Water.
STAGE 2 DISINFECTION BY- PRODUCTS (DBP’S) A GUIDE TO COMPLIANCE 1.
Primacy Revision Application The Arsenic Rule. Major Points Components of Primacy Revision Application Attorney General’s Statement Special Primacy Requirements.
What effects do they have in drinking water
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 MCLsMonitoring RulesReporting.
State of Alaska Implementation of MBDP Rules Carrie Bohan Environmental Program Specialist ADEC DW Program.
Drinking Water Compliance “Top 10” KY Water and Wastewater Operator Association Conference Louisville, Kentucky.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Denver Water’s Preparation for the Stage 2 Disinfectant By-Product Rule Bruce Hale (DW) Steve Lohman (DW) Arnold Strasser (DW) Edward Koval (B&V)
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
Disinfectants and Disinfection Byproducts Rule (Stage 1&2 DBPRs) Wyoming Potable Water Age, Lagoon Aeration and Utility Line Replacement Seminar Hosted.
TOTAL COLIFORM MONITORING 40 CFR TRANSIENT NON-COMMUNITY PUBLIC WATER SYSTEMS.
1 Exceptional Events Rulemaking Proposal General Overview March 1, 2006 US EPA.
EPA Groundwater Rule 40 CFR Parts and 142. Reasons for the Groundwater Rule  To protect public health due to viruses and other bacterial exposure.
Revised Total Coliform Rule Sandy Brentlinger Southwest Drinking Water.
Purpose of Water Treatment c. Safe Drinking Water Act and SDWA amendments.
Revised Total Coliform Rule (RTCR) Community Systems Rychel McKenzie Jason Pushard December 2015.
1 TCEQ Drinking Water Sample Collector Training October 2006 Alicia Diehl TCEQ Public Drinking Water Section UCMR Sampling TCEQ Drinking Water Sample Collector.
Not all changes will be discussed please view all regulations at
Total Coliform Rule (Old)vs. Revised Total Coliform Rule (New)
Level 2 Assessment. Abbreviations to Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
Reporting, Public Notification and Recordkeeping 40 CFR ,.32, and.33 Ken Morin Bureau of Land Management.
SWRCB Public Workshop for Periodic Review January 10-12, 2005 Slide 1 Issue 4c New Objectives Greg Gartrell Assistant General Manager Contra Costa Water.
Level 1 Assessment. Abbreviations To Know RTCR – Revised Total Coliform Rule TCR – Total Coliform Rule TC – Total Coliform EC – E. Coli PN – Public Notice.
Hexavalent Chromium MCL Regulation Guidance Eric Zuniga, PE San Bernardino District SWRCB – DDW.
SAFE DRINKING WATER GENERAL UPDATE TO CHAPTER 109 June 19, 2007 Bureau of Water Standards and Facility Regulation.
Water Quality Facts John Shirey City Manager William Busath, P.E. Director of Utilities Pravani Vandeyar Water Quality Superintendent.
Total Coliform Rule (TCR)
Lead and Copper Rule (LCR)
TCEQ Office of Water Water Supply Division
Sample Siting Plans under the Revised Total Coliform Rule
Sample Site Plans.
OHWARN Workshop Disruption of Service Rule Update
Disinfection Byproducts (DBPs) Operational Evaluation Level (OEL)
PUBLIC WATER SYSTEM PLAN and EXCEPTION REVIEW
Trihalomethanes Removal Evaluation
Presentation transcript:

The Stage 2 Disinfection By-Products Rule DoD/EPA State Conference Compliance Track DoD/EPA State Conference Compliance Track Atlanta, GA Atlanta, GA June 21, 2007 June 21, 2007 Amy Newbold Environmental Engineer Drinking Water Section EPA Region 4

Review: What are Disinfection By- Products? Precursor in Water Natural Organic Matter (NOM) Bromide + Added Disinfectant Chlorine Chloramines Chlorine Dioxide Ozone = Total Trihalomethanes (TTHM) Haloacetic Acids (HAA5) Chlorite Bromate DBP

Health Risks of DBPs – Public Notification   DBPs, including trihalomethanes (THMs) and haloacetic acids (HAAs), have been shown to cause cancer in laboratory animals.   DBPs have been shown to affect the liver and the nervous system, and cause reproductive or developmental effects in laboratory animals.   Exposure to certain DBPs may produce similar effects in people. EPA has set standards to limit exposure to THMs, HAAs, and other DBPs

Stage 1 Disinfection By-Products Rule  Published December 1998  Applies to all CWS and NTNCWS that treat their water with a chemical disinfectant for either primary or residual treatment  TTHM MCL = mg/L  HAA5 MCL = mg/L  Monitoring depends on number of “plants” Multiple wells drawing from same aquifer may be considered one treatment plant Multiple wells drawing from same aquifer may be considered one treatment plant  Sample at Max Residence Time (MRT) and Average Residence Time (ART) if taking more than 1 sample per plant and Average Residence Time (ART) if taking more than 1 sample per plant  Compliance based on Running Annual Average of quarterly results

Stage 2 Disinfection By-Products Rule - NEW  Published January 4, 2006  Applies to CWS & NTNCWS that add and/or deliver water that is treated with a primary or residual disinfectant other than UV. Consecutives Systems Required to Monitor under Stage 2. Consecutives Systems Required to Monitor under Stage 2.  MCLs are the same  Compliance based on Locational Running Annual Average instead of Running Annual Average.  Monitoring based on population served instead of number of plants  Has 2 Parts Initial Distribution System Evaluation (IDSE) and beyond - Compliance Monitoring  Operational Evaluation Levels (2012 and beyond)

New Definitions  Wholesale System - is a public water system (PWS) that treats source water as necessary to produce finished water and then delivers some or all of that finished water to another PWS. Delivery may be through a direct connection or through the distribution system of one or more consecutive systems.  Consecutive System - is a PWS that receives some or all of its finished water from one or more wholesale systems. Delivery may be through a direct connection or through the distribution system of one or more consecutive systems.  Combined Distribution System (CDS) - is the interconnected distribution system consisting of the distribution systems of wholesale systems and of the consecutive systems that receive finished water.

More New Definitions...  Dual Sample Set - is a set of two samples collected at the same time and same location, with one sample analyzed for TTHM and the other sample analyzed for HAA5. Dual sample sets are collected for the purposes of conducting an IDSE (part1) and determining compliance with the TTHM and HAA5 MCLs (part 2).  Locational Running Annual Average - is the average of sample analytical results for samples taken at a particular monitoring location during the previous 4 calendar quarters.

RAA vs. LRAA Calculation  Stage 1 – RAA (4 samples per plant example) (Samp1 + Samp2 + Samp3 + Samp4)/4 = Quarterly Average (Samp1 + Samp2 + Samp3 + Samp4)/4 = Quarterly Average (Q1 + Q2 + Q3 + Q4)/4 = RAA (Q1 + Q2 + Q3 + Q4)/4 = RAA  Stage 2 – IDSE and Compliance Monitoring (Site1 Q1 + Site1 Q2 + Site1 Q3 + Site1 Q4)/4 = LRAA for Site 1 (Site1 Q1 + Site1 Q2 + Site1 Q3 + Site1 Q4)/4 = LRAA for Site 1 (Site2 Q1 + Site2 Q2 + Site2 Q3 + Site2 Q4)/4 = LRAA for Site 2 (Site2 Q1 + Site2 Q2 + Site2 Q3 + Site2 Q4)/4 = LRAA for Site 2 (Site3 Q1 + Site3 Q2 + Site3 Q3 + Site3 Q4)/4 = LRAA for Site 3 (Site3 Q1 + Site3 Q2 + Site3 Q3 + Site3 Q4)/4 = LRAA for Site 3 (Site4 Q1 + Site4 Q2 + Site4 Q3 + Site4 Q4)/4 = LRAA for Site 4 (Site4 Q1 + Site4 Q2 + Site4 Q3 + Site4 Q4)/4 = LRAA for Site 4

Part 1 of the Stage 2 Rule - The Initial Distribution System Evaluation (IDSE)

Initial Distribution System Evaluation  Applies to NTNCWS that serve > 10,000 and all CWS  Purpose is to Identify best locations to monitor TTHMs and HAA5s.  One-time Study – 1 year of increased monitoring  Use results from IDSE and Stage 1 data (part 1), to select compliance monitoring locations for the Stage 2 DBPR (part 2).

Stage 2 DBPR – IDSE Options VSS Waiver 40/30 Certification System Specific Study Standard Monitoring (Most Common Option) IDSE Options 1342

VSS Waivers  Criteria Serve fewer than 500 people Serve fewer than 500 people Have taken TTHM and HAA5 samples Have taken TTHM and HAA5 samples  Waivers effective immediately No application necessary No application necessary Systems must meet all criteria Systems must meet all criteria  Primacy agency may deny waiver and require Standard Monitoring or System Specific Study  VSS Waiver is only a waiver from additional IDSE activities.  No IDSE Report  Continue compliance with Stage 1 DBPR until Stage 2 DBPR compliance begins & Revise Stage 1 DBPR monitoring plan for Stage 2 DBPR

40/30 Eligibility Criteria  Systems must have taken all required Stage 1 DBPR samples: Within specified 2-year eligibility period based on system size Within specified 2-year eligibility period based on system size No individual sample can have exceeded: No individual sample can have exceeded: mg/L for TTHM (40 μg/L)0.040 mg/L for TTHM (40 μg/L) mg/L for HAA5 (30 μg/L)0.030 mg/L for HAA5 (30 μg/L) No TTHM or HAA5 monitoring violations within specified time period No TTHM or HAA5 monitoring violations within specified time period  Continue compliance with Stage 1 DBPR until Stage 2 DBPR compliance begins & Revise Stage 1 DBPR monitoring plan for Stage 2 DBPR Sch.Population Eligibility Period Beginning No Earlier Than*: Submit 40/30 Certification By: 1 >100,000 January 2004 Oct. 1, ,000-99,999 Apr. 1, ,000-49,999 January 2005 Oct. 1, <10,000 Apr. 1, 2008

System Specific Studies (HQ)  2 Types of SSS: Hydraulic Model Hydraulic Model Specific requirements laid out in IDSE Guidance Manual – Chapter 6Specific requirements laid out in IDSE Guidance Manual – Chapter 6 Submit SSS planSubmit SSS plan HQ will review all hydraulic models in Region 4HQ will review all hydraulic models in Region 4 If approved, conduct monitoring based on System Specific Study PlanIf approved, conduct monitoring based on System Specific Study Plan Existing Monitoring Results Existing Monitoring Results Samples must be collected no earlier than 5 years prior to the study plan submission date.Samples must be collected no earlier than 5 years prior to the study plan submission date. Submit SSS planSubmit SSS plan HQ will review most existing monitoring SSS unless State requested otherwiseHQ will review most existing monitoring SSS unless State requested otherwise If Approved, continue to monitor according to Stage 1 until Stage 2 Compliance period begins.If Approved, continue to monitor according to Stage 1 until Stage 2 Compliance period begins.

Most Common IDSE Submission – Standard Monitoring Plan  Standard Monitoring: One year of increased distribution system monitoring to find locations with high TTHMs an HAA5s.  Stage 1 Monitoring Will Continue During IDSE Results from IDSE Standard Monitoring should not be used to determine compliance with Stage 1 Results from IDSE Standard Monitoring should not be used to determine compliance with Stage 1 MUST continue to monitor Stage 1 sites according to Stage 1 monitoring plan. MUST continue to monitor Stage 1 sites according to Stage 1 monitoring plan.

Standard Monitoring IDSE Steps Select Standard Monitoring Locations Prepare and Submit Standard Monitoring Plan Conduct Standard Monitoring Select Stage 2 DBPR compliance monitoring locations Prepare and Submit IDSE report EPA or the state approves the Standard Monitoring Plan 3 If you haven’t heard from EPA or State within 12 months of submitting SMP

How to Prepare a Standard Monitoring Plan (SMP)   Use Form 6 of the IDSE Guidance Manual (Chapter 7) Submit by mail or to EPA Submit by mail or to EPA to: to: Mail to: Stage 2 DBPRMail to: Stage 2 DBPR US EPA – IPMC US EPA – IPMC PO Box 98 PO Box 98 Dayton, OH Dayton, OH  Or Use the IDSE Tool on website:  Submit Distribution Schematic Showing: Locations of Sources Locations of Sources Entry Points Entry Points Storage Facilities Storage Facilities Standard Monitoring Locations Standard Monitoring Locations Stage 1 Monitoring Locations Stage 1 Monitoring Locations

Standard Monitoring Requirements Ground Water  Monitoring Requirements Based PWS population (dual sample sets)  For Groundwater systems or systems that purchase GW PopulationFrequencyTotalNear EPARTHigh TTHM High HAA5 < 5001/year (2) 21 (3) ,999 4 (every 90 days) ,000 – 99, , , > 500,

Standard Monitoring Requirements – Surface Water (CFR ) PopulationFrequencyTotalNear EPART High TTHM High HAA5 <5001/year (2) 21 (3) ,300 4 (every 90 days) ,301-9, ,000-49,999 6 (every 60 days) , , , , ,000,000-4,999, > 5,000,  For Surface and GWUDI systems and systems that purchase surface or GWUDI

Good Site Selection Characteristics (Use Chapter 7 of Guidance Manual):  Entry Points Disinfected Entry Points (excluding pure UV) Disinfected Entry Points (excluding pure UV)  Average Residence Time Sites Flow weighted or population weighted Flow weighted or population weighted Tracer Study Tracer Study Disinfectant Residual Avg Disinfectant Residual Avg  High TTHM Sites High Water Temp High Water Temp Increased Water Age Increased Water Age Near Dead Ends (before last group of customers) Near Dead Ends (before last group of customers) Hydraulically downstream of storage tanks Hydraulically downstream of storage tanks  High HAA5 Sites High Water Temp High Water Temp Low Residuals Low Residuals Lower Water Age (if biodegradation is occurring) Lower Water Age (if biodegradation is occurring) Increased Water Age (if no biodegradation) Increased Water Age (if no biodegradation)

Biodegradation Check  Three Questions: Are the highest HAA5 values typically in the summer months? Are the highest HAA5 values typically in the summer months? Are the highest HAA5 values at MRT? Are the highest HAA5 values at MRT? Do highest HAA5 values generally occur at same time of year as TTHMs? Do highest HAA5 values generally occur at same time of year as TTHMs?  If Yes to all 3 – unlikely that biodegradation is taking place  If No to Any – HAA compounds may be degrading due to biological activity.

What’s Your Schedule? Schedule Sys Serving (or connected to a sys serving): Submit 40/30, SMP, or SSS By: Complete Standard Monitoring or SSS By: Submit IDSE Report By: 1 > 100,00010/1/20069/30/20081/1/ ,000–99,9994/1/20073/31/20097/1/ ,000–49,99910/1/20079/30/20091/1/ < 10,0004/1/20083/31/20107/1/2010  IDSE Schedule determined by the population served a PWS or by the largest population served by a PWS in your CDS. population served by a PWS in your CDS.

Review of Standard Monitoring Plan  State or EPA(FL only) will review & and approve or ask system to modify their SMP.  If the State or EPA(FL only) does not approve or contact the system to modify the SMP within 12 months from the date it was due, the system can consider the plan approved  Conduct Standard Monitoring in accordance with the plan.

Next Steps after IDSE Plan Submittal  Once SMP is Approved, Conduct 12 months of monitoring based on Standard Monitoring Plan  Determine Stage 2 Compliance Monitoring Locations Use protocol in IDSE Guidance Manual (Chapter 7) Use protocol in IDSE Guidance Manual (Chapter 7) From IDSE Results and Stage 1 Results during Standard Monitoring From IDSE Results and Stage 1 Results during Standard Monitoring  Prepare and submit IDSE Report Stage 2 Monitoring Plan Stage 2 Monitoring Plan Deadline – depends on schedule (3 months from deadline for completion of IDSE monitoring) Deadline – depends on schedule (3 months from deadline for completion of IDSE monitoring)  Begin Stage 2 Compliance Monitoring – (start date based on system type and size)

Stage 2 Routine Compliance Monitoring

Determining Stage 2 Compliance Monitoring Sites (Worsheet 7.2)

Stage 2 Compliance Monitoring Site Selection Protocol (Exhibit 7.7)

How to Prepare a IDSE Report   Use Form 7 of the IDSE Guidance Manual (Chapter 7) Submit by mail or to EPA Submit by mail or to EPA to: to: Mail to: Stage 2 DBPRMail to: Stage 2 DBPR US EPA – IPMC US EPA – IPMC PO Box 98 PO Box 98 Dayton, OH Dayton, OH  Submit Updated Distribution Schematic Showing: Locations of Sources Locations of Sources Entry Points Entry Points Storage Facilities Storage Facilities Stage 2 Compliance Monitoring Locations Stage 2 Compliance Monitoring Locations

System Recordkeeping  Must keep a copy of their Standard Monitoring plan and IDSE report for 10 years after date of submittal and make available for review by the public  CCR must include the range of sample results from the IDSE monitoring in same calendar year as sampling occurred

Complete Schedule

Part 2 of the Stage 2 Rule - Compliance Monitoring 2012 and Beyond

Stage 2 Compliance Monitoring (2012 and Beyond)  MCL Compliance will be calculated based on LRAA  Operational Evaluation Levels – predicts whether you will have an MCL violation in the next monitoring period (a)

Operational Evaluation Levels (2012 and Beyond)  Reg Language: (a) You have exceeded the OEL at any monitoring location where the sum of the 2 previous quarters’ TTHM results plus twice the current quarter’s TTHM result, divided by 4 to determine an average, exceeds mg/L, or where the sum of the 2 previous quarters’ HAA5 results plus twice the current quarter’s HAA5 result, divided by 4 to determine an average exceeds mg/L. You have exceeded the OEL at any monitoring location where the sum of the 2 previous quarters’ TTHM results plus twice the current quarter’s TTHM result, divided by 4 to determine an average, exceeds mg/L, or where the sum of the 2 previous quarters’ HAA5 results plus twice the current quarter’s HAA5 result, divided by 4 to determine an average exceeds mg/L.  Example (for TTHMs): current quarter = Q2 (Q4 +Q1) + 2*(Q2) 4 ( ) + 2*(0.100) = mg/L 4   OEL = ≥ mg/L OEL EXCEEDED!

If OEL Is Exceeded...   Must conduct an Operational Evaluation and submit a written report of the evaluation to the State no later than 90 days after being notified of the analytical result that causes you to exceed the OEL.  Examination of System Treatment and Distribution Operational Practices including: Excess Storage Capacity Excess Storage Capacity Distribution System Flushing Distribution System Flushing Changes in Sources or Source Water Quality Changes in Sources or Source Water Quality Treatment Changes or Problems that may contribute to TTHM and HAA5 Formation Treatment Changes or Problems that may contribute to TTHM and HAA5 Formation

Summary of Stage 2 Requirements Determine IDSE Option (VSS, 40/30, SSS, or SMP) Submit IDSE (40/30 Cert, SSS, or SMP) Once Approved VSS – continue monitoring Stage 1(if applicable) 40/30 – continue monitoring Stage 1(if applicable) SSS (model) – conduct monitoring (continue Stage 1) SMP – conduct monitoring (continue Stage 1) After monitoring is complete, select new monitoring locations (out of IDSE and Stage 1 sites) Put together Stage 2 Monitoring Plan (IDSE Report) Stage 2 Compliance Monitoring & OELs

Contact Info: Amy Newbold EPA Region 4 Drinking Water Section (404) or